(Revised)_Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf
PDF 125 KB Posted
- Attached to
- Repair Base Recycle Center, Bldg. 6035 Federal contract opportunity
- Solicitation number
- FA481919RA022
About this file
Revised version of the additional questions and answers posted on 9-11-19. The answer to question #1 is corrected in this version.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA's_-_Base_Recycle_Center.xlsx | XLSX spreadsheet | |
| QA's_-_6000_Area.xlsx | XLSX spreadsheet | |
| Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf | ||
| B6035_Drawings.pdf | ||
| QA's_-_Base_Recycle_Center.xlsx | XLSX spreadsheet | |
| Site_Visit_Attendee_List.pdf | ||
| Attachment_02_Appendix_A_Scope_of_Work.pdf | ||
| Attachment_04_Wage_Determination_4_Jan_19.pdf | ||
| Solicitation_-_FA481919RA022.pdf | ||
| Attachment_01_SOW.pdf | ||
| Attachment_09_General_Financial_Information.pdf | ||
| Attachment_05_AF_Form_66.xls | XLS spreadsheet | |
| Attachment_07_AF_3064.pdf | ||
| Attachment_06_AF_Form_3000.pdf | ||
| Attachment_10_Insurance_Requirements.pdf | ||
| Attachment_03_Appendix_B_Photos.pdf | ||
| Attachment_08_AF3065.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/11/19
Additional Questions & Answers for FA481919RA022 – Repair Base Recycle Center, Bldg. 6035:
1 Is a QFPE required on this project?
Response: Yes, the certification of the fire protection system would require a Qualified Fire Protection Engineer but does not require a PE “QFPE”
2 Will a life safety analysis be required per UFC 3‐600‐01, Paragraph 1‐7.1?
Response: When reconstructing the office, breakroom and bathroom life safety analysis will be required.
3 Please provide a waterflow test per UFC 3‐600‐01, Paragraph 1.12.5.
Response: Not available
4 SOW Paragraph 3.6.5 lists fire alarm testing and certification, but no other fire alarm work is listed. Is any fire alarm repair or replacement anticipated?
Response: When reconstructing the office, breakroom and bathroom fire alarms and sprinklers will be required.
5 Is the purpose of the fire alarm testing to assess the condition of the fire alarm system?
Response: When reconstructing the office, breakroom and bathroom the fire alarm testing will be required.
6 SOW Paragraph 3.6 .4 lists the scope of work to be limited sprinkler head survey/replacement and deluge sprinkler system testing. Is the purpose of the deluge system testing to assess the condition of the fire sprinkler system?
Response: When reconstructing the roof, office, breakroom and bathroom the fire system testing and leak checks will be required.
7 It appears that there is more than 100sf of wall siding that needs to be replaced, can you clarify.
Response: It is the contractor’s responsibility to determine the panels that require replacement due to damage that affects the integrity of the building envelope. Minor defects will not be replaced. Bid the package with the required sf that requires replacement. We are not replacing the entire wall sections.