Attachment_3_B1955_Utilities_VLSB_19-0018.pdf

PDF 1 MB Posted

Attached to
B1955 Instal Natural Gas Line Federal contract opportunity
Solicitation number
FA480319RA011
Issued by
Department of the Air Force Air Combat Command

About this file

Utility Map

View the file

Other files for this federal contract opportunity

Other files attached to B1955 Instal Natural Gas Line, newest first.
File Type Posted
Solicitation_-_FA480319RA011.pdf PDF
Attachment_2_Bid_Schedule_VLSB_19-0018.pdf PDF
Attachment_4_Consolidated_SC_Wage_Determinations_2019.pdf PDF
Attachment_1_SOW_VLSB_19-0018_Install_Natural_Gas_line_B1955.pdf PDF
Attachment_6_CONTRACTOR__EAL_Base_Pass_Request.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Losano Rd.

Gabreski Rd.

Dig Permit Map Common Installation Picture

Shaw Air Force Base Department of the Air Force

Air Combat Command GeoBase

Coordinate System: WGS 1984 UTM Zone 17N This map is for reference only. Although every effort has been made to ensure the accuracy of information, errors and conditions originating from physical sources used to develop the database may be reflected on this map. GeoBase shall not be liable for any errors, omissions, or damages that result from inappropriate use of this document.

This material is For Official Use Only. Unauthorized reproduction, distribution, publication, or exhibition of this material is STRICTLY PROHIBITED. Destroy as "For Official Use Only".

Printed Date: 8/29/2019

0 15075 Feet µ

Legend Cutting Plane

#0 Water Valve ¬ Fire Hydrant X Water Fitting Point I Water Meter = Water Pump "¬! Water Pump Station " Water Well R Yard Hydrant

Ø Water Treatment !O Thermal Well

Chiller Storm Inlet Storm Manhole

$1 Sewer Clean Out !UQ Sewer Valve !@ Grease Trap/Grit Chamber

! Sewer Manhole L Oil Water Separator = Sewer Pump k Sewer Meter gV Sewer Fitting ä Lift Station p Septic Tank dª Fuel Anode Point a Comm BET ÆM Callbox ÈN Emergency Callbox $1 Comm Handhole ! Comm Manhole / Comm Pedestal 3 Comm Splice XY Comm Vault

@A Monitoring Well @? Extraction Well &< Injection Well &( Well In-service &; Well Abandoned &/ Well Buried !( Gas Valve XY Gas Fitting

%ñ Gas Meter q Regulator Reducer

Fuel Valve I8 Fuel Pump I8 Fuel Pump Station Þ Fuel Filter Strainer !!2 Hand Hole; Manhole

Sectionalizing Cabinet

Ë Ê Airfield Lighting A Exterior Lighting

Gas-in-Service Gas Abandoned

#V Electrical Generator "CN Electrical Meter Ó Electrical Substation J° Electrical Switch

Electrical Transformer d Utility Pole

Voltage Regulator Electrical Surface Structure Water In-service Water abandoned/removed GeoThermal Line Storm In-service Storm Abandoned Sewer In-service

Sewer Abandoned Comm In-service Comm Abandoned Gas In-service Gas Abandoned POL In-service POL Abandoned Overhead

Abandoned Underground Abandoned QD Arc FutureProjects

FA480319RA011

Attachment 3