ROOF IDIQ Bid Shedule.xls

XLS spreadsheet 151 KB Posted

Attached to
Roofing Systems IDIQ Federal contract opportunity
Solicitation number
FA4690-11-B-0101
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 28 Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Systems IDIQ, newest first.
File Type Posted
Amend 1 SF 30.pdf PDF
Amend 1 Pre-Proposal Conference.pdf PDF
13. SECTION 07 22 00.rtf RTF text file
10. SECTION 06 10 00.rtf RTF text file
1. Building WD Meade.doc DOC document
23. SECTION 22 00 00.rtf RTF text file
24. Section 01000 General Requirements(2).rtf RTF text file
7. SECTION 01 33 00.rtf RTF text file
11. SECTION 07 19 00.rtf RTF text file
27. ROOF IDIQ CLINS.xls XLS spreadsheet
12. SECTION 07 21 16.rtf RTF text file
21. SECTION 07 92 00.rtf RTF text file
9. SECTION 05 50 13.rtf RTF text file
8. SECTION 02 41 00.rtf RTF text file
5. Pennington WD Residentual.doc DOC document
16. SECTION 07 51 13.rtf RTF text file
26. SECTION 01800 - Enviromental.rtf RTF text file
22. SECTION 09 90 00.rtf RTF text file
28. ROOF IDIQ Bid Shedule.xls XLS spreadsheet
FB4690-11-B-0101 Roofing Solicitation.pdf PDF
20. SECTION 07 61 14.rtf RTF text file
25. Section 01020 - Ellsworth AFB.rtf RTF text file
14. SECTION 07 31 13.rtf RTF text file
4. Pennington Heavy HWY WD.rtf RTF text file
17. SECTION 07 53 23.rtf RTF text file
19. SECTION 07 60 00.rtf RTF text file
6. SECTION 00 TABLE OF CONTENTS.docx DOCX document
2. Building WD Pennington.doc DOC document
18. SECTION 07 54 19.rtf RTF text file
15. SECTION 07 42 13.rtf RTF text file
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOF WO BUILDER MULTI

$1.00$2.00$3.00$4.00
BASE YEAR GOVT EST: 2010-2014 ROOF IDIQ CONTRACT
CLINDESCRIPTIONUNIT OF ISSUEUNIT COSTESTIMATED QUANTITYEXTENDED COSTUNIT COST
ASPHALT SHINGLES
0000AARemove and replace individual shingles; match existingSF$3.50500$1,750.00$3.64$3.79$3.94$4.09
0000ABRemove shingles, edge metal and underlayment for reroof; one or two layersSF$0.608,000$4,800.00$0.62$0.65$0.67$0.70
0000ACInstall edge metal for reroofLF$1.20600$720.00$1.25$1.30$1.35$1.40
0000ADInstall laminated architectural shingles; Class A, 290 lb/sq;SF$1.608,000$12,800.00$1.66$1.73$1.80$1.87
WOOD
0000BARemove and replace deteriorated wood decking, isolated areas, 1" max thicknessSF$3.10320$992.00$3.22$3.35$3.49$3.63
0000BBInstall 7/16" OSB sheathingSF$1.706,000$10,200.00$1.77$1.84$1.91$1.99
0000BCInstall 19/32" OSB sheathingSF$2.004,000$8,000.00$2.08$2.16$2.25$2.34
0000BDInstall 19/32" OSB backing for single-ply membraneSF$2.602,000$5,200.00$2.70$2.81$2.92$3.04
0000BERemove existing wood framing, curbing, blocking and nailersBF$0.903,000$2,700.00$0.94$0.97$1.01$1.05
0000BFInstall treated wood cants, curbing, blocking and nailersBF$3.005,000$15,000.00$3.12$3.24$3.37$3.51
0000BGInstall wood framingBF$3.401,000$3,400.00$3.54$3.68$3.82$3.98
0000BHInstall prefabricated wood trusses; 4/12 max pitchSF$4.006,000$24,000.00$4.16$4.33$4.50$4.68
0000BIRemove existing wood trim & fascia boardSF$1.251,000$1,250.00$1.30$1.35$1.41$1.46
0000BJInstall painted wood trim and fascia boardBF$4.00500$2,000.00$4.16$4.33$4.50$4.68
ROOF INSULATION
0000CARemove existing insulationBF$0.5020,000$10,000.00$0.52$0.54$0.56$0.58
0000CBInstall tapered polyisocyanurate insulationBF$2.005,000$10,000.00$2.08$2.16$2.25$2.34
0000CCInstall coverboard for PVC or EPDM recoverSF$1.004,000$4,000.00$1.04$1.08$1.12$1.17
0000CDInstall 1" perlite insulationSF$0.952,000$1,900.00$0.99$1.03$1.07$1.11
0000CEInstall 3" polyisocyanurate insulationSF$2.0010,000$20,000.00$2.08$2.16$2.25$2.34
0000CFInstall 4" polyisocyanurate insulationSF$2.5016,000$40,000.00$2.60$2.70$2.81$2.92
0000CGInstall 1-1/2" fiberglass batt insulation, unfacedSF$0.608,000$4,800.00$0.62$0.65$0.67$0.70
0000CHInstall R19 fiberglass batt insulation, unfacedSF$1.30500$650.00$1.35$1.41$1.46$1.52
0000CIInstall R38 fiberglass batt insulation, unfacedSF$1.902,000$3,800.00$1.98$2.06$2.14$2.22
0000CJInstall 6 mil polyethelene vapor barrierSF$0.308,000$2,400.00$0.31$0.32$0.34$0.35
METAL ROOFING SYSTEMS
0000DARemove existing metal roof or wall panels and flashingsSF$1.20200$240.00$1.25$1.30$1.35$1.40
0000DBReattach existing loose metal roof or wall panels and flashingsSF$1.301,000$1,300.00$1.35$1.41$1.46$1.52
0000DCInstall corrugated aluminum roof or wall panels, field paintedSF$7.50100$750.00$7.80$8.11$8.44$8.77
0000DDInstall corrugated steel roof or wall panels, field paintedSF$7.00100$700.00$7.28$7.57$7.87$8.19
0000DEInstall struct. SSMR system over purlins (not incl. insulation, flashings, closures, gutters and curbs): 20 yr warr.SF$8.004,000$32,000.00$8.32$8.65$9.00$9.36
0000DFInstall arch. SSMR system over substrate (not incl. insulation, flashings, closures, gutters and curbs): 20 yr warr.SF$7.508,000$60,000.00$7.80$8.11$8.44$8.77
0000DGInstall light-gage steel supports for structural SSMR system incl. purlins, subpurlins, rafters, columns, braces and fastenersLB$6.002,000$12,000.00$6.24$6.49$6.75$7.02
0000DHInstall SSMR system flashing for rake, eave, sidewall or headwall incl. fasteners, closures, sealants, and counterflashingLF$6.00400$2,400.00$6.24$6.49$6.75$7.02
0000DIInstall SSMR system flashing for ridge, hip or valley including all fasteners, closures, sealants, and counterflashingLF$8.00600$4,800.00$8.32$8.65$9.00$9.36
0000DJInstall SSMR system snow retention system, S-5 Color Guard w/snow clips, or equalLF$14.00400$5,600.00$14.56$15.14$15.75$16.38
BUILT-UP ROOFING SYSTEM (BURS)
0000EASpud and remove existing gravel for recoverSF$1.001,000$1,000.00$1.04$1.08$1.12$1.17
