Questions_and_Answers_Updated.pdf

PDF 393 KB Posted

Attached to
MAFR Temporary Bunkhouse Federal contract opportunity
Solicitation number
FA485518R0026
Issued by
Department of the Air Force Special Operations Command

View the file

Other files for this federal contract opportunity

Other files attached to MAFR Temporary Bunkhouse, newest first.
File Type Posted
FA4855-18-R-0026-0003_Extend_Closing.pdf PDF
UPDATED_SOO_MAFR_TFB.pdf PDF
FA4855-18-R-0026-0002.pdf PDF
QUESTIONS_AND_ANSWERS.pdf PDF
Statement_of_Objectives-_MAFR_TFB.pdf PDF
FA4855-18-R-0026-0001_Bunkhouse.pdf PDF
FA4855-18-R-0026_Bunkhouse.pdf PDF
PP_Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS **UPDATE 1**:

TEMPORARY FIRE BUNKHOUSE

24 JUL 2018

(PICTURES OF SITE BELOW Q&A)

1. What is the the distance to the nearest water tie-in location, as well as the existing pipe size.

a. The connections will be within 75' of where the units will be located.

2. **UPDATED** How far to the nearest electrical supply and what is the available phasing, amps and voltage, or will we need to supply a new service through the local utility?

a. It is planned to be about 250' from the location of the Temporary Bunkhouse. Main line is 12470 Volt, 3 Phase line. The power request is for a 103 kW transformer with 120/240V single phase coming out of transformer.

3. Is there any soils report available for the proposed site?

a. I would have to do some digging for an actual report, however I can say that it is loose sand.

4. I have spoken with our site contractor and he was requesting photographs of the site. This will allow him to at least assemble an minimally knowledgeable proposal for the sitework, facilities.

a. Three pictures below.