Solicitation_Questions_and_Answers.pdf
PDF 24 KB Posted
- Attached to
- PDS Replacement (Fiber Cabling) Federal contract opportunity
- Solicitation number
- FA481419TF066
About this file
List of Questions with Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_5.pdf | ||
| Site_Visit_Questions_4_8_19_CENTCOM_SOCOM.pdf | ||
| Site_Visit_Questions_and_Answers_4_8_19_CENTCOM_SOCOM.pdf | ||
| Amendment_4.pdf | ||
| Amendment__3.pdf | ||
| Additional_Questions_and_Answers.pdf | ||
| Amendment.pdf | ||
| Attachment_2,_SOW.pdf | ||
| Attachment_3,_Clauses.pdf | ||
| RFQ.pdf | ||
| Attachment_1,_CLIN_Structure.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PDS Replacement Solicitation Questions
1. Would it be possible to provide the schematics/drawings for the PDS Replacement (Fiber Cabling)? Working on providing this.
2. Requesting a Site visit and what is the number of people a vendor is permitted to attend this site visit (1, 2, or 3)? 4 per CENTCOM green badge. I not sure of SOCOM’s requirements.
3. Are there any drawings or sketches that are prepared for this solicitation? NO
4. Is there a walk through or pre-bid meeting scheduled at this time? If there is not one scheduled, can we set a time to walk the pathways with an escort prior to bid? April 8th 2019 at 10:00AM.
5. I do not see a DOL Wage Determination, Can you advise if there are any Davis Bacon Wages or other Certified Payroll Reporting requirements on this project? Not applicable.
6. Typically for this type of installation on MacDill there is a requirement for 3” 3-Cell Fabric Inner duct to be installed with the Fiber. Can you advise if there is any requirement for this? No other requirement. (2) 3”-3 MAXCELL required end to end.
7. Is the Pathway functional and verified? Are we to assume that no conduit work is needed for this installation? Path is functional. Should not need any conduit added for work.
8. Is there a specific standard/specification governing the type of fiber cable to be used: armored, plenum, etc? Outdoor rated. Plenum
9. Can we have the distance and route between?
Bldg. 578 to SOCOM MacDill AFB, Florida 33621 CENTCOM to SOCOM MacDill AFB, Florida 33621When I had the company come out to do the quote they had measured out the distance to and from locations.
10. Can we get the distance from the Rack and the embark location in the room?
Or to the room it will need to be pulled to? CENTCOM room S215 (Unclassified, Secret, Coalition) S211 (TS). ALL pulls will have NO splices.
11. Will you want Fiber pulled to each room in buildings from the MDF? It’s going building to building (CENTCOM to SOCOM and Building 578 to SOCOM). CENTCOM Building 570 room S215 SI-1/ room SSI-211 and then Building 578 is just 1 room.
12. The PDS system is intact, checked for breaks and has room to pull Fiber thru? The PDS is intact but not sure of breaks. I would imagine it is ok being the fiber has never been damaged by construction.
13. Is there pull tape currently in the PDS duct now? Assume there is none.
14. Who installed the PDS? This PDS has been in place for years. Not sure who the installer was.
15. I would like to know what the magnitude of this project is and what's the period of performance?
To upgrade fiber as the existing fiber is many years old.
16. SOW 3.2 Scope of Services states to install (1) 48 strand multimode OM3 fiber from Bldg. 578 to
SOCOM. Services Requirements 3.2.2 states to install a hybrid (1) 48 strand multimode OM3 and 48 strand single mode fiber. Which is correct? 3.2.2