0000EBSweep and spud gravel for repair, store on roofSF$0.85300$255.00$0.88$0.92$0.96$0.99
0000ECRemove BUR for replace, incl. gravel, flashing, cants and 3" of insulationSF$1.0015,000$15,000.00$1.04$1.08$1.12$1.17
0000EDInstall gravel with hot asphaltSF$0.85300$255.00$0.88$0.92$0.96$0.99
0000EEInstall agg.-surfaced 4-ply BURS w/base; not incl. insulation, flashings and access, 20 yr mfr. warr.SF$4.002,000$8,000.00$4.16$4.33$4.50$4.68
0000EFRepair blisters and splits in BUR membrane per NRCA repair guidelinesSF$6.00100$600.00$6.24$6.49$6.75$7.02
0000EGRepair wind scours per NRCA repair guidelinesSF$3.00200$600.00$3.12$3.24$3.37$3.51
0000EHInstall 2-ply mopped roof for vapor barrier or temp roofSF$2.50500$1,250.00$2.60$2.70$2.81$2.92
SINGLE-PLY ROOFING SYSTEMS
0000FAInstall .060" fully-adhered EPDM membrane roof system; not incl. insulation, flashings and accessories; 20 yr mfr. warr.SF$3.508,000$28,000.00$3.64$3.79$3.94$4.09
0000FBInstall EPDM flashing system on .060" EPDM roof edges; incl. fasteners, sealants, adhesives, cover strips and access. (not incl. nailers, cants and metal flashings)LF$5.00700$3,500.00$5.20$5.41$5.62$5.85
0000FCInstall EPDM roof membrane patchSF$4.0010$40.00$4.16$4.33$4.50$4.68
0000FDInstall .060" fully-adhered PVC membrane roof system; not incl. insulation, flashings and accessories; 20 yr mfr. warr.SF$4.0010,000$40,000.00$4.16$4.33$4.50$4.68
0000FEInstall PVC flashing system on .060" EPDM roof edges; incl. fasteners, sealants, adhesives, cover strips and access. (not incl. nailers, cants and metal flashings)LF$5.50800$4,400.00$5.72$5.95$6.19$6.43
0000FFInstall PVC roof membrane patchSF$5.005$25.00$5.20$5.41$5.62$5.85
0000FGInstall water-based, liquid acrylic roofing membrane, TOPCOAT or approved equal, two coatsSF$4.00500$2,000.00$4.16$4.33$4.50$4.68
0000FHInstall synthetic rubber waterproofing elastomeric sealant, TOPCOAT FLASHING GRADE or approved equal,SF$4.00500$2,000.00$4.16$4.33$4.50$4.68
0000FIInstall non-woven, spunbound polyester seam reinforcing fabric, TOPCOAT TOPESTER or approved equalSF$1.20300$360.00$1.25$1.30$1.35$1.40
FLASHINGS AND METALS
0000GARemove and replace base flashing for repair, <5' per locationLF$5.0050$250.00$5.20$5.41$5.62$5.85
0000GBRemove existing base flashing and fiber cantsLF$1.50200$300.00$1.56$1.62$1.69$1.75
0000GCInstall 2-ply mineral-surfaced modified bitumen base flashingLF$5.00200$1,000.00$5.20$5.41$5.62$5.85
0000GDRemove, clean, straighten and reinstall sheet metal flashingLF$2.50800$2,000.00$2.60$2.70$2.81$2.92
0000GESawcut for reglet in masonry or concreteLF$4.00200$800.00$4.16$4.33$4.50$4.68
0000GFInstall Kynar-finished steel counter flashingLF$4.501,000$4,500.00$4.68$4.87$5.06$5.26
0000GGInstall and strip-in 24 ga. Kynar-finished steel gravel stop (up to 8"face)LF$5.00100$500.00$5.20$5.41$5.62$5.85
0000GHRemove existing sheet metal fascia, coping and flashingSF$0.602,000$1,200.00$0.62$0.65$0.67$0.70
0000GIInstall 24 ga. Kynar-finished fascia, coping and flashingSF$5.003,000$15,000.00$5.20$5.41$5.62$5.85
0000GJInstall 24 ga. Kynar-finished soffit panel, plain or ventedSF$4.50800$3,600.00$4.68$4.87$5.06$5.26
0000GKIncreased cost for vented ridge flashing vs non-ventedLF$7.00300$2,100.00$7.28$7.57$7.87$8.19
0000GLInstall 24 ga. galvanized steel continous cleatLF$3.201,000$3,200.00$3.33$3.46$3.60$3.74
0000GMInstall 4 lb. lead flashingSF$5.00100$500.00$5.20$5.41$5.62$5.85
0000GNInstall pipe penetration flashing: 0 to 6" dia.EA$40.0040$1,600.00$41.60$43.26$44.99$46.79
0000GOInstall pipe penetration flashing: 6"+ to 12" dia.EA$50.005$250.00$52.00$54.08$56.24$58.49
GUTTERS AND DOWNSPOUTS
0000JAClean out gutters and downspoutsLF$1.00300$300.00$1.04$1.08$1.12$1.17
0000JBRemove existing gutters and downspoutsLF$0.70500$350.00$0.73$0.76$0.79$0.82
0000JCRehang and correct pitch of existing gutters/spoutsLF$3.50100$350.00$3.64$3.79$3.94$4.09
0000JDInstall Kynar pre-finished sheet metal guttersLF$8.001,000$8,000.00$8.32$8.65$9.00$9.36
0000JEInstall Kynar pre-finished sheet metal downspoutsLF$7.50800$6,000.00$7.80$8.11$8.44$8.77
