Attachment_02_Appendix_A_Scope_of_Work.pdf

PDF 1 MB Posted

Attached to
Repair Base Recycle Center, Bldg. 6035 Federal contract opportunity
Solicitation number
FA481919RA022
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Repair Base Recycle Center, Bldg. 6035, newest first.
File Type Posted
QA's_-_Base_Recycle_Center.xlsx XLSX spreadsheet
QA's_-_6000_Area.xlsx XLSX spreadsheet
(Revised)_Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf PDF
Additional_Questions_&_Answers_-_Base_Recycle_Center.pdf PDF
B6035_Drawings.pdf PDF
QA's_-_Base_Recycle_Center.xlsx XLSX spreadsheet
Site_Visit_Attendee_List.pdf PDF
Attachment_09_General_Financial_Information.pdf PDF
Attachment_05_AF_Form_66.xls XLS spreadsheet
Attachment_07_AF_3064.pdf PDF
Attachment_06_AF_Form_3000.pdf PDF
Attachment_10_Insurance_Requirements.pdf PDF
Attachment_03_Appendix_B_Photos.pdf PDF
Attachment_08_AF3065.pdf PDF
Attachment_01_SOW.pdf PDF
Attachment_04_Wage_Determination_4_Jan_19.pdf PDF
Solicitation_-_FA481919RA022.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX - A

SCOPE OF WORK

For

REPAIR BASE RECYCLE CENTER

BLDG 6035

TYNDALL AFB FLORIDA

FOR PROJECT XLWU 19-8111

FA4819-19-R-A022

Tyndall AFB, FL

Attachment 02 Appendix A Scope of Work

Contents

1.0 SCOPE

2.0 SUMMARY OF WORK

2.1 TASK 1.0

3.0 POINTS OF CONTACT (POCS)

FA4819-19-R-A022

Tyndall AFB, FL

1.0 SCOPE

a. Purpose

a. The purpose of the Tyndall Air Force Base (TAFB) project XLWU 19-8111, Base Recycle Center, is to repair hurricane damage and to bring the building and its supporting facilities into full compliance with current building codes, including the DoD Building Code, and the portion of the Florida Building Code that contains the High Velocity Hurricane Zone (HVHZ) provisions. (TAFB will be treated as a Wind Zone 4 located site in accordance with UFC-3-301-01). This project delivery method is Design-Build (D-B). Work on supporting facilities includes external building fixtures, building utilities within the Points of Demarcation (POD) for privatized utilities, and work within the Administration / Office Building. The Contractor shall be responsible for providing all labor, equipment, tools, materials, and services necessary to complete the project within the allotted timeframe.

b. This project has an estimated period of performance from Notification to Proceed

(NTP) through completion and turnover of the facility back to the Government for mission operations of 280 calendar days.

b. Field Changes:

a. Field Changes: The Contractor and the Government may agree to perform a no cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated items. All field changes must be approved by the CO prior to execution. Only the CO may authorize field changes or deviations from the SOW.

2.0 Summary of Work

2.1 Task 1.0

A. Building 6035 See Appendix B for building details

1.0 Specific Work and Utilities No Work Required

2.0 Architectural

2.1 Clean, repair, caulk and replace portions of the exterior walls

2.1.1 Clean Exterior Walls ~ 5400 sf

2.1.2 Repair Exterior Walls 100 sf

2.1.3 Paint Exterior Surfaces as needed ~200 sf

2.2 Replace roof sections, ridge caps, soffit, fascia drip edge, gutter, downspouts with Hurricane Level 4 components

2.2.1 Install Sheet metal Hip Roof ~ 7000

2.2.2 Install roof ridge cap ~ 100 lf

2.2.3 Replace Soffit ~ 300 lf

2.2.4 Replace Fascia ~ 300 lf

2.2.5 Replace Gutter ~ 200

2.2.6 Replace drip edge and downspouts ~ 160 lf

2.2.7 Replace 12 X 12 awning over battery Rack

2.2.8 Ensure Roof and Building is grounded ~ 7000 sf

2.3 Replace all doors on all sides of the building to comply with

AT/FP requirements and in coordination with structural requirements

2.3.1 Incorporate (3) motorized rollup doors with hurricane

resistant level 4 installation - 12 X 12 Insulated

2.4 Windows - No Work Required - Not Included in this Project

2.5 Remove, mold remediate, replace, and insulate interior walls ~ 2600 sf

See building layout.

