FA480319RA011

Statement of Work

Attachment 1

VLSB 19-0018

STATEMENT OF WORK

FOR

Install Natural Gas Line at B1955

PROJECT: VLSB 19-0018 28 Aug 2019

The contractor shall provide all management, tools, supplies, equipment, labor, and applicable licenses and permits necessary to ensure that any demolition, utility cut and capping, and debris removal service is performed at Shaw AFB, South Carolina in a manner that will restore a neat and professional appearance of base areas. All work shall be done in strict accordance with this Statement of Work and subject to the terms and conditions of the contract and in accordance with (UFC) Unified Facilities Criteria, Unified Facilities Guide Specifications (UFGS), the International Building Code (IBC), International plumbing code (IPC), South Carolina Department of Health and Environmental Control (SCDHEC), National Electrical Code (NEC), National Electrical Safety Code (NESC), National Fire Protection Association (NFPA), EPA 402-K-01-001 (2008), South Carolina Department of Transportation (SCDOT), South Carolina Department of Health and Environmental Control (SCDHEC) Shaw Air Force Base Design and Construction Standards, Change 2, 21 Aug 2018 and all other applicable codes.

PERMITS

The contractor shall pay for and obtain any required permits. The contractor shall act in accordance with this Statement of Work, SCDHEC, Federal, and Shaw AFB guidelines.

WORKING CONDITIONS

The Contractor shall take all precautions to insure that his operations are conducted in a manner as to minimally interfere with the normal operations of the base and the safety and convenience of the base personnel. The contractor shall coordinate utility outages with the Civil Engineering Squadron (CE) and the user. The contractor shall provide written notice a minimum of 10 days prior to outages to CE and the user. Normal working hours shall be 0730-1630 Monday through Friday excluding Federal Holidays.

GENERAL PROJECT NOTES

Contractor is responsible for verifying all dimensions, quantities and square footages.

All dimensions, quantities and square footages included are approximations.

Construction and demolition shall be in strict accordance with the Shaw Air Force Base Design and Construction Standards. The information provided in this SOW, the provided drawings, and the requirements of the Shaw Air Force Base Design and Construction Standards shall be determined to be the minimum standards required in this project.

FA4803RA011

Attachment 1

VLSB 19-0018

UFC’s take precedence over all standards, codes and Shaw AFB Design Standards and requirements that pertain to the work within this SOW.

During construction, the contractor shall take care not to damage existing structures, etc. that will not be replaced as part of this contract. Contractor shall be responsible for the temporary support of all devices as required to perform work. Any demolition work that needs to be accomplished to complete the contract is the responsibility of the contractor. All material shall be installed per manufacturers’ recommendations. All items listed in the SOW are to be supplied and installed by the contractor unless otherwise noted.

A pre-construction meeting will be held at Shaw AFB to include the Contractor and Government representatives. The Government shall set up this meeting, to be held on Shaw AFB, with the Contractor and Government representatives, to discuss all remodel requirements, as well as any other construction issues the Contractor may have. All finishes shall be presented to the project inspector as one submittal for selection and approval prior to installation. All material that could be discontinued shall be on site, i.e. carpet and tile prior to starting project so there will be no difference in color.

WORK TO BE COMPLETED:

Furnish and install plastic gas pipe to connect from the existing gas main to B1955.

• Provide approximately 860’ of 4” gas pipe along the roadway and approximately

215’ of 2” gas pipe to the building.

• Cap 4” pipe for future use.

• Provide and install a smart meter and regulator

• Tie-in government furnished tankless water heaters

The area around the facility contains geothermal wells. The install shall be bored to avoid disturbing of the wells.

GENERAL DESIGN AND CONSTRUCTION NOTES

1. Any references to State Government, Federal Government, or Industry standards or specifications made herein shall form a part of this specification to the extent referenced thereto and all materials and workmanship under this contract shall comply with or exceed these standards and references. All referenced standards shall be the latest edition.

2. All manufactured equipment and products shall be new materials in good condition and installed as per manufacturer's latest printed instructions, unless specified otherwise herein.

FA4803RA011

Attachment 1

VLSB 19-0018

3. The Contractor is responsible for protection of existing facilities equipment from damage during installation and testing operations.

4. The contractor shall include make, model number and inherent operational characteristics all of major equipment supplied for the facility.

5. The facility/ area shall be cleaned in its entirety, including exterior areas, before being returned the government.

6. All Contractors shall be responsible for submitting a completed DD1354 (AUG 2013 edition, PDF file) with each progress payment request (beginning at 50% construction completion). This form shall be marked "Draft" until the Contractor has reached approximately 90% completion, or when it has been determined that funding will not be adjusted due to modifications. The Contractor shall have a reviewed and accepted DD1354 submitted to the Government Inspector two (2) weeks prior to the scheduled final inspection date (i.e. Placed In Service Date). This reviewed and accepted DD1354 shall be marked "Interim" until the final inspection occurs.

7. Contractor shall provide a schedule of values with the AF Form 3064, progress schedule.

WARRANTY

Contractor shall furnish a minimum one year warranty against defects in material and workmanship.

DEBRIS HAULING AND DISPOSAL

Contractor shall use an approved hauling route to prevent interference with base operations. In order to prevent problems with traffic, noise, wear and tear on roads, or other problems having the potential to adversely affect health, safety, or the environment, the government reserves the right to regulate routes, intervals, delivery points, and times for hauling.

All debris hauled by the contractor shall be enclosed to prevent leaking, spilling, or blowing. The Contractor shall ensure all debris or dirt is promptly removed from any transportation route if such debris is spilled, blown, or leaked from hauling equipment and vehicles. The contractor shall remove all dirt and mud caused by tracks of hauling equipment within one hour of notification by the Government. All demolition debris collected by the contractor shall be housed dumpsters and covered at all times and disposed of in an authorized landfill or transfer station. No disposal or burning is allowed on base. The contractor shall provide the government inspector with an electronic copy of each dump receipt on the following work day by 0800 with the daily report. (Electronically)

PROJECT: VLSB 19-0018 28 Aug 2019