0000JFInstall Kynar pre-finishedsheet metal roof scupper boxEA$100.005$500.00$104.00$108.16$112.49$116.99
0000JGInstall precast concrete splash blocksEA$30.0020$600.00$31.20$32.45$33.75$35.10
SEALANTS
0000KARemove existing backer rod and sealant, clean joint for resealLF$1.25300$375.00$1.30$1.35$1.41$1.46
0000KBInstall backer rod and polyurethane sealant: 0 to 1/2" wideLF$3.50150$525.00$3.64$3.79$3.94$4.09
0000KCInstall backer rod and polyurethane sealant: >1/2" to 3/4" wideLF$4.00100$400.00$4.16$4.33$4.50$4.68
0000KDInstall backer rod and polyurethane sealant: >3/4" wideLF$4.5050$225.00$4.68$4.87$5.06$5.26
0000KEInstall polyurethane sealant, misc. joints and seams: no backer rodLB$15.00150$2,250.00$15.60$16.22$16.87$17.55
0000KFInstall butyl sealant, misc. joints and seams: no backer rodLB$15.00100$1,500.00$15.60$16.22$16.87$17.55
ROOF DRAINS
0000LAClean in and around roof drainsEA$25.0015$375.00$26.00$27.04$28.12$29.25
0000LBRemove existing roof drainEA$100.004$400.00$104.00$108.16$112.49$116.99
0000LCInstall new 4" roof drain in wood or steel deckEA$500.002$1,000.00$520.00$540.80$562.43$584.93
0000LDInstall new 4" roof drain pipingLF$25.0050$1,250.00$26.00$27.04$28.12$29.25
0000LEInstall new clamp ring and boltsEA$60.0020$1,200.00$62.40$64.90$67.49$70.19
0000LFInstall new strainer basketEA$40.0010$400.00$41.60$43.26$44.99$46.79
0000LGRe-flash existing drain in BUR w/ new flashing, gravel guard and strip-inEA$170.005$850.00$176.80$183.87$191.23$198.88
0000LHRe-flash existing drain in single ply roofEA$100.0030$3,000.00$104.00$108.16$112.49$116.99
0000LIInstall 4" PVC retrofit drain insertEA$130.005$650.00$135.20$140.61$146.23$152.08
MISCELLANEOUS TASKS
0000MACrane Rental w/ Operator, per dayDay$1,200.0010$12,000.00$1,248.00$1,297.92$1,349.84$1,403.83
0000MBInstall aluminum roof coatingSF$0.80200$160.00$0.83$0.87$0.90$0.94
0000MCInstall new EPDM walkway padSF$4.00200$800.00$4.16$4.33$4.50$4.68
0000MDInstall new asphalt plank walkwaySF$4.0020$80.00$4.16$4.33$4.50$4.68
0000MEInstall new concrete paver walkwaySF$6.00200$1,200.00$6.24$6.49$6.75$7.02
0000MFFabricate & install plumbers vent extension 2-6" diamLF$35.0030$1,050.00$36.40$37.86$39.37$40.95
0000MGInstall neoprene expansion joint cover (not incl. curbs and flashings)LF$17.00100$1,700.00$17.68$18.39$19.12$19.89
0000MHRemove and re-install existing ventilatorEA$70.0050$3,500.00$72.80$75.71$78.74$81.89
0000MIRemove and re-install rooftop mounted equipmentLB$2.002,000$4,000.00$2.08$2.16$2.25$2.34
0000MJFill pitch pansEA$40.0020$800.00$41.60$43.26$44.99$46.79
0000MKInstall water & ice shieldSF$1.002,000$2,000.00$1.04$1.08$1.12$1.17
0000MLInstall synthetic rubberized underlayment; CETCO Strongseal or equalSF$1.206,000$7,200.00$1.25$1.30$1.35$1.40
0000MMInstall 15 lb. felt underlayment, no moppingSF$0.258,000$2,000.00$0.26$0.27$0.28$0.29
0000MNInstall 30 lb. felt underlayment, no moppingSF$0.354,000$1,400.00$0.36$0.38$0.39$0.41
0000MORemove existing, deteriorated steel roof deckingSF$1.50100$150.00$1.56$1.62$1.69$1.75
0000MPInstall new steel roof decking to match existingSF$4.50100$450.00$4.68$4.87$5.06$5.26
0000MQField paint wood or metal surfaceSF$0.50500$250.00$0.52$0.54$0.56$0.58
0000MRSiloxane Masonry Water Repellant5 Gal$250.002$500.00$260.00$270.40$281.22$292.46
MOBILIZATION AND SERVICE CALLS
0000NALeak service call (Two-man crew, three hours on-site, first $100 in materials)EA$600.0015$9,000.00$624.00$648.96$674.92$701.92
0000NBAfter hours leak service callEA$900.002$1,800.00$936.00$973.44$1,012.38$1,052.87
0000NCExtended time on site for service call crew, when authorizedHR$100.0010$1,000.00$104.00$108.16$112.49$116.99
0000NDMobilization of roof repair crew, once each per facility, per delivery orderEA$300.0020$6,000.00$312.00$324.48$337.46$350.96
0000NEMobilization and prep. of asphalt kettle, once each per facility, per delivery orderEA$450.005$2,250.00$468.00$486.72$506.19$526.44
TOTAL$544,027.00

