Proposal_RFIs.docx

DOCX document 14 KB Posted

Attached to
Replace Primary/secondary Electrical P&G Area Federal contract opportunity
Solicitation number
FA4855-16-B-0007
Issued by
Department of the Air Force Special Operations Command

View the file

Other files for this federal contract opportunity

Other files attached to Replace Primary/secondary Electrical P&G Area, newest first.
File Type Posted
FA4855-16-B-0007_Abstract_SF_1409.pdf PDF
FA4855-16-B-0007-0002 _Remove_Bid_Guarantee.pdf PDF
1701_Junction_Box_Interior.pdf PDF
T253_Box_Interior.pdf PDF
Aerial_TP252.pdf PDF
1701_Junction_Box_Interior_2.pdf PDF
Transformer_T250_Service_Form.pdf PDF
Transformer_TP254_Service_Form.pdf PDF
Junction_Box_1710.pdf PDF
SV_Mtg_Mins_Follow_Up.docx DOCX document
SV_Mtg_Mins.docx DOCX document
Sheet_E101_New_Work.pdf PDF
FA4855-16-B-0007-0001 _Correct_SV_Date.pdf PDF
Attachment_8_CAFB_Sustainable_Landscape_Development_Plan__2012.pdf PDF
Attachment_5_CAFB_Architectural_Compatibility_Guide_2012.pdf PDF
sheet_ED101_Demolition_Plan.pdf PDF
FA4855-16-B-0007 _Electrical_P G_Area.pdf PDF
SOW_-_CZQZ_13-1196_rev3.pdf PDF
Sheet_E301_Electrical_Panel_Schedule.pdf PDF
Attachment_6_CAFB_Electrical_Standards__2014.pdf PDF
ATTACHMENT_2_SPECIFICATIONS.pdf PDF
Sheet_E401_Electrical_Details.pdf PDF
Sheet_E002_Continued_Legend.pdf PDF
Attachment_3_Asbuilt_Submittal_Guidelines_.pdf PDF
Sheet_E201_Electrical_One-Line_Diagram.pdf PDF
attachment_7_CAFB_and_Melrose_AFR_Civilian_Contractor_Environment_Guide_2015.pdf PDF
SHEET_E402_Electrical_details.pdf PDF
Sheet_E001_Legend_an_Symbols.pdf PDF
Sheet_E003_Site_Map.pdf PDF
attachment_4_SOMS_.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS

FA4855-16-B-0007

20 Apr 16

1. Do the existing U/G conduits and duct bank from the existing Sec. 1701 to existing transformer T253 meet the SOW requirements for duct banks ( 2-5" Sch80 conduits in 3000psi, red-dyed concrete)? If so, can these conduits be re-utilized for this project?

a. Existing 1701 to T253 duct bank and feeder to remain. Only new primary feeders will require 2-5" Conduits.

2. During rough-in of the new system, will we be able to penetrate into any ‘vault’ areas beneath Sec. 1701 or 1701A?

a. There are 2-spare 5" conduits in each Sectionalizer that may be intercepted and used in lieu of penetrating the vault areas.

3. For the induction lights, only Type 5 are currently available. Is this acceptable, or would LED lights be preferred.

a. Type 5 distribution will be acceptable for the Induction lights. LED fixture submissions will require a variance and strict conformance with referenced UFC 3-530-01 in SOW.

4. New transformers T252, T253, & T254 all feed distribution panels and lighting on their secondary sides. Are we to be responsible for the secondary protective devices ahead of these downstream devices?

a. Secondary Down Stream protection is shown on the Contract Documents Drawings Sheet E201 via wireway and to conform with NFPA 70 National Electrical Code - 2014. NFPA 70 National Electrical Code - 2014 is referenced in the SOW

5. What documents are required to be a part of the proposal submitted by each company?

a. Please see the solicitation and the requirements listed in Sections L & M.

6. Will the Air Force furnish current AutoCad construction files for use in developing the project drawings?

a. ACAD drawings of Contract Drawings will be available for Contractor to facilitate preparation of Shop drawings and Asbuilts.

File details come from the government source that posted it. Updated .