QA's_-_Base_Recycle_Center.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Repair Base Recycle Center, Bldg. 6035 Federal contract opportunity
Solicitation number
FA481919RA022
Issued by
Department of the Air Force Air Combat Command

About this file

**Please disregard the Q&A document that was posted on 9-16-19 since it was the incorrect document**

View the file

Other files for this federal contract opportunity

Other files attached to Repair Base Recycle Center, Bldg. 6035, newest first.
File Type Posted
QA's_-_6000_Area.xlsx XLSX spreadsheet
(Revised)_Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf PDF
Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf PDF
B6035_Drawings.pdf PDF
QA's_-_Base_Recycle_Center.xlsx XLSX spreadsheet
Site_Visit_Attendee_List.pdf PDF
Attachment_02_Appendix_A_Scope_of_Work.pdf PDF
Attachment_04_Wage_Determination_4_Jan_19.pdf PDF
Solicitation_-_FA481919RA022.pdf PDF
Attachment_09_General_Financial_Information.pdf PDF
Attachment_05_AF_Form_66.xls XLS spreadsheet
Attachment_07_AF_3064.pdf PDF
Attachment_06_AF_Form_3000.pdf PDF
Attachment_10_Insurance_Requirements.pdf PDF
Attachment_01_SOW.pdf PDF
Attachment_03_Appendix_B_Photos.pdf PDF
Attachment_08_AF3065.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPIF

Pre Proposal Inquiry FormSolicitation No: FA481919RA022
Contracting Officer Name: Mrs. Melissa SandersProject Title: Repair Base Recycle Center
Contract Administrator Name: A1C Alyssa McSwainProposal Due Date: 9/19/19
Review: 9/6/19
Email: 325CONS.Construction@us.af.mil
Question No.Reference (Sect/Para/Page)Question
1Site Visit InquiryPlease provide the permitting agency and contact information for the project.This information will be discussed at the Preconstruction conference prior to work beginning.
2Site Visit InquiryDoes the project duration of 280 days from NTP include the architect design phase?The 280 days includes the design phase.
3Site Visit InquiryWhat locations are available for construction generated garbage and debris dumping; is this on the base or must it be hauled off base?Review Section 1.1 GENERAL REQUIREMENTS, Item P- Cleanup; 4.11.2.5 Hazardous Waste, Item P Covered Chutes; 5.9 GENERATED REFUSE.
4Site Visit InquiryWill additional consideration be given to the General Contractor for project award if the proposed Architect is a Women-Owned Small Business (WOSB)?No
5Site Visit InquiryOften bids that are above the Simplified Acquisition Threshold and that require Performance and Payment bonds also required a bid bond. It appears this project does not require a bid bond. Please indicate if this is correct or if we should provide a bid bond?No bid bonds required.
6Site Visit InquiryWhat year was the original building designed and constructed?9/25/09
7Site Visit InquiryWhat was the applicable building code when the original building code was designed?2007
8Site Visit InquiryWill the occupancy of this building increase or change?No
9Site Visit InquiryAppendix A Scope of Work, Section 2.0 Summary of Work, par. 2.0 Architectural, 2.3 states ”Replace all doors on all sides of the building to comply with AT/FP requirements and in coordination with structural requirements. Will this facility have to comply with any other or all of UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings?No
10Site Visit InquiryBullet item “K” list several exterior improvements such as parking lot improvements, pavement marking, sidewalks, entry way pavements, perimeter fencing etc. which are not found in the Appendix A Scope of work. Which Scope of work will take precedence or fully define the work required?No, items with no scope are not included in this project.
11Site Visit InquiryPlease confirm it is the intent of the specifications to require the contractor to have a person onsite full time from the time Construction begins until the work is substantially complete.Only when project contractor or sub-contractor is onsite or work is being performed for this project.
12Site Visit Inquiry"We are trying to gather information to bid out 3 12x12 roll up doors, our engineer needs information for the earthquake requirement, they need occupancy category, and site class. Could you please provide me with the information or point me in the right direction?"Contractor would need to determine earthquake requirements and state why they are not needed. Occupancy 3 to 5 persons periodically throughout the day. Site class information not available at this time.