&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB

&C&P OF &N&RGOV ESTIMATE

2011 Base Year

BASE YEAR GOVT EST: 2011-2016 ROOF IDIQ CONTRACT
FA4690-11-B-0101 Attachment 28 Page 1 of 4
CLINDESCRIPTIONUNIT OF ISSUEUNIT COSTESTIMATED QUANTITYEXTENDED COST
ASPHALT SHINGLES
0001AARemove and replace individual shingles; match existingSF500
0001ABRemove shingles, edge metal and underlayment for reroofSF8,000
0001ACInstall edge metal for reshinglingLF600
0001ADInstall laminated architectural shinglesSF8,000
WOOD
0001AERemove and replace deteriorated wood deckingSF320
0001AFInstall 1/2" CDX plywood sheathingSF6,000
0001AGInstall 7/16" OSB sheathingSF6,000
0001AHInstall 19/32" OSB sheathingSF4,000
0001AJInstall 19/32" OSB backing for roof membrane flashingsSF2,000
0001AKRemove existing wood framing, curbing, blocking and nailersBF3,000
0001ALInstall treated wood cants, curbing, blocking and nailersBF5,000
0001AMInstall wood framingBF1,000
0001ANRemove existing wood trim & fascia boardSF1,000
0001APInstall wood trim and fascia boardBF500
ROOF INSULATION
0001AQRemove existing insulationBF20,000
0001ARInstall tapered polyisocyanurate insulationBF5,000
0001ASInstall coverboard for PVC or EPDM recoverSF4,000
0001ATInstall 3" polyisocyanurate insulationSF10,000
0001AUInstall 4" polyisocyanurate insulationSF16,000
0001AVInstall 1-1/2" fiberglass batt insulation, unfacedSF8,000
0001AWInstall R19 fiberglass batt insulation, unfacedSF500
0001AXInstall R38 fiberglass batt insulation, unfacedSF2,000
0001AYInstall 6 mil polyethelene vapor barrierSF8,000
FA4690-11-B-0101 Attachment 28 Page 2 of 4
METAL ROOFING SYSTEMS
0001AZRemove existing metal roof or wall panels and flashingsSF200
0001BAReattach existing loose metal roof or wall panels and flashingsSF1,000
0001BBInstall corrugated aluminum roof or wall panels, field paintedSF100
0001BCInstall corrugated steel roof or wall panels, field paintedSF100
0001BDInstall SSMR system: 20 yr warr.SF8,000
0001BEInstall light-gage steel supports for SSMR systemLB2,000
0001BFInstall SSMR system flashing for rake, eave, sidewall or headwallLF400
0001BGInstall SSMR system flashing for ridge, hip or valleyLF600
0001BHInstall SSMR system snow retention systemLF400
BUILT-UP ROOFING SYSTEM (BURS)
0001BJSpud and remove existing gravel for recoverSF1,000
0001BKSweep and spud gravel for repair, store on roofSF300
0001BLRemove BUR for roof replacementSF15,000
0001BMInstall gravel with hot asphaltSF300
0001BNRepair blisters and splits in BUR membraneSF100
0001BPRepair wind scoursSF200
0001BQInstall 2-ply mopped roofSF500
SINGLE-PLY ROOFING SYSTEMS
0001BRInstall .060" fully-adhered EPDM membrane roof systemSF8,000
0001BSInstall EPDM flashing system on .060" EPDMLF700
0001BTInstall EPDM roof membrane patchSF10
0001BUInstall .060" fully-adhered PVC membrane roof systemSF10,000
0001BWInstall PVC flashing system on .060" PVCLF800
0001BXInstall PVC roof membrane patchSF5
0001BYInstall water-based, liquid acrylic roofing membraneSF500
0001BZInstall synthetic rubber waterproofing elastomeric sealantSF500
0001CAInstall non-woven, spunbound polyester seam reinforcing fabricSF300
FA4690-11-B-0101 Attachment 28 Page 3 of 4
FLASHINGS AND METALS
0001CBRemove and replace base flashing for repairLF50
0001CCRemove existing base flashing and fiber cantsLF200
0001CDInstall 2-ply mineral-surfaced modified bitumen base flashingLF200
0001CERemove, clean, straighten and reinstall sheet metal flashingLF800
0001CFSawcut for reglet in masonry or concreteLF200
0001CGInstall Kynar-finished steel counter flashingLF1,000
0001CHRemove existing sheet metal fascia, coping and flashingSF2,000
0001CJInstall 24 ga. Kynar-finished fascia, coping and flashingSF3,000
0001CKInstall 24 ga. Kynar-finished soffit panel, plain or ventedSF800
0001CLIncreased cost for vented ridge flashing vs non-ventedLF300
0001CMInstall 24 ga. galvanized steel continous cleatLF1,000
0001CNInstall pipe penetration flashing: 0 to 6" dia.EA40
0001CPInstall pipe penetration flashing: 6"+ to 12" dia.EA5
GUTTERS AND DOWNSPOUTS
0001CQClean out gutters and downspoutsLF300
0001CRRemove existing gutters and downspoutsLF500
0001CSInstall Kynar pre-finished sheet metal guttersLF1,000
0001CTInstall Kynar pre-finished sheet metal downspoutsLF800
0001CUInstall Kynar pre-finishedsheet metal roof scupper boxEA5
0001CVInstall precast concrete splash blocksEA20
SEALANTS
0001CWRemove existing backer rod and sealant, clean joint for resealLF300
0001CXInstall backer rod and polyurethane sealant: 0 to 1/2" wideLF150
0001CYInstall backer rod and polyurethane sealant: >1/2" to 3/4" wideLF100
0001CZInstall backer rod and polyurethane sealant: >3/4" wideLF50
0001DAInstall polyurethane sealant, misc. joints and seamsLB150
0001DBInstall butyl sealant, misc. joints and seams: no backer rodLB100
FA4690-11-B-0101 Attachment 28 Page 4 of 4
ROOF DRAINS
0001DCClean in and around roof drainsEA15
0001DDInstall new clamp ring and boltsEA20
0001DEInstall new strainer basketEA10
0001DFRe-flash existing drain in single ply roofEA30
MISCELLANEOUS TASKS
0001DGInstall new EPDM walkway padSF200
0001DHInstall new concrete paver walkwaySF200
0001DJFabricate & install plumbers vent extension 2-4" diamLF30
0001DKRemove and re-install existing ventilatorEA50
0001DLRemove and re-install rooftop mounted equipmentLB2,000
0001DMFill pitch pansEA20
0001DNInstall water & ice shieldSF2,000
0001DPInstall synthetic rubberized underlaymentSF6,000
0001DQInstall #15 felt underlayment, no moppingSF8,000
0001DRRemove existing, deteriorated steel roof deckingSF100
0001DSInstall new steel roof decking to match existingSF100
0001DTField paint wood or metal surfaceSF500
0001DUApply Siloxane Masonry Water Repellant5 Gal2
MOBILIZATION AND SERVICE CALLS
0001DWLeak service callEA25
0001DXAfter hours leak service callEA3
0001DYExtended time on site for service call crewHR30
0001DZMobilization of roofing crewEA15
0001EAMobilization and prep. of asphalt kettleEA5
TOTAL$0.00

&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB

2012 1ST OPTION

1ST OPTION YEAR GOVT EST: 2011-2015 ROOF IDIQ CONTRACT
CLINDESCRIPTIONUNIT OF ISSUEUNIT COSTESTIMATED QUANTITYEXTENDED COST
FA4690-11-B-0101 Attachment 28 Page 1 of 4
ASPHALT SHINGLES
0001AARemove and replace individual shingles; match existingSF500
0001ABRemove shingles, edge metal and underlayment for reroofSF8,000
0001ACInstall edge metal for reshinglingLF600
0001ADInstall laminated architectural shinglesSF8,000
WOOD
0001AERemove and replace deteriorated wood deckingSF320
0001AFInstall 1/2" CDX plywood sheathingSF6,000
0001AGInstall 7/16" OSB sheathingSF6,000
0001AHInstall 19/32" OSB sheathingSF4,000
0001AJInstall 19/32" OSB backing for roof membrane flashingsSF2,000
0001AKRemove existing wood framing, curbing, blocking and nailersBF3,000
0001ALInstall treated wood cants, curbing, blocking and nailersBF5,000
0001AMInstall wood framingBF1,000
0001ANRemove existing wood trim & fascia boardSF1,000
0001APInstall wood trim and fascia boardBF500
ROOF INSULATION
0001AQRemove existing insulationBF20,000
0001ARInstall tapered polyisocyanurate insulationBF5,000
0001ASInstall coverboard for PVC or EPDM recoverSF4,000
0001ATInstall 3" polyisocyanurate insulationSF10,000
0001AUInstall 4" polyisocyanurate insulationSF16,000
0001AVInstall 1-1/2" fiberglass batt insulation, unfacedSF8,000
0001AWInstall R19 fiberglass batt insulation, unfacedSF500
0001AXInstall R38 fiberglass batt insulation, unfacedSF2,000
0001AYInstall 6 mil polyethelene vapor barrierSF8,000
FA4690-11-B-0101 Attachment 28 Page 2 of 4
METAL ROOFING SYSTEMS
0001AZRemove existing metal roof or wall panels and flashingsSF200
0001BAReattach existing loose metal roof or wall panels and flashingsSF1,000
0001BBInstall corrugated aluminum roof or wall panels, field paintedSF100
0001BCInstall corrugated steel roof or wall panels, field paintedSF100
0001BDInstall SSMR system: 20 yr warr.SF8,000
0001BEInstall light-gage steel supports for SSMR systemLB2,000
0001BFInstall SSMR system flashing for rake, eave, sidewall or headwallLF400
0001BGInstall SSMR system flashing for ridge, hip or valleyLF600
0001BHInstall SSMR system snow retention systemLF400
BUILT-UP ROOFING SYSTEM (BURS)
0001BJSpud and remove existing gravel for recoverSF1,000
0001BKSweep and spud gravel for repair, store on roofSF300
0001BLRemove BUR for roof replacementSF15,000
0001BMInstall gravel with hot asphaltSF300
0001BNRepair blisters and splits in BUR membraneSF100
0001BPRepair wind scoursSF200
0001BQInstall 2-ply mopped roofSF500
SINGLE-PLY ROOFING SYSTEMS
0001BRInstall .060" fully-adhered EPDM membrane roof systemSF8,000
0001BSInstall EPDM flashing system on .060" EPDMLF700
0001BTInstall EPDM roof membrane patchSF10
0001BUInstall .060" fully-adhered PVC membrane roof systemSF10,000
0001BWInstall PVC flashing system on .060" PVCLF800
0001BXInstall PVC roof membrane patchSF5
0001BYInstall water-based, liquid acrylic roofing membraneSF500
0001BZInstall synthetic rubber waterproofing elastomeric sealantSF500
0001CAInstall non-woven, spunbound polyester seam reinforcing fabricSF300
FA4690-11-B-0101 Attachment 28 Page 3 of 4
FLASHINGS AND METALS
0001CBRemove and replace base flashing for repairLF50
0001CCRemove existing base flashing and fiber cantsLF200
0001CDInstall 2-ply mineral-surfaced modified bitumen base flashingLF200
0001CERemove, clean, straighten and reinstall sheet metal flashingLF800
0001CFSawcut for reglet in masonry or concreteLF200
0001CGInstall Kynar-finished steel counter flashingLF1,000
0001CHRemove existing sheet metal fascia, coping and flashingSF2,000
0001CJInstall 24 ga. Kynar-finished fascia, coping and flashingSF3,000
0001CKInstall 24 ga. Kynar-finished soffit panel, plain or ventedSF800
0001CLIncreased cost for vented ridge flashing vs non-ventedLF300
0001CMInstall 24 ga. galvanized steel continous cleatLF1,000
0001CNInstall pipe penetration flashing: 0 to 6" dia.EA40
0001CPInstall pipe penetration flashing: 6"+ to 12" dia.EA5
GUTTERS AND DOWNSPOUTS
0001CQClean out gutters and downspoutsLF300
0001CRRemove existing gutters and downspoutsLF500
0001CSInstall Kynar pre-finished sheet metal guttersLF1,000
0001CTInstall Kynar pre-finished sheet metal downspoutsLF800
0001CUInstall Kynar pre-finishedsheet metal roof scupper boxEA5
0001CVInstall precast concrete splash blocksEA20
SEALANTS
0001CWRemove existing backer rod and sealant, clean joint for resealLF300
0001CXInstall backer rod and polyurethane sealant: 0 to 1/2" wideLF150
0001CYInstall backer rod and polyurethane sealant: >1/2" to 3/4" wideLF100
0001CZInstall backer rod and polyurethane sealant: >3/4" wideLF50
0001DAInstall polyurethane sealant, misc. joints and seamsLB150
0001DBInstall butyl sealant, misc. joints and seams: no backer rodLB100
FA4690-11-B-0101 Attachment 28 Page 4 of 4
ROOF DRAINS
0001DCClean in and around roof drainsEA15
0001DDInstall new clamp ring and boltsEA20
0001DEInstall new strainer basketEA10
0001DFRe-flash existing drain in single ply roofEA30
MISCELLANEOUS TASKS
0001DGInstall new EPDM walkway padSF200
0001DHInstall new concrete paver walkwaySF200
0001DJFabricate & install plumbers vent extension 2-4" diamLF30
0001DKRemove and re-install existing ventilatorEA50
0001DLRemove and re-install rooftop mounted equipmentLB2,000
0001DMFill pitch pansEA20
0001DNInstall water & ice shieldSF2,000
0001DPInstall synthetic rubberized underlaymentSF6,000
0001DQInstall #15 felt underlayment, no moppingSF8,000
0001DRRemove existing, deteriorated steel roof deckingSF100
0001DSInstall new steel roof decking to match existingSF100
0001DTField paint wood or metal surfaceSF500
0001DUApply Siloxane Masonry Water Repellant5 Gal2
MOBILIZATION AND SERVICE CALLS
0001DWLeak service callEA25
0001DXAfter hours leak service callEA3
0001DYExtended time on site for service call crewHR30
0001DZMobilization of roofing crewEA15
0001EAMobilization and prep. of asphalt kettleEA5
TOTAL$0.00

