Attachment 9 SABER Sample Project SOW.pdf
PDF 12 MB Posted
- Attached to
- SABER - Mountain Home AFB Federal contract opportunity
- Solicitation number
- FA4897-10-R-0005
About this file
Attachment 9 SABER Sample Project SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.rtf | RTF text file | |
| SABER Questions and Answers.pdf | ||
| Pre-Bid Conference_Site Visit Minutes 072110.pdf | ||
| Attachment 6 Present and Past Performance Questionnaire.rtf | RTF text file | |
| Amendment 1.rtf | RTF text file | |
| Solicitation FA4897-10-R-0005.rtf | RTF text file | |
| Attachment 1 SABER SOW.docx | DOCX document | |
| Attachment 5 Wage Determination - Highway.docx | DOCX document | |
| Attachment 3 Wage Determination - Residential.docx | DOCX document | |
| Attachment 4 Wage Determination - Heavy.docx | DOCX document | |
| Attachment 2 Wage Determination - Building.docx | DOCX document | |
| Attachment 8 Determination of Responsibility.docx | DOCX document | |
| Attachment 6 Present Past Questionnaire.docx | DOCX document | |
| Attachment 7 Certificate of Compliance.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SABER Sample Project
STATEMENT OF WORK
Project: QYZH 10-XXXX Title: Construct Warehouse Project Manager: Rob Nelund Facility: XYZ Period of Performance: 120 Days Liquidated Damages: Does not apply to this delivery order Submittals: See attached document Government Furnished Material: None The following is a list of requirements pertaining to this delivery order:
Concrete Foundation and flatwork will be 3000 psi concrete Slabs to be 6” thick with WWF. Smooth trowel finish. FFE to be 2996.0???
Warehouse are to be sealed concrete
Masonry Masonry portion of walls to be 8’ high Lower exterior walls to be 8” CMU, split face, and fluted, running bond, water sealed at exterior, solid grouted with #5 vertical and horizontal bars Screen wall near double entrance to be same height as other masonry
Metals Upper exterior walls to be metal vertical siding, to 20’ above FFE at eaves.
Thermal and Moisture Protection Roof to be metal framed, 12/2 pitch SSM, insulated to R30 Insulate wall dividing office/latrine area to R22 Insulate exterior metal walls to R22
Openings Install 12’x12’ electrically operated, insulated rollup door centered on gable ends All doors HM with HM frame, enamel paint Exterior doors to be insulated Main exterior doors to be 6’0” x 7’0” x 1-3/4” with vision light Single exterior door to be 3’0”x7’0” x1-3/4” with vision light Double utility room doors 6’0” x 7’0” x 1-3/4” Double interior doors to be 6’0” x 7’0” x 1-3/4” with vision light Single interior door to be 3’0”x7’0” x1-3/4”
1.5 pr. Hinges on each door Use heavy duty closers on double and exterior doors Interior doors 3’0” x 7’0” x 1/3/4” HM with HM frame, enamel paint, Best compatible cylindrical lockset Install four windows, 4’ x4’ fixed, bronze anodized, blast resistant glass Construct one 10’x10’ office, men’s and women’s latrine, and utility room
Finishes Partition walls to be metal studs Wall between office area and warehouse to be full height All interior walls will be 5/8” GWB type X, taped, textured, primed and painted.
FA4897-10-R-0005 1 of 7 Attachment 9
Break area to have 6’ base and wall cabinets with sink and space for 25 c.f. refrigerator Office area to be carpeted, other areas to be VCT Latrines and utility room have hard ceilings 2’x4’ suspended ceilings in office and entry area
Specialties Install Knox box adjacent to main entrance Install 10 lb. ABC extinguisher at each exterior entrance in surface mount cabinet Install bathroom accessories and partitions
Fire Suppression Install wet pipe fire sprinkler system throughout
Plumbing Tap existing 24” sewer and install new lateral Tap existing 10” water main, install curb stop and new lateral Male latrine has one elongated bowl flushometer toilet, one urinal, two wall hung lavatories Female latrine has two elongate bowl flushometer toilets, two wall hung lavatories Install tankless water heater Install refrigerated drinking fountain
HVAC
HVAC in office areas to be natural gas fired, forced air ducted with refrigerated cooling HVAC in warehouse to be natural gas fired unit heaters and evaporative cooling Evaporative coolers to be ground level
Electrical Lights in office areas to be two tube, 4’ fluorescent troffers with occupancy sensors Lights in latrines to be two tube 4’ surface mount fixtures with occupancy sensors Locate LED exit/emergency lights at exterior doors Install office receptacles at residential spacing Electrical service to be two 400 amp, three phase electrical panels with exterior disconnect Install duplex receptacles in warehouse at 20’ intervals Warehouse interior lighting to be metal halide Install photo cell control light above each exterior door
Communications Install one telephone board in utility room with ground and receptacle Install one 48 port Ortronic cat.6 patch panels for phone and data Install duct for fiber optic cable to enter building Install conduit and 10 boxes with cat 6 cable Provide 10 quad jacks and faceplates
Earthwork Apply termiticide in accordance with U.F.C.
Grade native soil at 2% slope for 100’ around facility, 6” below F.F.E.
Electronic Safety & Security Install conventional FACP interfaced with Monaco D-21M wireless fire alarm reporting system Install horn/strobe devices as required by code Install manual pull stations at each exit
FA4897-10-R-0005 2 of 7 Attachment 9
Sample SABER Warehouse Project Assumptions valid on this project only
• Frost depth will be 36”
• Ground snow load is 30 lbs.
• Maximum sustained wind speed is 90 mph
• Existing 10” C900 water line has sufficient volume and pressure
• Existing primary electric has adequate capacity at nearest sectionalizer
• Existing 8” concrete sewer has adequate capacity
• Existing 4” polyethylene gas line has adequate capacity
• Curb cuts, driveway, and parking to be provided by others
• No rock will be encountered during excavation
• Nearest fire hydrant is approved for contractor use
• Native soil bearing strength is 2500 psf.
• Fiber optic for LAN and telephone to be provided to site by others
• Natural gas lateral and meter bar supplied by others
• Communications terminations/punchdown provided by others
• All work to be ADA compliant
• Average occupant load to be under 20
• Ten personal computers will be in use
• All colors will be selected from manufacturers’ standard palette to match existing
FA4897-10-R-0005 3 of 7 Attachment 9
DATE
MEMORANDUM FOR CONS/LGCB
FROM: 366 CES/CEPM
SUBJECT: PROJECT HAZMAT
1. The following facility has been identified for work under the SABER Program Project: Construct Warehouse Location: Bldg. XYZ Project Manager: Rob Nelund
2. This project does not involve the removal of material that may contain lead based paint products.
3. This project does not involve the removal of asbestos containing material.
4. This project does not involve the excavation of chlordane contaminated soils.
5. I have reviewed the requirements, including available technical documentation, and believe that it does not require the contractor to use Class I Ozone Depleting Chemicals (ODC’s) identified in the Air Force Policy in performance of any item or supply or as part of any service for this project.
SABER Project Manager
FA4897-10-R-0005 4 of 7 Attachment 9
FA4897-10-R-0005 5 of 7 Attachment 9
100 Ft
60 Ft
100 Ft
100 Ft
10 inch (10.0 inches) asbestos cement Water
8 inch (8.0 inches) polyvinyl chloride Water
Wa ter in ch (1
0.0 in ch es
) c as t ir on
W ate r
1inch (1.0 inch) Water
Wa ter
8 inch (8.0 inches) polyvinyl chloride Water
Wa ter
Wa ter
8 i nc h ( 8.0 in ch es ) p oly vin yl ch lor ide
W ate r
Wa ter in ch (1
0.0 in ch es
) c as t ir on
W ate r in ch
(1 0.0 in ch es ) c as t ir on W ate r
Invert El: 2989.80069402 ft Rim Elev. 2995.01721372 ft
11673 Invert El: 2984.68259922 ft Rim Elev. 2990.16158532 ft
8 inch (8.0 inches) concrete Sewer
6 i nc h ( 6.0 in ch es ) p oly vin yl ch lor ide
Se we r
8 inch (8.0 inches) concrete Sewer8 inch (8.0 inches) concrete Sewer
Elec
HDAL Elec
Elec ElecElec
Elec
2 inch (2.0 inches) HTHW2 1/2 inch (2.5 inches) HTHW 2 inch (2.0 inches) HTHW2 1/2 inch (2.5 inches) HTHW
Gas
2 inch (2.0 inches) Gas
4 inch (4.0 inches) PE Gas
4 i nc h ( 4.0 in ch es ) p las tic
G as
2 inch (2.0 inches) Gas
WALNUT
BOMBER STREET
1 S T
AV
EN
UE
LIBERATOR STREET
WALNUT
ACSR Elec
6 inch (6.0 inches) HTHW
2 1/2 inch (2.5 inches) HTHW
4 i nc h ( 4.0 in ch es ) p las tic
G as
2 i nc h ( 2.0 in ch es ) G as
T h i s m a p i s f o r r e f e r e n c e o n l y . A l t h o u g h e v e r y e f f o r t h a s b e e n m a d e t o e n s u r e t h e a c c u r a c y o f i n f o r m a t i o n , e r r o r s a n d c o n d i t i o n s o r i g i n a t i n g f r o m p h y s i c a l s o u r c e s u s e d t o d e v e l o p t h e d a t a b a s e m a y b e r e f l e c t e d o n t h i s m a p . C E P T s h a l l n o t b e l i a b l e f o r a n y e r r o r s , o m i s s i o n s , o r d a m a g e s t h a t r e s u l t f r o m i n a p p r o p r i a t e u s e o f t h i s d o c u m e n t .
T h i s m a t e r i a l i s F o r O f f i c i a l U s e O n l y .
U n a u t h o r i z e d r e p r o d u c t i o n , d i s t r i b u t i o n , p u b l i c a t i o n , o r e x h i b i t i o n o f t h i s m a t e r i a l i s S T R I C T L Y P R O H I B I T E D . D e s t r o y a s " F o r O f f i c i a l U s e O n l y " .
Saber Project Location Plan Mountain Home AFB, Idaho
Coordinate System:
UTM Zone 11 WGS84
Prepared By: 366 CES/CEPT Department of the Air Force
AC = Asbestos Containing Saber_TestProject_Building
Electrical Line Abandoned Airfield UG Primary OH Primary UG Secondary OH
< < Secondary UG O O Service OH ? ? Service UG
HCS Line
ABANDONED
Natural Gas Line Abandoned Main Service
Storm Sewer Line Abandoned Main Service
Water Line
MAIN
SERVICE
FIRE
SPRINKLER
ABANDONED
Fuel Line
ABANDONED
DEFUELING
MAIN
SERVICE
VENT
Wastewater Line
MAIN
SERVICE
ABANDONED
Map Name: RedStake.mxd
Geo Integration Office 828-1335 Printed: March 27, 2009 4:26:51 PM
1 inch = 30 feet 0 10 20 30 40 50
Ft
FA4897-10-R-0005 6 of 7 Attachment 9
1 Project Schedule (AF Form 3064) 2 3/4" minus gradation results 3 Modified Proctor results 5 Compaction results 6 Concrete mix design 7 Masonry shop drawings 8 Foundation/slab shop drawings 9 Slump test results 10 Air entrainment results 11 Fire sprinkler shop drawings 12 SSMR product data 13 Roof load calculations 14 Lighting calculations 15 Structural Steel shop drawings 16 HVAC load calculations 17 HVAC Product data 18 FACP data 19 Electrical entrance panel data 20 Warehouse lights data 22 Rollup door data 23 Door hardware data 24 Blast resistant windows data 25 Carpet data 26 VCT data 27 As-builts 28 GPS coordinates 29 Facility data worksheet 30 O&M manuals
LI
N
E N
U M
B E
R
REMARKS
R E
TU
R
N D
A
TE
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
S U
B M
IS
S
IO
N
D A
TE
C
O N
S /L
G C
B
S U
B M
IT
TA
L N
U M
B E
R S
SCHEDULE OF MATERIAL SUBMITTALS
SABER CONTRACT
FA4897-10-R-0005 7 of 7 Attachment 9
| Warehouse SOW.pdf |
| Warehouse Assumptions.pdf |
| Warehouse HAZMAT.pdf |
| Warehouse FloorPlan.pdf |
| Warehouse Site Plan.pdf |
| Schedule of Material Submittals (2).pdf |
File details come from the government source that posted it. Updated .