CAFB 01 01 00 Gen Requirments for MAFR
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 01 00 Page 1
SECTION 01 01 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 PROJECT LOCATION
All work under this Project will be performed on Melrose Air Force Range (MAFR) located in Roosevelt County, approximately 30 miles West of Clovis, NM.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 101 (2012; Amendment 1 2012) Life Safety Code
NFPA 241 (2009) Standard for Safeguarding Construction,Alteration, and Demolition Operations
NFPA 30 (2012; Errata 2011; Errata 2011) Flammable and Combustible Liquids Code
NFPA 51B (2009; TIA 09-1) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;
Changes 4-6 2011; Change 7 2012) Safety and Health Requirements Manual
1.3 ISSUING OFFICE / NOTIFICATION OF WORK START
A. The following office is authorized to place delivery orders and will be responsible for their administration:
27th Special Operations Contracting Squadron 110 Allison Avenue
Cannon Air Force Base, NM 88103
B. The Contractor shall give at least 10 working days advance notice in writing to the Contracting Officer (CO) prior to beginning any work under this contract. The Contractor shall provide an "on-site start work" notice to the Contracting Officer stating the intended construction start and completion dates. The Contractor shall notify the Contracting Officer at least five working days prior to starting the on-site work, unless approved otherwise by the Contracting Officer.
Attachment 10
SECTION 01 01 00 Page 2
C. Coordinate with appropriate utility-locating agencies. A Base Civil Engineer Work Clearance Request Form AF 103 will be completed prior to any physical work taking place. AF 103 will be given to the Contractor during the pre-construction meeting. AF 103 must be signed and kept on site at all times with prime Contractor. Contractor shall schedule a meeting time to meet with each utility agency at the work site to locate affected utilities.
D. Clearance request is not valid until signed by the approving officer (Block 18 of AF 103). Approving officer will not sign until all locates are marked and all utility-locating agencies' signatures are on the form.
E. For excavation work: Work shall commence within 30 days after the approving Contracting Officer's signature, otherwise clearance request is invalid and a new request is required. Notify Contracting Officer immediately if new utilities were installed by others and not marked after all initial locates are made.
F. Contractor shall maintain all marked utilities in the field once they are initially marked by each utility agency. If markings are damaged, Contractor shall request new locates and shall give the locating agency 48 hours to perform the new locates.
G. Expenses for time and materials to perform repeat locates shall be borne by the Contractor, unless otherwise approved by the approving officer.
H. Cost to do the repeat locates will be deducted from the final invoice. In cases where utilities were marked late in the year and operations had to be shut down for winter, marked utilities would still have to be maintained by the Contractor by placing stakes or transcribing the marks on a drawing. When construction resumes, Contractor shall re-mark the site and may request verification of utility locations at no additional cost to him (Off-Base utility-locating agencies might request additional cost for repeat locates).
1.4 WORK SCHEDULE
A. Work Hours: Work hours on this Project shall be limited to Monday through Friday, between 0800 - 1600 hours, excluding federal holidays and designated wing safety days, unless approved otherwise in writing by the Contracting Officer.
B. Should the Contractor desire to work other than these hours, the Contractor must request approval in writing at least 14 calendar days prior to the period of the intended deviation. The Contractor shall not deviate from standard work hours unless permitted to do so in writing by the Contracting Officer.
1.5 FIRE AND SAFETY REGULATIONS
A. The contractor shall comply with all national, state, local and Air Force fire and safety regulations. The primary Air Force directives are:
1. AFOSH Standard 91-5 and CAFB Supplement 1.
SECTION 01 01 00 Page 3
2. AFOSH Standard 91-25 and CAFB Supplement 1.
3. AFOSH Standard 91-501 and CAFB Supplement 1.
4. AFI 91-203, Air Force Consolidated Occupational Safety Instruction.
B. The primary CAFB directive is CAFBI 32-201.
C. These directives may be reviewed at the Base Civil Engineering offices, Building 355, 506 North Air Commando Way, Cannon Air Force Base, NM 88103.
D. Prior to using any open-flame devices or welding equipment, the contractor and subcontractor personnel performing this type of work shall be certified per the requirements of AF Form 592, USAF Welding, Cutting and Brazing Permit. Certification training is provided by appointment and can be scheduled by contacting the CAFB Fire Department at (575)784-4490.
E. Compliance with the requirements set forth in NFPA 241, Building Construction and Demolition Operations, NFPA 51B, AFOSH 91-5, and OSHA 1910-252 is mandatory. Contractor must notify the Contracting Officer when hot work is required.