&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB

&C&P OF &N&RGOV ESTIMATE

2013 2ND OPTION

2ND OPTION YEAR GOVT EST: 2011-2015 ROOF IDIQ CONTRACT
CLINDESCRIPTIONUNIT OF ISSUEUNIT COSTESTIMATED QUANTITYEXTENDED COST
FA4690-11-B-0101 Attachment 28 Page 1 of 4
ASPHALT SHINGLES
0001AARemove and replace individual shingles; match existingSF500
0001ABRemove shingles, edge metal and underlayment for reroofSF8,000
0001ACInstall edge metal for reshinglingLF600
0001ADInstall laminated architectural shinglesSF8,000
WOOD
0001AERemove and replace deteriorated wood deckingSF320
0001AFInstall 1/2" CDX plywood sheathingSF6,000
0001AGInstall 7/16" OSB sheathingSF6,000
0001AHInstall 19/32" OSB sheathingSF4,000
0001AJInstall 19/32" OSB backing for roof membrane flashingsSF2,000
0001AKRemove existing wood framing, curbing, blocking and nailersBF3,000
0001ALInstall treated wood cants, curbing, blocking and nailersBF5,000
0001AMInstall wood framingBF1,000
0001ANRemove existing wood trim & fascia boardSF1,000
0001APInstall wood trim and fascia boardBF500
ROOF INSULATION
0001AQRemove existing insulationBF20,000
0001ARInstall tapered polyisocyanurate insulationBF5,000
0001ASInstall coverboard for PVC or EPDM recoverSF4,000
0001ATInstall 3" polyisocyanurate insulationSF10,000
0001AUInstall 4" polyisocyanurate insulationSF16,000
0001AVInstall 1-1/2" fiberglass batt insulation, unfacedSF8,000
0001AWInstall R19 fiberglass batt insulation, unfacedSF500
0001AXInstall R38 fiberglass batt insulation, unfacedSF2,000
0001AYInstall 6 mil polyethelene vapor barrierSF8,000
FA4690-11-B-0101 Attachment 28 Page 2 of 4
METAL ROOFING SYSTEMS
0001AZRemove existing metal roof or wall panels and flashingsSF200
0001BAReattach existing loose metal roof or wall panels and flashingsSF1,000
0001BBInstall corrugated aluminum roof or wall panels, field paintedSF100
0001BCInstall corrugated steel roof or wall panels, field paintedSF100
0001BDInstall SSMR system: 20 yr warr.SF8,000
0001BEInstall light-gage steel supports for SSMR systemLB2,000
0001BFInstall SSMR system flashing for rake, eave, sidewall or headwallLF400
0001BGInstall SSMR system flashing for ridge, hip or valleyLF600
0001BHInstall SSMR system snow retention systemLF400
BUILT-UP ROOFING SYSTEM (BURS)
0001BJSpud and remove existing gravel for recoverSF1,000
0001BKSweep and spud gravel for repair, store on roofSF300
0001BLRemove BUR for roof replacementSF15,000
0001BMInstall gravel with hot asphaltSF300
0001BNRepair blisters and splits in BUR membraneSF100
0001BPRepair wind scoursSF200
0001BQInstall 2-ply mopped roofSF500
SINGLE-PLY ROOFING SYSTEMS
0001BRInstall .060" fully-adhered EPDM membrane roof systemSF8,000
0001BSInstall EPDM flashing system on .060" EPDMLF700
0001BTInstall EPDM roof membrane patchSF10
0001BUInstall .060" fully-adhered PVC membrane roof systemSF10,000
0001BWInstall PVC flashing system on .060" PVCLF800
0001BXInstall PVC roof membrane patchSF5
0001BYInstall water-based, liquid acrylic roofing membraneSF500
0001BZInstall synthetic rubber waterproofing elastomeric sealantSF500
0001CAInstall non-woven, spunbound polyester seam reinforcing fabricSF300
FA4690-11-B-0101 Attachment 28 Page 3 of 4
FLASHINGS AND METALS
0001CBRemove and replace base flashing for repairLF50
0001CCRemove existing base flashing and fiber cantsLF200
0001CDInstall 2-ply mineral-surfaced modified bitumen base flashingLF200
0001CERemove, clean, straighten and reinstall sheet metal flashingLF800
0001CFSawcut for reglet in masonry or concreteLF200
0001CGInstall Kynar-finished steel counter flashingLF1,000
0001CHRemove existing sheet metal fascia, coping and flashingSF2,000
0001CJInstall 24 ga. Kynar-finished fascia, coping and flashingSF3,000
0001CKInstall 24 ga. Kynar-finished soffit panel, plain or ventedSF800
0001CLIncreased cost for vented ridge flashing vs non-ventedLF300
0001CMInstall 24 ga. galvanized steel continous cleatLF1,000
0001CNInstall pipe penetration flashing: 0 to 6" dia.EA40
0001CPInstall pipe penetration flashing: 6"+ to 12" dia.EA5
GUTTERS AND DOWNSPOUTS
0001CQClean out gutters and downspoutsLF300
0001CRRemove existing gutters and downspoutsLF500
0001CSInstall Kynar pre-finished sheet metal guttersLF1,000
0001CTInstall Kynar pre-finished sheet metal downspoutsLF800
0001CUInstall Kynar pre-finishedsheet metal roof scupper boxEA5
0001CVInstall precast concrete splash blocksEA20
SEALANTS
0001CWRemove existing backer rod and sealant, clean joint for resealLF300
0001CXInstall backer rod and polyurethane sealant: 0 to 1/2" wideLF150
0001CYInstall backer rod and polyurethane sealant: >1/2" to 3/4" wideLF100
0001CZInstall backer rod and polyurethane sealant: >3/4" wideLF50
0001DAInstall polyurethane sealant, misc. joints and seamsLB150
0001DBInstall butyl sealant, misc. joints and seams: no backer rodLB100
FA4690-11-B-0101 Attachment 28 Page 4 of 4
ROOF DRAINS
0001DCClean in and around roof drainsEA15
0001DDInstall new clamp ring and boltsEA20
0001DEInstall new strainer basketEA10
0001DFRe-flash existing drain in single ply roofEA30
MISCELLANEOUS TASKS
0001DGInstall new EPDM walkway padSF200
0001DHInstall new concrete paver walkwaySF200
0001DJFabricate & install plumbers vent extension 2-4" diamLF30
0001DKRemove and re-install existing ventilatorEA50
0001DLRemove and re-install rooftop mounted equipmentLB2,000
0001DMFill pitch pansEA20
0001DNInstall water & ice shieldSF2,000
0001DPInstall synthetic rubberized underlaymentSF6,000
0001DQInstall #15 felt underlayment, no moppingSF8,000
0001DRRemove existing, deteriorated steel roof deckingSF100
0001DSInstall new steel roof decking to match existingSF100
0001DTField paint wood or metal surfaceSF500
0001DUApply Siloxane Masonry Water Repellant5 Gal2
MOBILIZATION AND SERVICE CALLS
0001DWLeak service callEA25
0001DXAfter hours leak service callEA3
0001DYExtended time on site for service call crewHR30
0001DZMobilization of roofing crewEA15
0001EAMobilization and prep. of asphalt kettleEA5
TOTAL$0.00

