Amendment 0003 dtd 23 Jul 10.rtf

RTF text file 274 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA480910R0004
Issued by

About this file

Amendment 0003 dated 23 Jul 10

Text of this file

file_0.wmf file_1.wmf

FA4809-10-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to incorporate changes to subject solicitation as shown below:

A. Delete Attachment 4, entitled, "Past Performance Questionnaire, FA4809-10-R-0001", 7 pages, and incorporate the attached revised Attachment 4, entitled "Past Performance Questionnaire, FA4809-10-R-0004," 7 pages.

B. At Attachment 5, Sample Project, delete Statement of Work For Repair Bldg. 3803 (VAQ), Project # VKAG 96-1105, 2 pages, page 4 of 6 and 5 of 6, dated 16 Jul 10, and incorporate the attached revised Statement of Work For Repair Bldg. 3803 (VAQ) Project # VKAG 96-1105, 2 pages, page 4 of 6 and 5 of 6, Dated 23Jul 10.

C. Reference Section B = Supplies or Services and Prices, NOTE 4: Revise to read as follows:

NOTE 4: Offeror's attention is invited to SF1442, Block 10, item 5. The maximum contract value/program value is the MAXIMUM value of the MACC ($45,000,000.00), not the value of each resultant contract awarded. (There is no stated maximum value for each contract awarded at this time). See Note 5 below. Each resultant awarded contract will have a first task order award in the guaranteed minimum amount of $2,000.00), which will be applied to a project later in the task order process of any future projects."

D. The following is added to Section B - Supplies or Services and Prices, as NOTE 5:

"NOTE 5: A Maximum value will be established for each resultant contract awarded against the Multiple Award Construction Contract (MACC) at the time of contract(s) award, which will be dependent on the number of contracts awarded. The value of all contracts awarded shall not exceed the MACC maximum contract value/program value of $45,000,000.00."

E. SF1442, Block 13A. The time and date for receipt of proposals is changed to 4:00 PM/27 Aug 2010.

F. All other terms and conditions remain unchanged.

(End of Summary of Changes)

FA4809-10-R-0004
Attachment 5

Revised Statement of Work For

REPAIR BLDG. 3803 (VAQ)

Project # VKAG 96-1105

23 Jul 10 The contractor shall prepare a proposal to renovate Bldg. 3803 (VAQ). The building houses visiting airmen (billeting) to Seymour Johnson AFB. Specific requirements are as follows:

1. Repair VAQ, General

a.Design shall be in accordance with the AFSDG 4-724-01, Design: Visiting Quarters, the Seymour Johnson AFB Architectural Standards, Unified Facilities Criteria (UFC), National Fire Protection Association (NFPA) regulations, North Carolina Building Code, as well as those required elsewhere this document and in the MACC general requirements.
b.Final facility interior square footage shall be as required by the regulations, requirements and standards and total identified funds.

2. General requirements Demolish existing floor plan as required to create new floor plan IAW AFSDG 4-724-01, Design: Visiting Quarters (Satellite). Currently, the room layout has two guest rooms sharing one bathroom. There are six single rooms as well. All rooms must comply with the private bathroom guidance, ADA guidance and space requirements as well incorporating the support functions. All areas listed in AFSDG 4-724-01, Table 2-1, are not required. Areas currently in the existing facility are the only areas required: Guest Rooms, Mechanical Rooms, Storage Rooms, Laundry Rooms, Janitor Rooms, and Lounge Areas.

Replace all exterior windows. Replacements shall be IAW UFC 04-010-01, DoD Minimum Antiterrorism Standards for Buildings. Ensure existing structure meets requirements and modify as required.

Add a brick masonry veneer to the exterior of the existing facility and tie existingstanding seam roof system into it as required.
Replace the entire HVAC system, entire electrical system (include all conduit,wiring, light fixtures, etc), entire plumbing system (include all fixtures,enclosures, etc), all doors/ frames/ hardware, and all ceiling/wall/floor finishes.

Pg 4 of 6 Revised, Amendment 0003 Dated 23 Jul 10

FA4809-10-R-0004
Attachment 5

Interior and Exterior lighting shall be per UFC 3-530-01.

Install power outlets throughout facility.

