Solicitation(IFB).doc
DOC document 290 KB Posted
- Attached to
- Repair Sections Around East Aderholt Loop Federal contract opportunity
- Solicitation number
- FA4855-15-B-0009
About this file
Invitation for Bid Document
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_Amendment.doc | DOC document | |
| Cannon_Bid_Question_Response.pdf | ||
| Drawings_Revised.pdf | ||
| Specifications_Revised.pdf | ||
| Attachment_8._Wage_Determination_NM50.pdf | ||
| Attachment_6.Comm_Call_Out.pdf | ||
| Attachment_7._Environmental_Guide.pdf | ||
| Attachment_2._Drawings.pdf | ||
| Attachment_3._Specifications.pdf | ||
| Attachment_4.SOMS.pdf | ||
| Attachment_1._Statement_of_Work.pdf | ||
| Attachment_5._OPSEC_Contract_Addendum.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section A - Solicitation/Contract Form
SF 1442 CONTINUATION SHEET
The preferred method of completion for Representations and Certifications is at the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/. If you are unable to use this method, contact the Contracting Officer (CO) for a full copy prior to date/time scheduled for receipt of offers. Failure to complete all required Representations and Certifications may render your proposal ineligible for award.
PRE-PROPOSAL CONFERENCE AND SITE VISIT
In accordance with FAR 52.236-27, a pre-proposal conference / site visit will be conducted at Cannon AFB on 20 March 2015 at 9:00 AM Mountain Daylight Time (MDT). A familiarization tour of the base and a site visit will follow. All offerors are highly encouraged to attend this conference. Prospective offerors desiring to attend should submit a request to attend to SSgt Timothy Ogburn or TSgt Joshua Kinsey no later than 4:00 MDT on 17 March 2015. Offerors may contact this office between the hours of 8:00 AM and 4:00 PM MDT. Contact information for TSgt Joshua Kinsey is (575) 784-6869 or by email at joshua.kinsey@us.af.mil. Contact information for SSgt Timothy Ogburn is (575) 784-2948, or by email at timothy.ogburn@us.af.mil. Facsimiles will not be accepted.
NOTE: To receive a base visitor’s pass for access to the base, personnel must possess two forms of identification, at least one with a photo, such as U.S. Passport (unexpired or expired), a valid State or Government picture identification card, voter’s registration card, or original or certified copy of a U.S. birth certificate. Personnel requesting vehicle access must also provide a valid driver’s license, and valid vehicle insurance certificate.
SUBMISSION OF QUESTIONS
Questions regarding this solicitation shall be submitted in writing to SSgt Timothy Ogburn and TSgt Joshua Kinsey via e-mail to joshua.kinsey@us.af.mil or timothy.ogburn@us.af.mil. Facsimiles will not be accepted. All questions must be received no later than close of business 25 March 2015.
SUBMISSION OF PROPOSALS
Offerors are responsible for submitting proposals so as to reach the Government office designated in the solicitation by the date/time specified. Note that the Government office designated for receipt of proposals is the address shown in Block 7 of the SF1442.
Personnel wishing to hand-deliver proposals must notify both of the individuals listed below via email not later than 72 hours prior to the date and time established for receipt of proposals to gain access to Cannon AFB. Entry to Cannon AFB is at the Main Gate off Hwy 60/84. Please allow additional time to arrive at the visitor’s center at the Main Gate during high traffic periods.
Points of Contact: SSgt Timothy Ogburn (timothy.ogburn@us.af.mil ) and TSgt Joshua Kinsey (joshua.kinsey@us.af.mil).
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Repair Sections E. Aderholt Loop
FFP
1. Provide all plant, labor, equipment, material, transportation, supervision, and other incidentals necessary for construction for the accomplishment of the work in accordance with the Statement of Work, Drawings, and all attachments found in Section J of this IFB.
2. Total Performance period for this project will be 270 days from the issuance of the Notice to Proceed. Weather days will be applied for by the contractor and approved by the contracting officer. Both the Government and the Contractor will track weather delays.
