Aircraft_Sunshades__Maint_Bid_Schedule_-20_Aug_18.pdf
PDF 111 KB Posted
- Attached to
- Fabric Sunshades Maintenance
- Solicitation number
- FA480018Q0008
About this file
Bid Schedule
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT
LINE ITEM NO.
(CLIN) SUPPLIES/SERVICE
Base Qty
Option
QTY UNIT UNIT PRICE ($)
BASE
PERIOD OPTION YEAR 1 OPTION YEAR 2 OPTION YEAR 3 OPTION YEAR 4
TOTALS
LANGLEY CLINS 0001-0003
See Notes 1 & 2
Semi-annual INspection/Maintenance (Structures) The Contractor shall provide Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Aircraft Sunshade Inspection and Maintenance Services at Langley Air Force Base in accordance with the PWS.
2 2 EA
See Notes 1
& 2
Quarterly Inspection/Maintenace (Solar Arrays) The Contractor shall provide Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Aircraft Sunshade Inspection and Maintenance Services at Langley Air Force Base in accordance with the PWS.
2 2 EA
See Note 3
Maintenance Repairs (Parts & Labor (NTE) All parts and materials shall be of Original Equipment Manufacturer (OEM) replacement parts or equal, recommended by the manufacturer. All parts shall be U.L.
(Underwriters Laboratories) approved/Listed.
Only new standard parts shall be used in completed repairs. All replaced parts obtained by the contractor shall be invoiced at contractor’s cost. Additional cost/mark-up on materials of work performed by sub-contractor will not be accepted. If applicable, contractors will abide by any existing active mechanical warranties.
Contractor shall respond to service calls, perform periodic inspections, and be responsible for repair and replacement of all worn or failed components, installed additional systems parts, including those parts which have reached their life expectancy and prone to fail. Replacement parts shall be fully compatible with existing systems.
1 1 LO
NTE -TBD
NOTE 2 ‐ List the profit, overhead, G&A rates used in your quote on the bid schedule.
**Please fill in columns for Unit Price and Unit Price Increase for each year.
TOTAL CLINs 0001 through 0003:
NOTE 1 ‐ Instructions to Offeror: PRICE AND TOTAL only CLIN 1 ‐ . DO NOT PRICE CLINS 3. CLIN 3 ‐ is NTE and this price will be inserted at time of award.
File details come from the government source that posted it.