Design temps shall be 68 (winter) and 75 (summer) degrees.
Ventilation per ASHRAE Standard 62
Heating calculations to include losses due to conduction2
, infiltration, and internalloads.
Facility (first floor only) shall be in compliance with ADA requirements.
Existing roof is standing seam metal and new exterior shall tie in properly.
Install a new fire protection / detection system per UFC and NFPA. Suppressionsystem is required.
Add a new mass notification system, new interior signage, and new remoteelectric meters.
Fire alarm panel to be located in mechanical room (utilize Monaco M-2 system orcompatible)
Install cable TV and Comm (Telephone and Data) outlets throughout facility. Thisincludes backboard with ground and power, conduit (with pull strings), boxes andblank plastic plates. Contractor shall contract with Time Warner Cable for all cable
TVwiring and pay any associated costs to provide a complete functional system.

Base Communications will wire all Comm (Telephone and Data).

New electrical panels shall be 3 phase, 280V/120V, 42 circuit. The panels shall be fedfrom a new 3 phase transformer (if existing does not have adequate capacity) sited bythe Contractor and minimum of 25’ from the facility.
Install valves at water service connections to mains.

3. Support Information:

Existing sanitary sewer (SS) is 6” and is assumed adequate.

Existing water main (W) is 8" diameter with 4” and 2” services to building.

c. NATURAL gas is in the area.

Pg 5 of 6

Revised, Amendment 0003
Dated 23 Jul 10

Other files

File Type Posted
NOTICE.docx DOCX document
FA4809-10-R-0004 SJAFB NC Atch 5 Atch 2 Blank 3052.xls XLS spreadsheet
Questions and answers 21 Oct 10.docx DOCX document
G-1 COVERSHEET.dwt —
Bldg 3803 1st Floor.ppt PPT presentation
Survey.dwt —
Telecommunications.dwt —
3803rooff.dwg DWG drawing
Tsaec.mln —
A2.DWG DWG drawing
A1.DWG DWG drawing
E3PLAN.DWG DWG drawing
2NDFLOOR.DWG DWG drawing
934002prop2.dwg DWG drawing
Drawer4_20100716_0004.PDF PDF
Drawer4_20100716_0012.PDF PDF
Drawer4_20100716_0017.PDF PDF
Drawer4_20100716_0018.PDF PDF
Drawer4_20100716_0027.PDF PDF
Drawer4_20100716_0001.PDF PDF
Drawer4_20100716_0010.PDF PDF
Drawer4_20100716_0028.PDF PDF
934002demo2.dwg DWG drawing
Drawer4_20100716_0007.PDF PDF
Atch 5.1 pg 10 25-06-02_11.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 2.7 Wage Det - NC100009 —
Atch 5.1 pg 26 VKAG 84-1076 D-1.pdf PDF
Atch 5.1 pg 43 VKAG 84-1076 E-8.pdf PDF
Atch 5.1 pg 68 VKAG 86-1006 T-1.pdf PDF
Atch 5.1 pg 84 VKAG 96-1104 A-3.PDF PDF
Atch 5.1 pg 32 VKAG 84-1076 E-1.pdf PDF
Atch 5.1 pg 28 VKAG 84-1076 D-4.pdf PDF
Atch 5.1 pg 62 VKAG 86-1006 E-1.pdf PDF
Atch 5.1 pg 34 VKAG 84-1076 E-2.pdf PDF
Atch 5.1 pg 64 VKAG 86-1006 E-3.pdf PDF
Atch 5.1 pg 51 VKAG 84-1076 P-5.pdf PDF
FA4809-10-R-0004 SJAFB NC Appendix F - AF Form 66.xls XLS spreadsheet
FA4809-10-R-0004 SJAFB NC Atch 5.1 pg 2 25-06-02_3.pdf PDF
Atch 5.1 pg 36 VKAG 84-1076 E-3.pdf PDF
Atch 5.1 pg 61 VKAG 86-1006 A-6.pdf PDF
Atch 5.1 pg 7 25-06-02_8.pdf PDF
Atch 5.1 pg 75 VKAG 93-4002 E-4.pdf PDF
Atch 5.1 pg 87 VKAG 96-1104 A-5 AS-BUILT.PDF PDF
Atch 5.1 pg 90 VKAG 96-1104 COVER.PDF PDF
Atch 5.1 pg 78 VKAG 94-4001 C-1.pdf PDF
Atch 5.1 pg 41 VKAG 84-1076 E-6R.pdf PDF
Atch 5.1 pg 63 VKAG 86-1006 E-2.pdf PDF
Atch 5.1 pg 93 25-06-02_14.pdf PDF
Atch 5.1 pg 85 VKAG 96-1104 A-4.PDF PDF
FA4809-10-R-0004 SJAFB NC Atch 3 - Determination of Contractor Responsibility.doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .