Communications Call-Out

View the file

Other files for this federal contract opportunity

Other files attached to Repair Sections Around East Aderholt Loop, newest first.
File Type Posted
Drawings_Revised.pdf PDF
Specifications_Revised.pdf PDF
SF30_Amendment.doc DOC document
Cannon_Bid_Question_Response.pdf PDF
Attachment_5._OPSEC_Contract_Addendum.pdf PDF
Attachment_7._Environmental_Guide.pdf PDF
Attachment_2._Drawings.pdf PDF
Solicitation(IFB).doc DOC document
Attachment_8._Wage_Determination_NM50.pdf PDF
Attachment_3._Specifications.pdf PDF
Attachment_4.SOMS.pdf PDF
Attachment_1._Statement_of_Work.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

27TH SPECIAL OPERATIONS COMMUNICATIONS SQUADRON (AFSOC)

CANNON AIR FORCE BASE NEW MEXICO

MEMORANDUM FOR: AFSOC 27 SOCE 28 Jan 2015

FROM: 27SOCS/SCXP

SUBJECT: CZQZ131036 Aderholt

1. The requirements of the following reference documents will be used all communications work supporting this effort:

A. ETL 02-12, Unified Facilities criteria, B. UFC -3-580-01, C. AFSOCI 33-105, D. EIA/TIA Communication Standards, (most current standard date at time of contract award)

E. AFSSI 7703,

F. NEC standards, G. RUS standards, H. MIL-STD-188-124B, Ground and Bonding,

2. 27 SOCS provides the following local guidance for subject project:

Unclassified MH and ducts

- The planned location of the project will effect in place communication capabilities.

- There are areas were the communication cabling and conduit system passes under the roadway or near it, ensure no damage occurs to these and if at this time they are not concreted incase under the roadway then add concrete encasement to them.

- Drawing showing the MH and Duct system within the construction area can be provided as needed.

4. The above are all issues that must be considered during the programming/requirements identification of new MCPs and O&M renovation projects with the understanding that the 27 SOCS reserves the right to change or modify as mission dictates. Further coordination and in-depth communications engineering will be required as the project proceeds into the design phase.

Regards, 01/28/2015

X Gary E. Zoelzer

NAME, RANK, DAF

Project Manager Signed by: ZOELZER.GARY.E.1086139576

AIR COMMANDOS

FA4855-15-B-0009 Attachment 6