3. Payment and performance bonds will be required within 10 calendar days of award. 4. Progress Schedule: Required within 7 calendar days from issuance of Notice to Proceed. 5. Notice to Proceed (NTP): Will be issued upon agreement of the Government and the Contractor, after receipt of original payment and performance bonds and completed AF form 103, Dig 6. Pre-Performance Conference will be held at a later date
7. Wage Determination NM50 dated 02 January 2015 applies to this project. 8. FOB: Destination
FOB: Destination
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
NMGRT CLIN 0001
New Mexico Gross Receipts Tax @ 6.125% for CLIN 0001
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Additive 1:Aggregate Shoulders
Additive Bid Item 1:This is considered priority 1 of 2. Additive requirement to provide a 2-ft wide x 12-in deep granular shoulder in lieu of graded earth shoulders in strict accordance with option 1 on page 65 of Attachment 2 (Drawings). This item is subject to the terms and conditions of the contract and all attachments in section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
NMGRT Alt. 1
NMGRT @ 6.125% for Alternate 1 option
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Additive 2:New Aggregate Base
Additive Bid Item 2: This is considered priority 2 of 2. Additive requirement to replace base course and compact subgrade in strict accordance with option 2 on page 65 of Attachment 2 (Drawings). This item is subject to the terms and conditions of the contract and all attachments in section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
NMGRT Alt. 2
NMGRT @ 6.125% for Alternate 2
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
Block 17b. Applies to this contract.
REMITTANCE ADDRESS
If the remittance address is different from the mailing address, enter the remittance address below. Failure to provide this information may impact payment.
110 E. Alison Avenue
Cannon AFB, NM 88103
ATTN: SSgt Timothy Ogburn Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| 270 dys. ADC |
| 1 |
| 27 SOCES/CEX |
JESSICA ELSIK
118 OCTAGON AVE
CANNON AFB NM 88103
575-784-2018
F1L3J2
| 0002 |
| 270 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F1L3J2
| 0003 |
| 270 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F1L3J2
| 0004 |
| 270 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F1L3J2
| 0005 |
| 270 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F1L3J2
| 0006 |
| 270 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F1L3J2
CLAUSES INCORPORATED BY REFERENCE
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
Section G - Contract Administration Data
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through
WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Construction
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
Government
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
Issue By DoDAAC
FA4855
Admin DoDAAC
Inspect By DoDAAC
Ship To Code
F1L3J2
Ship From Code
Mark For Code
Service Approver (DoDAAC)
Service Acceptor (DoDAAC)
Accept at Other DoDAAC
LPO DoDAAC
DCAA Auditor DoDAAC
Other DoDAAC(s)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
Section H - Special Contract Requirements
ENVIRONMENTAL REQUIREMENTS
ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a government installation shall be handled, transported, stored, and disposed of by the contractor and by his subcontractors at any time in accordance with all applicable Federal, state, or local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of law, including but not limited to Executive Order 12088, 13 October 1978, the Federal Water Pollution Control Act, as amended (33 USC Sec 1251 ET SEQ); The Clean Air Act, as amended (42 USC SEC 1857 ET SEQ); the Endangered Species Act, as amended (16 USC Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 USC 2601, ET SEQ); the National Historic Preservation Act, as amended (16 USC Sec 470, ET SEQ); the Solid Waste Act, as amended (42 USC 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 USC Sec 469, ET SEQ).
HAZARDOUS MATERIALS USAGE REPORTING
Contractor shall identify and report hazardous materials, as defined by FED-STD-313D, used during the performance of this contract. This list shall include the following:
Product name of material
Manufacturer of material if not specified on MSDS
Job for which the material is/was used
Amount of material used in weight or volume
As an attachment to the report, Contractor shall provide a MSDS for each material listed. Contractor shall submit this Report to the Contracting Officer before beginning performance under this contract. This initial report will provide usage estimates for each hazardous material. Thereafter, Contractor shall submit reports quarterly that contain actual usage information. The Contracting Officer will forward these reports to CAFB HazMart (27 SOLRS/LGSDMH) for hazardous material inventory tracking purposes. HazMart in consultation with 27 SOCE/CEV may determine after review of the initial report that follow-on reports are not necessary.
(End)
CLAUSES INCORPORATED BY FULL TEXT
CAFB 2009-1 VPP Elements for Requirements Documents (6 APRIL 2009) Service and construction requirement documents shall include the following specifications for "applicable contractors:"
1. DEFINITIONS:
Applicable contractors. These requirements apply only to contractors whose employees work more than 1000 hours per quarter on a government installation, Days Away, Restricted, and or Transfer Case Incident Rate (DART). Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.
Total Case Incidence Rate (TCIR). Total number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.
2. Cannon AFB is in the process of pursuing VPP recognition or has already been recognized under the OSHA Voluntary Protection Program (VPP). VPP impacts all "applicable contractors" operating on Air Force Installations. It is the contractor's responsibility to ensure its employees and managers have a comprehensive understanding of VPP as well as full compliance with OSHA requirements. Contractors (to include applicable contractors), whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of the installation or VPP site. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html.
3. Applicable contractors are required to submit their TCIR and DART rates and OSHA Form 300A annually to the contracting office for consolidation and submission as part of the installation's annual VPP Safety and Health Management report. TCIR and DART rates are due by the 15th of January of each year.
4. An applicable contractor's Quality Control Plan must identify the processes and procedures the contractor will use to track compliance with the Safety and Health Plan, and the process and procedures that will be used to correct violations.
5. It is the applicable contractor's sole responsibility for compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596). The contractor must submit a Safety and Health Plan and corresponding site safety checklist to the contracting officer 10 days after contract award. The contractor's plan shall include appropriate measures to ensure the contractor reacts promptly to investigate, correct and track alleged safety & health violations and/or uncontrolled hazards in contractor work areas. Additional, installation specific references and policies may be included/attached to this section. The plan shall:
5.1. demonstrate a management commitment to employee safety and health;
5.2. identify the application of the safety and health plan to subcontractors;
5.3. identify the roles and responsibilities of the following individuals:
5.3.1. Management;
5.3.2. Supervisors;
5.3.3. Employees;
5.3.4. Safety Coordinator;
5.4. identify applicable safety rules and regulations;
5.5. include a worksite hazard analysis to include base-line hazard identification and required control measures;
5.6. include a job site analysis to include hazards of tasks required to control measures;
5.7. identify employee safety and health training requirements and the documentation process;
5.8. include a workplace inspection frequency, to include identifying the individual conducting the inspections;
5.9. include employee hazard reporting procedures;
5.10. identify individual(s) responsible for corrective action hazards;
5.11. identify first aid/injury procedures;
5.12. identify procedures for accident investigation and reporting;
5.13. identify emergency response procedures; and
5.14. identify the process for tracking controlled hazards in contractor work areas
6. An applicable contractor is responsible for establishing these requirements for all subcontractors who qualify as applicable contractors under the resulting contract.
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
| 52.203-2 |
| Certificate Of Independent Price Determination |
| APR 1985 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| APR 2010 |
| 52.203-14 |
| Display of Hotline Poster(s) |
| DEC 2007 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| JUL 2013 |
| 52.204-13 |
| System for Award Management Maintenance |
| JUL 2013 |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications. |
| DEC 2014 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| AUG 2013 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| JUL 2013 |
| 52.211-13 |
| Time Extensions |
| SEP 2000 |
| 52.214-26 |
| Audit and Records--Sealed Bidding |
| OCT 2010 |
| 52.214-28 |
| Subcontracting Certified Cost Or Pricing Data--Modifications--Sealed Bidding |
| OCT 2010 |
| 52.214-29 |
| Order Of Precedence--Sealed Bidding |
| JAN 1986 |
| 52.219-6 |
| Notice Of Total Small Business Set-Aside |
| NOV 2011 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| OCT 2014 |
| 52.219-14 |
| Limitations On Subcontracting |
| NOV 2011 |
| 52.222-1 |
| Notice To The Government Of Labor Disputes |
| FEB 1997 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-4 |
| Contract Work Hours and Safety Standards- Overtime Compensation |
| MAY 2014 |
| 52.222-6 |
| Construction Wage Rate Requirements |
| MAY 2014 |
| 52.222-7 |
| Withholding of Funds |
| MAY 2014 |
| 52.222-8 |
| Payrolls and Basic Records |
| MAY 2014 |
| 52.222-9 |
| Apprentices and Trainees |
| JUL 2005 |
| 52.222-10 |
| Compliance with Copeland Act Requirements |
| FEB 1988 |
| 52.222-11 |
| Subcontracts (Labor Standards) |
| MAY 2014 |
| 52.222-12 |
| Contract Termination-Debarment |
| MAY 2014 |
| 52.222-13 |
| Compliance With Construction Wage Rate Requirements and Related Regulations |
| MAY 2014 |
| 52.222-14 |
| Disputes Concerning Labor Standards |
| FEB 1988 |
| 52.222-15 |
| Certification of Eligibility |
| MAY 2014 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| FEB 1999 |
| 52.222-26 |
| Equal Opportunity |
| MAR 2007 |
| 52.222-27 |
| Affirmative Action Compliance Requirements for Construction |
| FEB 1999 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| JUL 2014 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-37 |
| Employment Reports on Veterans |
| JUL 2014 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| FEB 2009 |
| 52.222-54 |
| Employment Eligibility Verification |
| AUG 2013 |
| 52.222-55 |
| Minimum Wages Under Executive Order 13658 |
| DEC 2014 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2011 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-9 |
| Estimate of Percentage of Recovered Material Content for EPA-Designated Items |
| MAY 2008 |
| 52.223-10 |
| Waste Reduction Program |
| MAY 2011 |
| 52.223-17 |
| Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts |
| MAY 2008 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.227-4 |
| Patent Indemnity-Construction Contracts |
| DEC 2007 |
| 52.228-2 |
| Additional Bond Security |
| OCT 1997 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.228-11 |
| Pledges Of Assets |
| JAN 2012 |
| 52.228-15 |
| Performance and Payment Bonds--Construction |
| OCT 2010 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.232-5 |
| Payments under Fixed-Price Construction Contracts |
| MAY 2014 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-23 Alt I |
| Assignment of Claims (May 2014) - Alternate I |
| APR 1984 |
| 52.232-27 |
| Prompt Payment for Construction Contracts |
| MAY 2014 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.236-1 |
| Performance of Work by the Contractor |
| APR 1984 |
| 52.236-2 |
| Differing Site Conditions |
| APR 1984 |
| 52.236-3 |
| Site Investigation and Conditions Affecting the Work |
| APR 1984 |
| 52.236-4 |
| Physical Data |
| APR 1984 |
| 52.236-5 |
| Material and Workmanship |
| APR 1984 |
| 52.236-6 |
| Superintendence by the Contractor |
| APR 1984 |
| 52.236-7 |
| Permits and Responsibilities |
| NOV 1991 |
| 52.236-8 |
| Other Contracts |
| APR 1984 |
| 52.236-9 |
| Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements |
| APR 1984 |
| 52.236-10 |
| Operations and Storage Areas |
| APR 1984 |
| 52.236-11 |
| Use and Possession Prior to Completion |
| APR 1984 |
| 52.236-12 |
| Cleaning Up |
| APR 1984 |
| 52.236-13 |
| Accident Prevention |
| NOV 1991 |
| 52.236-14 |
| Availability and Use of Utility Services |
| APR 1984 |
| 52.236-15 |
| Schedules for Construction Contracts |
| APR 1984 |
| 52.236-17 |
| Layout of Work |
| APR 1984 |
| 52.236-21 |
| Specifications and Drawings for Construction |
| FEB 1997 |
| 52.236-26 |
| Preconstruction Conference |
| FEB 1995 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.242-14 |
| Suspension of Work |
| APR 1984 |
| 52.243-4 |
| Changes |
| JUN 2007 |
| 52.243-5 |
| Changes and Changed Conditions |
| APR 1984 |
| 52.246-21 |
| Warranty of Construction |
| MAR 1994 |
| 52.248-3 |
| Value Engineering-Construction |
| OCT 2010 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-2 Alt I |
| Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - Alternate I |
| SEP 1996 |
| 52.249-10 |
| Default (Fixed-Price Construction) |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| DEC 2014 |
| 252.223-7001 |
| Hazard Warning Labels |
| DEC 1991 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JUN 2013 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| DEC 2012 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.236-7000 |
| Modification Proposals-Price Breakdown |
| DEC 1991 |
| 252.236-7001 |
| Contract Drawings, and Specifications |
| AUG 2000 |
| 252.239-7001 |
| Information Assurance Contractor Training and Certification |
| JAN 2008 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM
EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
(a) This contract and employees working on this contract will be subject to the whistleblower rights and remedies in the pilot program on Contractor employee whistleblower protections established at 41 U.S.C. 4712 by section 828 of the National Defense Authorization Act for Fiscal Year 2013 (Pub. L. 112-239) and FAR 3.908.