F. Training of Contractor Employees: Contractor shall ensure that all of their employees, including the employees of subcontractors, receive adequate and regularly scheduled safety training for the duration of each Project. As new employees of the Contractor and subcontractor are added during completion of this Project, the Contractor shall submit a written record of all of his/her employees and subcontractor employees receiving training.
G. Fire Prevention Responsibility: Contractor shall ensure that all of their employees, including the employees of subcontractors, receive an initial Fire Safety briefing prior to beginning any work at CAFB.
This briefing may be given by the CAFB Fire Department or may be given by other qualified personnel approved by the CAFB Fire Department.
Notice of the scheduled briefing shall be submitted in writing to the Fire Department at least five working days prior to the intended date of the briefing. The Contractor shall submit a written record to the Contracting Officer indicating that all of their employees and subcontractor employees have received this briefing. As new employees of the Contractor and subcontractor are added during the performance of this contract, update the written record to the Contracting Officer. The Contracting Officer shall retain the right to spot check employees to verify if they have been provided the briefing.
H. It is the inherent responsibility of the Contractor to practice good fire prevention measures while working at CAFB, including but not limited to:
I. The Contractor shall provide a "fire watch" person during all welding performed anywhere on base.
J. Welding, cutting or brazing will only be done after a valid AF Form 592 has been issued by the CAFB Fire Department. Daily permits are required for the operation of any asphalt kettles.
SECTION 01 01 00 Page 4
K. Fire extinguishers required during construction shall be supplied by the Contractor. The Contractor shall provide at least two operating fire extinguishers at the hot roof work location. The Contractor shall have a Type A fire extinguisher at the site of all cutting or welding operations.
L. Contractor personnel shall confine smoking to designated smoking area(s).
M. Flammable paints, oil, varnishes, etc., stored in inside storage shall be in a metal storage cabinet or in controlled outside storage. Flammables being used outside of these areas are limited to a one-day supply.
N. Temporary wiring must be in compliance with Article 305 of the National Electric Code.
1.6 AS-BUILT DRAWINGS
1. As converted drawings rarely convert completely and/or accurately, all drawings shall be "accomplished and submitted" in AutoCAD, NOT in some other CAD program and then converted.
2. The appropriate AutoCAD version for submitted drawings will depend on the version being used by CE at the time of submission. CE will provide the required version at NTP
3. Every drawing submitted shall be drawn with the following guidelines:
Architectural should be the type
Scale: 1" = 1"
Precision shall be 1/16" Lighting Units should be American "NORTH" shall be consistent throughout the set of drawings.
4. Any included Xrefs (cross-reference drawings) are required to be bound to a drawing. This is required to produce a stand-alone drawing totally independent from any/all xrefs, blocks or any other references and free from any/all required manipulation on the part of the Government. Scope layer is a new requirement, but it's a really good and useful idea.
5. Plot configurations and naming conventions are defined by Cannon AFB As-Built Submittal Guidelines of 3 Feb 2014 (attachment 1 As-built Submittal Guideline).
1.7 SAMPLING AND TESTING
A. All tests shall be performed using specified testing procedures or, if no procedure is specified, using the standard testing procedure established by the ASTM. The Contractor shall verbally notify the Contracting Officer at least 24 hours in advance of testing so that it may be observed by the Contracting Officer and/or his/her designated representatives, at the discretion of the Contracting Officer. In addition to the specified testing requirements herein, the Government may perform additional verification testing at its own expense. All necessary samples and/or work associated with such samples for such testing shall be provided by the contractor at no additional cost to the Government. Repairs required to correct the evidence of such Governmental testing shall be replaced at the contractor's expense within 24 hours unless otherwise directed in writing by the
SECTION 01 01 00 Page 5
Contracting Officer.
B. All necessary sampling shall be included by the Contractor in the Project Scope of Work.
1.8 UTILITIES
A. Reasonable amounts of water, electricity and other utilities are available to the Contractor at no cost. The Contractor shall include any temporary utility connections, if necessary, within the Project Scope of Work. The Contractor shall exercise strict conservation practices in the use of these utilities or, at the discretion of the Contracting Officer. Should the Contractor be found to not be using utility conservation practices the cost of the utilities may be transferred to the Contractor for the remaining performance period of the Contract.