2.5.1 Office Walls

2.5.1.1 Build new office wall

2.5.1.2 Insulate walls with R13

2.5.1.3 Install 60” deadlight

2.5.1.4 Clean and Prep Walls

2.5.1.5 Paint Walls

FA4819-19-R-A022

Tyndall AFB, FL

2.5.2 Breakroom Walls

2.5.2.1 Build new breakroom walls

2.5.2.2 Insulate walls with R13

2.5.2.3 Clean and Prep Walls

2.5.2.4 Paint Walls

2.5.3 Bathroom Walls

2.5.3.1 Build new bathroom walls

2.5.3.2 Insulate walls with R13

2.5.3.3 Clean and Prep Walls

2.5.3.4 Paint Walls

2.5.4 Mechanical Room Walls

2.5.4.1 Build new mechanical room walls

2.5.4.2 Insulate walls with R13

2.5.4.3 Clean and Prep Walls

2.5.4.4 Paint Walls

2.5.5 Remove, mold remediate, replace, and insulate ceilings ~1150 sf

2.5.5.1 Office Ceiling

2.5.5.1.1 Install insulated Acoustic Ceiling

2.5.5.1.2 Install R19 insulation

2.5.5.2 Breakroom Ceiling

2.5.5.2.1 Install insulated Acoustic Ceiling

2.5.5.2.2 Install R19 insulation

2.5.5.3 Bathroom Ceiling

2.5.5.3.1 Install R19 insulation

2.5.5.3.2 Install Exhaust fan

2.5.5.3.3 Clean and Prep Ceiling

2.5.5.3.4 Paint Ceiling

2.5.5.4 Mechanical Room Ceiling

2.5.5.4.1 Install R19 insulation

2.5.5.4.2 Clean and Prep Ceiling

2.5.5.4.3 Paint Ceiling

FA4819-19-R-A022

Tyndall AFB, FL

2.5.6 Remove, replace, install fixtures with low-flow fixtures and hardware

2.5.6.1 Provide ADA Complaint breakroom fixtures

2.5.6.1.1 Install Kitchen 10 feet Wood Cabinets

2.5.6.1.2 Install Hardware

2.5.6.1.3 Install ADA compliant electric water coolers and provide with bottle filler

2.5.6.2 Provide ADA compliant bathroom fixtures

2.5.6.2.1 Install Shower

2.5.6.2.2 Install Commode

2.5.6.2.3 Install Vanity

2.5.6.2.4 Install Sink

2.5.6.2.5 Install hardware

2.5.6.2.6 Install Wall Heater and Fan

2.5.6.3 Provide an electric Shop Heater

3.0 Electrical

3.1 Lighting

3.1.1 Replace all wall-mounted exterior lights with LED lighting with color and style match to existing roof.

3.1.2 Replace interior damaged Fluorescent Light with standard LEDs and battery backup for life safety. See Lighting drawing

3.2 Replace defective Outlets (20)

3.2.1.1 Replace defective duplex outlets and protective covers

3.2.1.2 Replace defective 110V duplex outlets

3.2.1.3 Replace defective GFCI 110V duplex outlets

3.2.1.4 Replace defective 220V outlets

3.3 Install Conduits as needed

3.4 Communication (2)

3.4.1 Repair and replace small communications antenna

3.4.2 Repair any damaged communication lines in ceiling

3.4.3 Test communications

3.5 Clean, replace, building HVAC ducting and system ~ 4 ton~ 1140 sf

3.5.1 Certification of HVAC and AHU, and Test/Balance

3.6 Fire Protection System ~ 7000 sf

3.6.1 (Cx) Technician

3.6.2 Check system for damaged sprinkler heads office, breakroom, bathroom, mechanical room, and shop (40)

3.6.3 Install new quick response 155 F heads to match VK300

heads (Chrome and brass) (20)

3.6.4 Deluge System Testing And Certification

3.6.5 Fire Alarm testing And Certification

3.0 POINTS OF CONTACT (POCs)

A. POCs will be coordinated through the CO.

B. Contracting Officer Authority:

a. CO, the term used herein, does not include any representative not acting within the scope of his/her authority. Notwithstanding any of the provisions of this contract, the CO shall be the only individual authorized to in any way amend or modify the terms of this contract.

C. Project Manager (PM):

a. The PM (TBD).

D. User Contact

a. (TBD)

E. Building Contact

a. (TBD)

END OF DOCUMENT