(b) The Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 41 U.S.C. 4712, as described in section 3.908 of the Federal Acquisition Regulation.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts over the simplified acquisition threshold.
(End of clause)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 day after NTP. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $506.35 for the first and last day of the delay, and $256.34 for each additional calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.222-99 ESTABLISHING A MINIMUM WAGE FOR CONTRACTORS (DEVIATION 2014-O0017) (JUNE 2014)
This clause implements Executive Order 13658, Establishing a Minimum Wage for Contractors, dated February 12, 2014, and OMB Policy Memorandum M-14-09, dated June 12, 2014.
(a) Each service employee, laborer, or mechanic employed in the United States (the 50 States and the District of Columbia) in the performance of this contract by the prime Contractor or any subcontractor, regardless of any contractual relationship which may be alleged to exist between the Contractor and service employee, laborer, or mechanic, shall be paid not less than the applicable minimum wage under Executive Order 13658. The minimum wage required to be paid to each service employee, laborer, or mechanic performing work on this contract between January 1, 2015, and December 31, 2015, shall be $10.10 per hour.
(b) The Contractor shall adjust the minimum wage paid under this contract each time the Secretary of Labor’s annual determination of the applicable minimum wage under section 2(a)(ii) of Executive Order 13658 results in a higher minimum wage. Adjustments to the Executive Order minimum wage under section 2(a)(ii) of Executive Order 13658 will be effective for all service employees, laborers, or mechanics subject to the Executive Order beginning January 1 of the following year. The Secretary of Labor will publish annual determinations in the Federal Register no later than 90 days before such new wage is to take effect. The Secretary will also publish the applicable minimum wage on www.wdol.gov (or any successor website). The applicable published minimum wage is incorporated by reference into this contract.
(c) The Contracting Officer will adjust the contract price or contract unit price under this clause only for the increase in labor costs resulting from the annual inflation increases in the Executive Order 13658 minimum wage beginning on January 1, 2016. The Contracting Officer shall consider documentation as to the specific costs and workers impacted in determining the amount of the adjustment.
(d) The Contractor Officer will not adjust the contract price under this clause for any costs other than those identified in paragraph (c) of this clause, and will not provide price adjustments under this clause that result in duplicate price adjustments with the respective clause of this contract implementing the Service Contract Labor Standards statute (formerly known as the Service Contract Act) or the Wage Rate Requirements (Construction) statute (formerly known as the Davis Bacon Act).
(e) The Contractor shall include the substance of this clause, including this paragraph (e) in all subcontracts.
(End of clause)
52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) \1\
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
(End of clause)
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR: http://farsite.hill.af.mil/
DFARS: http://farsite.hill.af.mil/vfdfara.htm AFFARS: http://farsite.hill.af.mil/vfaffara.htm (End of clause)
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of clause)
252.204-7006 BILLING INSTRUCTIONS (OCT 2005)
When submitting a request for payment, the Contractor shall--
(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and
(b) Separately identify a payment amount for each contract line item included in the payment request.
(End of clause)
5352.201-9101 OMBUDSMAN (APR 2014)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Lt Col Gerald I. Ray, Jr., AFICA/KO, 427 Cody Avenue (Bldg 90333), Hurlburt Field, FL 32544-5407, Phone: (850) 554-3990, DSN: 579-3990, Fax: (850) 884-2476, Email: Gerald.Ray@us.af.mil. Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/HQ AFICA/AFISRA/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.
(End of clause)
5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (NOV 2012)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, social security card, and valid vehicle insurance certificate to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Integrated Defense, and AFI 31-501, Personnel Security Program Management].
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) Failure to comply with these requirements may result in withholding of final payment.
(End of clause)
CAFB 2012-1 Antiterrorism/Force Protection (ATFP) (5 Dec 2011)
(a) Contractors are integral Cannon AFB multipliers which provide additional sets of eyes to maintain security vigilance and report suspicious activity (activities) affecting our base community. All contractor personnel shall comply with Antiterrorism/Force Protection measures as specified in this clause.
(b) Contractors and all personnel employed by the contractor in the performance of this contract shall not park any vehicle closer than 82 feet next to primary occupancy facilities (50+ personnel), 33 feet next to inhabited facilities (11-49 personnel), with the exception of already established parking areas for any Cannon AFB facility. Contractor equipment will not be placed any closer than 33 feet of any facility. Exceptions to this policy will need to be approved in writing by the Contracting Officer. The Contracting Officer shall coordinate with the 27th Special Operations Wing Antiterrorism Office and the 27th Special Operations Security Forces Squadron prior to approval/disapproval of waiver request(s).
(c) During increased Force Protection Conditions (FPCONs), entry requirements to the installation may change with little to no notice. Depending on the incident or threat, all personnel, to include contractors, may be denied access to the installation for safety/security reasons.
(i) During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges or workers pass must be sponsored onto the installation.
(ii) During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.
(iii) During Higher FPCONs (Charlie and Delta) the base will curtail non-essential operations/functions; access by Non-Essential Contractors will be suspended at the direction of the Installation Commander.
(d) Contractors are subject to spot checks or inspections of their vehicles and personal items at entry control points or facility access points during higher threats or during random antiterrorism measure checks. Failure to comply with these added security measures may result in denial of access to the installation.
(e) Contractors are encouraged to receive Antiterrorism Awareness Training annually available at no cost; however, it is not mandatory in CONUS. Installation, Mission Element or the Unit Antiterrorism Representative (ATR) can provide this training when requested. For personnel who do not have access to the Air Force’s Advance Distance Learning System (ADLS), they can receive this training from the following web site: https://atlevel1.dtic.mil/at/. Contractors can play an important role in protecting the installation and are encouraged to report suspicious activities to Security Forces by either calling 911 during emergencies or 784-4111.
(f) Contractors and all employees of the contractor will adhere to all Random Antiterrorism Measures (RAMs) and participate in Cannon AFB Antiterrorism exercises/scenarios according to contract, as directed by the Contracting Officer.
Operations Security (OPSEC)
As applicable based on the scope and nature of the contract, the contractor shall comply with Government OPSEC guidance and training as prescribed in AFI 10-701, Operations Security, Chapter 4, paragraph 5.1 and AFI 33-332, Privacy Act, for handling of For Official Use Only (FOUO) information. Government provided OPSEC training is offered at no charge to the contractor. The contractor shall notify the Contracting Officer within one business day upon the discovery of any OPSEC violations. The Contracting Officer will immediately notify the applicable Unit OPSEC representative of any OPSEC violations reported by the contractor.
Communications Security (COMSEC)
The contractor shall comply with Government COMSEC requirements as contained in AFI 33-201V2, Communications Security, user requirements and USAFA COMSEC Manager guidance/directives.
(End Clause)
Section J - List of Documents, Exhibits and Other Attachments
LIST OF ATTACHMENTS
| Attachment Number |
| Title |
| Pages |
| Date |
| 1 |
| Statement of Work |
| 4 |
| 13-Feb-15 |
| 2 |
| Drawings |
| 65 |
| 13-Feb-15 |
| 3 |
| Specifications |
| 160 |
| 11-Feb-15 |
| 4 |
| Schedule of Material Submittals |
| 3 |
| 26-Feb-15 |
| 5 |
| OPSEC Addendum |
| 1 |
| 15-Dec-13 |
| 6 |
| Communications Call-out |
| 1 |
| 28-Jan-15 |
| 7 |
| Environmental Guide |
| 28 |
| 18-Aug-11 |
| 8 |
| Wage Determination NM50 |
| 7 |
| 2-Jan-15 |
Section K - Representations, Certifications and Other Statements of Offerors
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.
(2) The small business size standard is $36,500,000.00.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .