QUESTIONS_AND_ANSWERS.pdf

PDF 391 KB Posted

Attached to
MAFR Temporary Bunkhouse Federal contract opportunity
Solicitation number
FA485518R0026
Issued by
Department of the Air Force Special Operations Command

About this file

Questions and answers with photos of proposed site.

View the file

Other files for this federal contract opportunity

Other files attached to MAFR Temporary Bunkhouse, newest first.
File Type Posted
FA4855-18-R-0026-0003_Extend_Closing.pdf PDF
FA4855-18-R-0026-0002.pdf PDF
UPDATED_SOO_MAFR_TFB.pdf PDF
Questions_and_Answers_Updated.pdf PDF
PP_Questionnaire.pdf PDF
FA4855-18-R-0026_Bunkhouse.pdf PDF
Statement_of_Objectives-_MAFR_TFB.pdf PDF
FA4855-18-R-0026-0001_Bunkhouse.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS:

TEMPORARY FIRE BUNKHOUSE

23 JUL 2018

(PICTURES OF SITE BELOW Q&A)

1. What is the the distance to the nearest water tie-in location, as well as the existing pipe size.

a. The connections will be within 75' of where the units will be located.

2. How far to the nearest electrical supply and what is the available phasing, amps and voltage, or will we need to supply a new service through the local utility?

a. It is planned for the electrical meter to be placed 250' from the trailer location.

3. Is there any soils report available for the proposed site?

a. I would have to do some digging for an actual report, however I can say that it is loose sand.

4. I have spoken with our site contractor and he was requesting photographs of the site. This will allow him to at least assemble an minimally knowledgeable proposal for the sitework, facilities.

a. Three pictures below.