QA's_-_Base_Recycle_Center.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Repair Base Recycle Center, Bldg. 6035 Federal contract opportunity
- Solicitation number
- FA481919RA022
About this file
Questions and Answers 9-6-19
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA's_-_Base_Recycle_Center.xlsx | XLSX spreadsheet | |
| QA's_-_6000_Area.xlsx | XLSX spreadsheet | |
| (Revised)_Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf | ||
| Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf | ||
| B6035_Drawings.pdf | ||
| Site_Visit_Attendee_List.pdf | ||
| Attachment_02_Appendix_A_Scope_of_Work.pdf | ||
| Attachment_09_General_Financial_Information.pdf | ||
| Attachment_05_AF_Form_66.xls | XLS spreadsheet | |
| Attachment_07_AF_3064.pdf | ||
| Attachment_06_AF_Form_3000.pdf | ||
| Attachment_10_Insurance_Requirements.pdf | ||
| Attachment_03_Appendix_B_Photos.pdf | ||
| Attachment_08_AF3065.pdf | ||
| Attachment_04_Wage_Determination_4_Jan_19.pdf | ||
| Solicitation_-_FA481919RA022.pdf | ||
| Attachment_01_SOW.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPIF
| Pre Proposal Inquiry Form | Solicitation No: FA481919RA022 |
| Contracting Officer Name: Mrs. Melissa Sanders | Project Title: Repair Base Recycle Center |
| Contract Administrator Name: A1C Alyssa McSwain | Proposal Due Date: 9/19/19 |
| Review: 9/6/19 | |
| Email: 325CONS.Construction@us.af.mil |
| Question No. | Reference (Sect/Para/Page) | Question | |
| 1 | Site Visit Inquiry | Please provide the permitting agency and contact information for the project. | This information will be discussed at the Preconstruction conference prior to work beginning. |
| 2 | Site Visit Inquiry | Does the project duration of 280 days from NTP include the architect design phase? | The 280 days includes the design phase. |
| 3 | Site Visit Inquiry | What locations are available for construction generated garbage and debris dumping; is this on the base or must it be hauled off base? | Review Section 1.1 GENERAL REQUIREMENTS, Item P- Cleanup; 4.11.2.5 Hazardous Waste, Item P Covered Chutes; 5.9 GENERATED REFUSE. |
| 4 | Site Visit Inquiry | Will additional consideration be given to the General Contractor for project award if the proposed Architect is a Women-Owned Small Business (WOSB)? | No |
| 5 | Site Visit Inquiry | Often bids that are above the Simplified Acquisition Threshold and that require Performance and Payment bonds also required a bid bond. It appears this project does not require a bid bond. Please indicate if this is correct or if we should provide a bid bond? | No bid bonds required. |
| 6 | Site Visit Inquiry | What year was the original building designed and constructed? | 9/25/09 |
| 7 | Site Visit Inquiry | What was the applicable building code when the original building code was designed? | 2007 |
| 8 | Site Visit Inquiry | Will the occupancy of this building increase or change? | No |
| 9 | Site Visit Inquiry | Appendix A Scope of Work, Section 2.0 Summary of Work, par. 2.0 Architectural, 2.3 states ”Replace all doors on all sides of the building to comply with AT/FP requirements and in coordination with structural requirements. Will this facility have to comply with any other or all of UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings? | No |
| 10 | Site Visit Inquiry | Bullet item “K” list several exterior improvements such as parking lot improvements, pavement marking, sidewalks, entry way pavements, perimeter fencing etc. which are not found in the Appendix A Scope of work. Which Scope of work will take precedence or fully define the work required? | No, items with no scope are not included in this project. |
| 11 | Site Visit Inquiry | Please confirm it is the intent of the specifications to require the contractor to have a person onsite full time from the time Construction begins until the work is substantially complete. | Only when project contractor or sub-contractor is onsite or work is being performed for this project. |
&P of &N