Attachment_6.Comm_Call_Out.pdf
PDF 530 KB Posted
- Attached to
- Repair Sections Around East Aderholt Loop Federal contract opportunity
- Solicitation number
- FA4855-15-B-0009
About this file
Communications Call-Out
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Drawings_Revised.pdf | ||
| Specifications_Revised.pdf | ||
| SF30_Amendment.doc | DOC document | |
| Cannon_Bid_Question_Response.pdf | ||
| Attachment_5._OPSEC_Contract_Addendum.pdf | ||
| Attachment_7._Environmental_Guide.pdf | ||
| Attachment_2._Drawings.pdf | ||
| Solicitation(IFB).doc | DOC document | |
| Attachment_8._Wage_Determination_NM50.pdf | ||
| Attachment_3._Specifications.pdf | ||
| Attachment_4.SOMS.pdf | ||
| Attachment_1._Statement_of_Work.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
27TH SPECIAL OPERATIONS COMMUNICATIONS SQUADRON (AFSOC)
CANNON AIR FORCE BASE NEW MEXICO
MEMORANDUM FOR: AFSOC 27 SOCE 28 Jan 2015
FROM: 27SOCS/SCXP
SUBJECT: CZQZ131036 Aderholt
1. The requirements of the following reference documents will be used all communications work supporting this effort:
A. ETL 02-12, Unified Facilities criteria, B. UFC -3-580-01, C. AFSOCI 33-105, D. EIA/TIA Communication Standards, (most current standard date at time of contract award)
E. AFSSI 7703,
F. NEC standards, G. RUS standards, H. MIL-STD-188-124B, Ground and Bonding,
2. 27 SOCS provides the following local guidance for subject project:
Unclassified MH and ducts
- The planned location of the project will effect in place communication capabilities.
- There are areas were the communication cabling and conduit system passes under the roadway or near it, ensure no damage occurs to these and if at this time they are not concreted incase under the roadway then add concrete encasement to them.
- Drawing showing the MH and Duct system within the construction area can be provided as needed.
4. The above are all issues that must be considered during the programming/requirements identification of new MCPs and O&M renovation projects with the understanding that the 27 SOCS reserves the right to change or modify as mission dictates. Further coordination and in-depth communications engineering will be required as the project proceeds into the design phase.
Regards, 01/28/2015
X Gary E. Zoelzer
NAME, RANK, DAF
Project Manager Signed by: ZOELZER.GARY.E.1086139576
AIR COMMANDOS
FA4855-15-B-0009 Attachment 6
File details come from the government source that posted it. Updated .