B. As part of the Project Scope of Work, the Contractor is expected to provide adequate cell phone service for Contractor personnel as needed to accomplish the work. Internet and fax capabilities, if required, shall also be obtained by the Contractor at no additional cost to the Government
1.9 BASE CIVIL ENGINEER WORK CLEARANCE REQUEST
A. AF 103 Work Clearance Request: Before any alteration, demolition, or other construction work is begun, the Contractor shall obtain and fully process an AF 103. The Contractor shall process a separate request for each building requiring roof replacement that has an approved delivery order, unless approved otherwise.
B. This form can be obtained from the Construction Management Office, Base Civil Engineering, 506 North Air Commando Way, and it shall be prominently displayed on the job site at all times for review by the Contracting Officer. Since this form requires extensive coordination with several base agencies, allow at least 10 working days for completion.
C. Coordinate with appropriate utility-locating agencies, both on-base and off-base, as shown on the AF 103. Initially, this form will be given to the Contractor during the pre-construction conference.
Contractor shall complete and follow all instructions on this form before the start of work. A shop will not sign off on the AF 103 until the locate is performed. If a shop does not have a utility in the construction area, their particular block on the form will be signed.
CE shops have up to 72 hours to perform a locate. CE Environmental Flight has up to three days to process a permit, if applicable.
D. The Work Clearance Request is not valid until it is signed by the Contracting Officer. The Contracting Officer will not sign the request until all affected utility locates are marked in the field and all utility locating agency signatures are on the form. Work must commence within 30 calendar days of the Contracting Officer signature, otherwise a new work clearance request will be required.
E. Contractor shall notify the Contracting Officer immediately if discrepancies are found between assumed and actual field conditions.
F. Protection of Existing Utilities: All underground utilities and overhead utilities with their support poles shall be safeguarded and protected from damage by the Contractor at all times.
SECTION 01 01 00 Page 6
G. Communications Cables: Complete all excavations by hand-digging rather than machine methods, or expose cables by hand-digging prior to completing excavation by machine.
H. Contractor shall immediately report any damage to communication lines or equipment to the Contracting Officer. The Contractor shall commence restoration efforts immediately. Failure to complete acceptable restoration within four hours or an alternate period of time acceptable to the Contracting Officer may result in suspension of contract work until restoration is completed and accepted by the Contracting Officer.
I. The Government reserves the right to protect a damaged cable from further damage or deterioration and the right to restore priority circuits; these actions shall not relieve the Contractor of his full responsibility for restoration.
1.10 CONTRACTOR'S USE OF PREMISES
A. This Project will be constructed within and utilizing facilities which may continue to be in use and occupied during the construction. The Contractor shall coordinate all work to minimize inconvenience to facility occupants and to airfield operations.
B. The Contractor shall be responsible for removing any mechanical equipment or other obstructions as necessary to complete the required work. The Contractor shall return all removed mechanical equipment to its original location or as otherwise required.
C. The Contractor shall strive to minimize construction dust and noise. Contractor shall comply with base quiet hours (2200 - 0600).
When required by the Government, the contractor shall provide a water truck for watering down the haul routes for dust control, etc.
D. The Contractor shall not use traffic ways for storage areas unless granted permission to do so in writing by the Contracting Officer. At no time shall the contractor block hallways, traffic ways or other access areas.
1.11 ACCESS TO CONSTRUCTION SITE/HAUL ROUTES
A. The Contractor shall propose site access routes, haul routes and portions of existing parking and open areas for use by his work force for review and approval by the Contracting Officer.
B. The Contractor shall submit all proposed haul routes to the Contracting Officer for review and approval at least 10 working days prior to any hauling unless this requirement is expressly waived by the Contracting Officer. Proposed haul routes shall include all arrival, delivery and disposal routes that will be necessary during the course of the project. Haul routes are subject to change by the Government.
C. The Contractor shall provide daily clean-up of gravel or other debris dropped along the approved haul routes by the Contractor and/or subcontractor.
D. Contractor shall be responsible for maintaining, repairing and restoring existing parking and grass areas to their original condition. Normal wear and tear will be taken into account.
SECTION 01 01 00 Page 7
E. Employee parking shall be restricted to those areas approved by the Contracting Officer.
F. Security Forces will enforce traffic regulations, parking area assignments and security on Cannon AFB and Melrose AFR and the Contractor shall cooperate and coordinate to the fullest extent.
Security Forces is not responsible for the security of the Contractor's materials or equipment, etc.
G. All Contractors are advised that it is a violation of a posted traffic regulation to exceed 10 miles per hour while passing military personnel in formation, or a military group running or walking along the side of the road. Driving privileges on this installation may be suspended or canceled for violating posted traffic regulations or applicable state laws and will not be considered an excusable delay under the contract. Each Contractor must ensure that all of its employees have been informed of this information.
H. Contractor shall provide to the Contracting Officer, Security Forces, and entry control personnel, 72 hours advance notice for each entry into restricted areas, unless approved otherwise by the Contracting Officer. Delays due to lack of immediately available military escort for contractor personnel entering these areas shall be at the Contractor's expense.
1.12 CONTRACTOR'S STORAGE / OFFICE AREA
A. The Government will provide an on-base outdoor area for the Contractor's main storage area. Limit storage in this area to the materials and equipment that pertain to this Contract. This area shall be kept clean. Properly store hazardous materials.
B. The Contractor shall erect an approved 6 inch high chain link temporary fence screened with slats or black/green fabric covering around the main storage area. The Government is not responsible for any items stored in this area. Contractor will return the area in the same condition as when he received it.
C. The Contractor will also be provided, if necessary, an on-site outdoor storage area reasonably close (within 500 feet one way) to the work area. Limit storage in this area to the materials and equipment that pertain to the Project. This area shall be kept clean. Fencing may not be required. For high-visibility locations, the Contracting Officer may require black fabric fencing.
1.13 BARRICADES
A. Construct and maintain barricades as required by the Safety Officer, the MUTCD, OSHA, and Wing Safety personnel sufficient to prevent injury to persons and damage to property.
B. All unattended trenches and holes must be covered as required by safety regulations previously listed.
C. Provide and maintain warning lights and signs, as necessary, to prevent damage or injury. Keep warning lights on from dusk to dawn as required by safety regulations previously listed.
1.14 COLD WEATHER OPERATIONS
SECTION 01 01 00 Page 8
A. If any part of this project is pursued during periods of cold or inclement weather, the contractor shall take all appropriate precautions to protect facilities and work involved in the Project scope from damage by cold or inclement weather. The Contractor shall be responsible for snow removal required at the Project site.
1.15 SUBMITTALS
A. The Contractor shall submit all required Material Submittals on AF Form 3000 in accordance with instructions contained herein and as specified on AF Form 66, Schedule of Material Submittals, to the Contracting Officer for approval. The Government shall be allotted 10 working days to properly evaluate each material submittal and re-submittal. Contractor shall consider this time to evaluate submittals in his construction schedule.
B. "30 Days Prior to Starting Work on Order" means that the Contractor shall provide the material submittals (for the line items on the issued delivery orders only) to the Government for approval not later than 30 days prior to starting on-site construction work for that issued delivery order. When the material submittal for that line item is approved, that material submittal is approved for the entire duration of the Contract and does not have to be re-submitted for approval for each delivery order with that line item.
It does however; have to be re-submitted for informational purposes for each delivery order with that line item. Should there be a change from the approved material submittal, then it shall be re-submitted for re-approval.
C. Rejection of submittals for technical violations of the drawings or specifications will not be grounds for an extension of the performance period. If resubmittals are required, all parts of the original submittal package will be resubmitted together with changes so that coordination may be maintained.
D. Submittals will be consolidated by type (i.e. concrete, metal, wood) and all submittals for each specification section will be submitted at the same time.
E. Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in four copies. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the Project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the test to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.
1.16 CODES
A. References to standards, codes, specifications, recommendations and regulations refer to the latest edition/printing issued prior to the proposal receipt date.
B. These Construction Documents, and the joint and several phases of construction hereby contemplated are to be governed, at all times, by
SECTION 01 01 00 Page 9 applicable provisions of the Federal Law(s), including but not limited to, the latest amendments of the following:
1. Williams-Steiger Occupational Safety and Health Act of 1970, Public Law 91-596.
C. Code of Federal Regulations, Title 29, Parts 1910 (Occupational Safety and Health Standards) and 1926 (Safety and Health Regulations for Construction).
D. EM 385-1-1, USACE Safety and Health Requirements Manual.
E. Federal Standard 313B, as it pertains to the procurement, identification, marking and control of potentially toxic or hazardous materials, and to the reporting of information concerning these materials.
F. All International Building Codes, latest editions adopted by the Air Force.
G. NFPA 101, Life Safety Code.
H. NFPA 30, Flammable and Combustible Liquids Code.
I. Applicable portions of standards listed in the Specifications that are not in conflict with Contract Documents or with the Federal Acquisition Regulations (FAR).
J. All Air Force and CAFB Regulations as pertain to construction, safety, fire, health and associated activities are part of this Contract.
1.17 TERMS AND ABBREVIATIONS
A. The words "approved," "inspected," "directed," "selected," and similar words and phrases shall be presumed to be followed by "by Contracting Officer." The words "satisfactory," "submitted," "reported," and similar words or phrases shall be presumed to be followed by "to Contracting Officer".
B. Instructions, directions and requirements as specified shall be considered to be followed by the phrase "unless otherwise specified or indicated."
C. The approving official and point of contact for this Contract is the Contracting Officer. All direction and Contract requirements will be determined by the Contracting Officer. The Project Engineer/Project Inspector will work with the Contractor to provide the joint estimated quantities. The Project Engineer will designate the work areas and the performance time for each delivery order, which will be issued by the Contracting Officer.
D. The "CO" as used in this Contract is defined as the "Contracting Officer or his/her designated Representative".
1.18 SALVAGE
A. Equipment and materials indicated on the drawings, or as directed by the Contracting Officer, for reuse shall be approved by the Contracting Officer before re- installation. Contract amount includes cleaning, conditioning and installing materials indicated for reuse.
B. Any excess equipment and materials selected to remain the
SECTION 01 01 00 Page 10 property of the Government shall be removed by the Contractor and delivered in good condition to an on-base location to be determined by the Contracting Officer.
1.19 DISPOSAL AND REMOVAL OF GOVERNMENT MATERIALS AND EQUIPMENT
A. Materials and equipment to be disposed or removed from CAFB shall be identified by the Contractor and made known to the Contracting Officer. All such materials and equipment shall be approved in writing by the Contracting Officer prior to disposal or removal.
B. Solid Wastes: Minimum requirements for off-base solid waste disposal are as follows:
1. All wastes shall be disposed in a legally permitted solid waste disposal facility. Contractor is responsible for paying any and all dumping fees for CAFB materials.
2. Waste hauling from base to off-base disposal locations shall meet or exceed all requirements and restrictions levied by the State of New Mexico and pertinent municipalities including:
a. Meeting of any weight restrictions for any public roadways used.
b. Covering and securing all loads of waste other than earth materials to ensure that no materials are lost from each load during transit.
c. Prevention of overloading with earth materials such that load contents are prevented from escaping during transit.
C. Liquid Wastes:
Runoff and residues generated from any process including water-washing processes shall not be directly wasted to the sanitary sewer or to the storm drain system. They shall be collected, sampled and disposed of based on the results of the analysis of samples, compliance with EPA and NMED requirements and this specification. Contractor shall obtain the necessary permits from the State of New Mexico for the discharge of industrial waste water.
D. Concrete Pavers Disposal: On-base disposal site may be available as determined by the Contracting Officer's Representative.
1.20 HEALTH HAZARDS
A. Health Hazards: The Contractor shall comply with all sections of this specification regarding recognized health hazards in compliance with OSHA and all other pertinent regulations including but not limited to the following:
High Work: Provide safe means of access and fall prevention measures.
. Confined Spaces: Provide ventilation and adequate egress paths.
1.21 ENVIRONMENTAL CONCERNS AND HEALTH HAZARDS
A. Environmental Protection/Hazardous Materials: The Contractor shall strictly comply with Section 01 35 40 00 20, Environmental Management
SECTION 01 01 00 Page 11 of this Contract for protection of personnel, Government property, and the environment, and for hazardous material handling, use and disposal.
B. Hazardous Waste: The Contractor shall strictly comply with Section 01 35 40.00 20, Environmental Management of this Contract for hazardous waste accumulation and disposal.
C. Asbestos removal: If encountered, the Contractor shall strictly comply with all applicable Government regulations regarding asbestos removal and disposal.
D. Lead based paint removal: If encountered, the Contractor shall strictly comply with all applicable Government regulations regarding lead based paint removal and disposal.
E. DD FORM 1354: Upon completion and acceptance of new work for each delivery order, the AFPM or Contracting Officer Representative shall complete DD Form 1354, Transfer and Acceptance of Military Real Property and submit with AF Form 3000. The Contractor shall assist the AFPM/Contracting Officer Representative in completing the forms as requested.
F. CELL PHONE USE ON-BASE: Motor vehicle operators will not use cell phones on-base unless the vehicle is safely parked or they are using a hands-free device. This requirement applies to all Contractor's/subcontractor's vehicles as well as POVs used by the Contractor's/subcontractor's personnel to drive to/from the jobsite. A violation of this policy will result in the loss of on-base driving privileges for 30 days.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
-- End of Section --