Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf

PDF 73 KB Posted

Attached to
Repair Base Recycle Center, Bldg. 6035 Federal contract opportunity
Solicitation number
FA481919RA022
Issued by
Department of the Air Force Air Combat Command

About this file

Additonal questions and answers

View the file

Other files for this federal contract opportunity

Other files attached to Repair Base Recycle Center, Bldg. 6035, newest first.
File Type Posted
QA's_-_Base_Recycle_Center.xlsx XLSX spreadsheet
QA's_-_6000_Area.xlsx XLSX spreadsheet
(Revised)_Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf PDF
B6035_Drawings.pdf PDF
QA's_-_Base_Recycle_Center.xlsx XLSX spreadsheet
Site_Visit_Attendee_List.pdf PDF
Attachment_02_Appendix_A_Scope_of_Work.pdf PDF
Attachment_03_Appendix_B_Photos.pdf PDF
Attachment_08_AF3065.pdf PDF
Attachment_04_Wage_Determination_4_Jan_19.pdf PDF
Solicitation_-_FA481919RA022.pdf PDF
Attachment_09_General_Financial_Information.pdf PDF
Attachment_05_AF_Form_66.xls XLS spreadsheet
Attachment_07_AF_3064.pdf PDF
Attachment_06_AF_Form_3000.pdf PDF
Attachment_10_Insurance_Requirements.pdf PDF
Attachment_01_SOW.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/11/19

Additional Questions & Answers for FA481919RA022 – Repair Base Recycle Center, Bldg. 6035:

1 Is a QFPE required on this project?

Response: QC’s are required to have a current CQM (Construction Quality Management) Certificate from either the Corps of Engineers or NAVFAC”. A PE is not a requirement.

2 Will a life safety analysis be required per UFC 3‐600‐01, Paragraph 1‐7.1?

Response: When reconstructing the office, breakroom and bathroom life safety analysis will be required.

3 Please provide a waterflow test per UFC 3‐600‐01, Paragraph 1.12.5.

Response: Not available

4 SOW Paragraph 3.6.5 lists fire alarm testing and certification, but no other fire alarm work is listed. Is any fire alarm repair or replacement anticipated?

Response: When reconstructing the office, breakroom and bathroom fire alarms and sprinklers will be required.

5 Is the purpose of the fire alarm testing to assess the condition of the fire alarm system?

Response: When reconstructing the office, breakroom and bathroom the fire alarm testing will be required.

6 SOW Paragraph 3.6 .4 lists the scope of work to be limited sprinkler head survey/replacement and deluge sprinkler system testing. Is the purpose of the deluge system testing to assess the condition of the fire sprinkler system?

Response: When reconstructing the roof, office, breakroom and bathroom the fire system testing and leak checks will be required.

7 It appears that there is more than 100sf of wall siding that needs to be replaced, can you clarify.

Response: It is the contractor’s responsibility to determine the panels that require replacement due to damage that affects the integrity of the building envelope. Minor defects will not be replaced. Bid the package with the required sf that requires replacement. We are not replacing the entire wall sections.