Attachment 4 Wage Determination - Heavy.docx

DOCX document 24 KB Posted

Attached to
SABER - Mountain Home AFB Federal contract opportunity
Solicitation number
FA4897-10-R-0005
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 4 Wage Determination - Heavy

View the file

Other files for this federal contract opportunity

Other files attached to SABER - Mountain Home AFB, newest first.
File Type Posted
Amendment 2.rtf RTF text file
SABER Questions and Answers.pdf PDF
Pre-Bid Conference_Site Visit Minutes 072110.pdf PDF
Attachment 6 Present and Past Performance Questionnaire.rtf RTF text file
Amendment 1.rtf RTF text file
Solicitation FA4897-10-R-0005.rtf RTF text file
Attachment 1 SABER SOW.docx DOCX document
Attachment 5 Wage Determination - Highway.docx DOCX document
Attachment 9 SABER Sample Project SOW.pdf PDF
Attachment 3 Wage Determination - Residential.docx DOCX document
Attachment 2 Wage Determination - Building.docx DOCX document
Attachment 8 Determination of Responsibility.docx DOCX document
Attachment 6 Present Past Questionnaire.docx DOCX document
Attachment 7 Certificate of Compliance.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: ID100012 06/04/2010 ID12

Superseded General Decision Number: ID20080012

State: Idaho

Construction Type: Heavy

Counties: Adams, Bear Lake, Benewah, Bingham, Blaine, Boise, Bonner, Bonneville, Boundary, Butte, Camas, Caribou, Cassia, Clark, Clearwater, Custer, Elmore, Franklin, Fremont, Gem, Gooding, Idaho, Jefferson, Jerome, Kootenai, Latah, Lemhi, Lewis, Lincoln, Madison, Minidoka, Nez Perce, Oneida, Owyhee, Payette, Power, Shoshone, Teton, Twin Falls, Valley and Washington Counties in Idaho.

HEAVY CONSTRUCTION PROJECTS

Superseeds General Decision ID020030001

Modification Number Publication Date 0 03/12/2010 1 04/16/2010 2 06/04/2010

CARP0001-010 09/01/2009

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH

PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE

COUNTIES

Rates Fringes

CARPENTER (Including Cement Form Work).......................$ 26.06 10.56

ZONE PAY:

ZONE 1 0-40 MILES FREE

ZONE 2 41-65 MILES $2.25/PER HOUR

ZONE 3 66-100 MILES $3.25/PER HOUR

ZONE 4 OVER 100 MILES $4.75/PER HOUR

DISPATCH POINTS:

PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee.

WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARP0808-004 01/01/2010

ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS,

CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM,

GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME,

LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE,

POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES

ZONE 1

CARPENTER (Including Cement Form Work).......................$ 26.57 8.10

ZONE PAY:

ZONE 1 0-30 MILES: FREE

ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR

ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR

If a project is located in more than one zone the lower zone rate shall apply

ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST

OFFICES:

BOISE: 304 N. 8TH STREET

TWIN FALLS: 253 2ND AVE. WEST

POCATELLO: CLARK STREET

IDAHO FALLS: 875 NORTH CAPITAL AVE.

ELEC0073-007 01/01/2010

IDAHO (SOUTH OF THE 46TH PARALLEL) COUNTY

Rates Fringes

CABLE SPLICER....................$ 28.62 3%+12.98

ELECTRICIAN......................$ 28.37 13.98

ELEC0073-008 01/01/2010

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH

Cable Splicer....................$ 28.62 3%+12.98

ELECTRICIAN......................$ 28.37 13.98

ELEC0291-007 01/01/2009

ADAMS, BOISE, ELMORE, GEM, PAYETTE, VALLEY AND WASHINGTON

CABLE SPLICER

Adams, Valley and Washington Counties.........$ 35.79 3%+$10.00 Boise, Elmore, Gem and Payette Counties............$ 32.50 3%+$10.00

ELECTRICIAN

Adams, Valley and Washington Counties.........$ 32.54 3%+$10.00 Boise, Elmore, Gem and Payette Counties............$ 29.54 3%+$10.00

ELEC0449-001 06/01/2009

BEAR LAKE, BINGHAM, BONNEVILLE, BUTTE, CARIBOU, CLARK, CUSTER,

FRANKLIN, FREMONT, JEFFERSON, LEMHI, MADISON, ONEIDA, POWER AND

TETON COUNTIES

ELECTRICIAN

All remaining counties......$ 27.00 5.5%+$10.00 Fremont and Teton Counties..$ 24.58 $9.10

ELEC0449-006 07/01/2009

BLAINE, CAMAS, CASSIA, GOODING, JEROME, LINCOLN, MINIDOKA AND

TWIN FALLS COUNTIES

ELECTRICIAN......................$ 23.00 5.5% + $8.90

ENGI0370-013 01/01/2010

ADAMS, BEAR LAKE, BINGHAM, BLAINE, BOISE, BONNEVILLE, BUTTE,

CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM,

GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME,

LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE,

POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES

(Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification)

Power equipment operator -bulldozer Including all attachments...$ 25.59 9.60 Power equipment operator -crane Over 50 tons................$ 25.96 9.60 Tower Crane Operator........$ 25.96 9.60 Up to and including 50 tons.$ 25.59 9.60 Power equipment operator -oiler............................$ 24.57 9.60 Power equipment operator -scraper

ALL SCRAPERS UP TO AND

INCLUDING 40 YARDS..........$ 25.59 9.60

All scrapers, pulling wagons, belly dumps and attachments, over 40 yards to and including 60 yards...$ 25.31 9.60 Elclid and similar, pulling wagons, belly dumps and attachments, over 60 yards to and including 80 yards..........$ 25.96 9.60 Euclid and similar, pulling wagons, belly dumps and attachments, over 80 yards to and including 100 yards.........$ 26.42 9.60 Euclids and similar, pulling wagons, belly dumps and attachments, over 100 yards..............$ 26.67 9.60

ZONE PAY:

ZONE 1 0-30 MILES: FREE

ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR

ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR

If a project is located in more than one zone the lower zone rate shall apply

ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST

OFFICES:

BOISE: 304 N. 8TH STREET

TWIN FALLS: 253 2ND AVE. WEST

POCATELLO: CLARK STREET

IDAHO FALLS: 875 NORTH CAPITAL AVE.

BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scale

NOTE: When the crane operator receives additional pay for long boom, the Oiler Shall also receive such additional pay. In computing the length of the boom on Tower Cranes, they shall be measured from the base of the tower to the point of the boom.

ENGI0370-014 06/01/2009

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH

ZONE 1: (Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification)

Power equipment operator -bulldozer (D-6 & equilvalent and over).......................$ 25.29 11.05 (To D-6 or equivalent)......$ 24.69 11.05 Power equipment operator -crane

25 TONS AND UNDER (ALL

ATTACHMENTS INCLUDING

CLAMSHELL, DRAGLINE)........$ 25.01 11.05

85 TONS AND OVER, AND ALL

CLIMBING, OVERHEAD, RAIL

AND TOWER...................$ 26.66 11.05

OVER 25 TONS UP TO AND

INCLUDING 45 TONS (ALL

ATTACHMENTS INCLUDING

CLAMSHELL, DRAGLINE)........$ 25.29 11.05

OVER 45 TONS TO BUT NOT

INCLUDING 85 TONS (ALL

ATTACHMENTS INCLUDING

CLAMSHELL, DRAGLINE)........$ 25.56 11.05

Power equipment operator -oiler............................$ 24.85 11.05 Power equipment operator -scraper (All, Rubber-Tired).........$ 25.29 11.05 (Multiple engine with three or scrapers)..........$ 25.56 11.05

Zone Differential (Add to Zone 1 rate): Zone 2- $2.00

BASE POINTS: Spokane, Pasco, Washington; Lewiston, Idaho

Zone 1: Within 45 radius miles from the main post office Zone 2: Outside 45 radius miles from the main post office

BOOM PAY: (All Cranes, including Tower) 180' to 250' $.50 over scale Over 250' $.80 over scale

NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

IRON0014-009 07/01/2009

ADAMS (REMAINDER OF COUNTY), IDAHO (SOUTH OF THE 46TH

PARALLEL), LEMHI (NORTHWEST CORNER), VALLEY (NORTHEASTERN 1/3)

AND WASHINGTIN (NORTHWESTERN 1/2) COUNTIES

Ironworkers: Rebar, Structural, Fence Erector........$ 30.79 17.40

IRON0014-010 07/01/2009

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH

Structural, Fence Erector........$ 30.79 17.40

* IRON0732-005 06/01/2010

ADAMS (EAST CORNER), BEAR LAKE, BINGHAM, BLAINE, BOISE, BUTTE,

BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CLUSTER, ELMORE,

FRANKLIN, FREMONT, GEM, GOODING, JEFFERSON, JEROME, LINCOLM,

LEMHI (REMAINDER OF COUNTY), MADISON, MINIDOKA, ONEIDA, OWYHEE,

PAYETTE, POWER, TETON, TWIN FALLS, VALLEY (SOUTHEAST 2/3), AND

WASHINGTON (SOUTHEAST 1/2) COUNTIES

Structural, Fence Erector........$ 26.00 14.70

LABO0155-003 01/01/2010

ADAMS, BEAR LAKE, BINGHAM, BLAINE, BOISE, BONNEVILLE, BUTTE,

CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN,

FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL),

JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA,

OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND

WASHINGTON COUNTIES

ZONE 1 (Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification)

Laborer: General/Cleanup.........$ 22.68 10.90

ZONE PAY:

ZONE 1 0-30 MILES: FREE

ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR

ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR

If a project is located in more than one zone the lower zone rate shall apply

ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST

OFFICES:

BOISE: 304 N. 8TH STREET

TWIN FALLS: 253 2ND AVE. WEST

POCATELLO: CLARK STREET

IDAHO FALLS: 875 NORTH CAPITAL AVE.

LABO0238-013 06/01/2009

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH

PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE

Laborer: General/Cleanup.........$ 22.66 8.75

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

SUID2003-007 09/03/2003

Rates Fringes

Cement Mason/Finisher............$ 20.22 7.98

LABORER: Tamper.................$ 8.00 2.84

Pipe layer.......................$ 14.26 0.00

Power equipment operator -backhoe..........................$ 18.96 4.42

Power Equipment Operator (Gradall)........................$ 22.84 3.62

Power Equipment Operator (Loader).........................$ 21.33 3.43

Power Equipment Operator Excavator...................$ 20.24 0.00

TRUCK DRIVER (6 Axle Dump).......$ 24.70 3.90

Truck Driver, Dump...............$ 17.82 0.00

TRUCK DRIVER: Water Truck.......$ 20.89 4.06

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

FA4897-10-R-0005 1 Attachment 4

File details come from the government source that posted it. Updated .