&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB

&C&P OF &N&RGOV ESTIMATE

2014 3RD OPTION

3RD OPTION YEAR GOVT EST: 2011-2015 ROOF IDIQ CONTRACT
CLINDESCRIPTIONUNIT OF ISSUEUNIT COSTESTIMATED QUANTITYEXTENDED COST
FA4690-11-B-0101 Attachment 28 Page 1 of 4
ASPHALT SHINGLES
0001AARemove and replace individual shingles; match existingSF500
0001ABRemove shingles, edge metal and underlayment for reroofSF8,000
0001ACInstall edge metal for reshinglingLF600
0001ADInstall laminated architectural shinglesSF8,000
WOOD
0001AERemove and replace deteriorated wood deckingSF320
0001AFInstall 1/2" CDX plywood sheathingSF6,000
0001AGInstall 7/16" OSB sheathingSF6,000
0001AHInstall 19/32" OSB sheathingSF4,000
0001AJInstall 19/32" OSB backing for roof membrane flashingsSF2,000
0001AKRemove existing wood framing, curbing, blocking and nailersBF3,000
0001ALInstall treated wood cants, curbing, blocking and nailersBF5,000
0001AMInstall wood framingBF1,000
0001ANRemove existing wood trim & fascia boardSF1,000
0001APInstall wood trim and fascia boardBF500
ROOF INSULATION
0001AQRemove existing insulationBF20,000
0001ARInstall tapered polyisocyanurate insulationBF5,000
0001ASInstall coverboard for PVC or EPDM recoverSF4,000
0001ATInstall 3" polyisocyanurate insulationSF10,000
0001AUInstall 4" polyisocyanurate insulationSF16,000
0001AVInstall 1-1/2" fiberglass batt insulation, unfacedSF8,000
0001AWInstall R19 fiberglass batt insulation, unfacedSF500
0001AXInstall R38 fiberglass batt insulation, unfacedSF2,000
0001AYInstall 6 mil polyethelene vapor barrierSF8,000
FA4690-11-B-0101 Attachment 28 Page 2 of 4
METAL ROOFING SYSTEMS
0001AZRemove existing metal roof or wall panels and flashingsSF200
0001BAReattach existing loose metal roof or wall panels and flashingsSF1,000
0001BBInstall corrugated aluminum roof or wall panels, field paintedSF100
0001BCInstall corrugated steel roof or wall panels, field paintedSF100
0001BDInstall SSMR system: 20 yr warr.SF8,000
0001BEInstall light-gage steel supports for SSMR systemLB2,000
0001BFInstall SSMR system flashing for rake, eave, sidewall or headwallLF400
0001BGInstall SSMR system flashing for ridge, hip or valleyLF600
0001BHInstall SSMR system snow retention systemLF400
BUILT-UP ROOFING SYSTEM (BURS)
0001BJSpud and remove existing gravel for recoverSF1,000
0001BKSweep and spud gravel for repair, store on roofSF300
0001BLRemove BUR for roof replacementSF15,000
0001BMInstall gravel with hot asphaltSF300
0001BNRepair blisters and splits in BUR membraneSF100
0001BPRepair wind scoursSF200
0001BQInstall 2-ply mopped roofSF500
SINGLE-PLY ROOFING SYSTEMS
0001BRInstall .060" fully-adhered EPDM membrane roof systemSF8,000
0001BSInstall EPDM flashing system on .060" EPDMLF700
0001BTInstall EPDM roof membrane patchSF10
0001BUInstall .060" fully-adhered PVC membrane roof systemSF10,000
0001BWInstall PVC flashing system on .060" PVCLF800
0001BXInstall PVC roof membrane patchSF5
0001BYInstall water-based, liquid acrylic roofing membraneSF500
0001BZInstall synthetic rubber waterproofing elastomeric sealantSF500
0001CAInstall non-woven, spunbound polyester seam reinforcing fabricSF300
FA4690-11-B-0101 Attachment 28 Page 3 of 4
FLASHINGS AND METALS
0001CBRemove and replace base flashing for repairLF50
0001CCRemove existing base flashing and fiber cantsLF200
0001CDInstall 2-ply mineral-surfaced modified bitumen base flashingLF200
0001CERemove, clean, straighten and reinstall sheet metal flashingLF800
0001CFSawcut for reglet in masonry or concreteLF200
0001CGInstall Kynar-finished steel counter flashingLF1,000
0001CHRemove existing sheet metal fascia, coping and flashingSF2,000
0001CJInstall 24 ga. Kynar-finished fascia, coping and flashingSF3,000
0001CKInstall 24 ga. Kynar-finished soffit panel, plain or ventedSF800
0001CLIncreased cost for vented ridge flashing vs non-ventedLF300
0001CMInstall 24 ga. galvanized steel continous cleatLF1,000
0001CNInstall pipe penetration flashing: 0 to 6" dia.EA40
0001CPInstall pipe penetration flashing: 6"+ to 12" dia.EA5
GUTTERS AND DOWNSPOUTS
0001CQClean out gutters and downspoutsLF300
0001CRRemove existing gutters and downspoutsLF500
0001CSInstall Kynar pre-finished sheet metal guttersLF1,000
0001CTInstall Kynar pre-finished sheet metal downspoutsLF800
0001CUInstall Kynar pre-finishedsheet metal roof scupper boxEA5
0001CVInstall precast concrete splash blocksEA20
SEALANTS
0001CWRemove existing backer rod and sealant, clean joint for resealLF300
0001CXInstall backer rod and polyurethane sealant: 0 to 1/2" wideLF150
0001CYInstall backer rod and polyurethane sealant: >1/2" to 3/4" wideLF100
0001CZInstall backer rod and polyurethane sealant: >3/4" wideLF50
0001DAInstall polyurethane sealant, misc. joints and seamsLB150
0001DBInstall butyl sealant, misc. joints and seams: no backer rodLB100
FA4690-11-B-0101 Attachment 28 Page 4 of 4
ROOF DRAINS
0001DCClean in and around roof drainsEA15
0001DDInstall new clamp ring and boltsEA20
0001DEInstall new strainer basketEA10
0001DFRe-flash existing drain in single ply roofEA30
MISCELLANEOUS TASKS
0001DGInstall new EPDM walkway padSF200
0001DHInstall new concrete paver walkwaySF200
0001DJFabricate & install plumbers vent extension 2-4" diamLF30
0001DKRemove and re-install existing ventilatorEA50
0001DLRemove and re-install rooftop mounted equipmentLB2,000
0001DMFill pitch pansEA20
0001DNInstall water & ice shieldSF2,000
0001DPInstall synthetic rubberized underlaymentSF6,000
0001DQInstall #15 felt underlayment, no moppingSF8,000
0001DRRemove existing, deteriorated steel roof deckingSF100
0001DSInstall new steel roof decking to match existingSF100
0001DTField paint wood or metal surfaceSF500
0001DUApply Siloxane Masonry Water Repellant5 Gal2
MOBILIZATION AND SERVICE CALLS
0001DWLeak service callEA25
0001DXAfter hours leak service callEA3
0001DYExtended time on site for service call crewHR30
0001DZMobilization of roofing crewEA15
0001EAMobilization and prep. of asphalt kettleEA5
TOTAL$0.00

&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB

&C&P OF &N&RGOV ESTIMATE

2015 4TH OPTION

4TH OPTION YEAR GOVT EST: 2011-2015 ROOF IDIQ CONTRACT
CLINDESCRIPTIONUNIT OF ISSUEUNIT COSTESTIMATED QUANTITYEXTENDED COST
FA4690-11-B-0101 Attachment 28 Page 1 of 4
ASPHALT SHINGLES
0001AARemove and replace individual shingles; match existingSF$4.26500
0001ABRemove shingles, edge metal and underlayment for reroofSF$0.738,000
0001ACInstall edge metal for reshinglingLF$1.46600
0001ADInstall laminated architectural shinglesSF$2.108,000
WOOD
0001AERemove and replace deteriorated wood deckingSF$3.76320
0001AFInstall 1/2" CDX plywood sheathingSF$3.216,000
0001AGInstall 7/16" OSB sheathingSF$2.076,000
0001AHInstall 19/32" OSB sheathingSF$2.434,000
0001AJInstall 19/32" OSB backing for roof membrane flashingsSF$3.162,000
0001AKRemove existing wood framing, curbing, blocking and nailersBF$1.103,000
0001ALInstall treated wood cants, curbing, blocking and nailersBF$3.645,000
0001AMInstall wood framingBF$4.141,000
0001ANRemove existing wood trim & fascia boardSF$1.521,000
0001APInstall wood trim and fascia boardBF$4.87500
ROOF INSULATION
0001AQRemove existing insulationBF20,000
0001ARInstall tapered polyisocyanurate insulationBF5,000
0001ASInstall coverboard for PVC or EPDM recoverSF4,000
0001ATInstall 3" polyisocyanurate insulationSF10,000
0001AUInstall 4" polyisocyanurate insulationSF16,000
0001AVInstall 1-1/2" fiberglass batt insulation, unfacedSF8,000
0001AWInstall R19 fiberglass batt insulation, unfacedSF500
0001AXInstall R38 fiberglass batt insulation, unfacedSF2,000
0001AYInstall 6 mil polyethelene vapor barrierSF8,000
FA4690-11-B-0101 Attachment 28 Page 2 of 4
METAL ROOFING SYSTEMS
0001AZRemove existing metal roof or wall panels and flashingsSF200
0001BAReattach existing loose metal roof or wall panels and flashingsSF1,000
0001BBInstall corrugated aluminum roof or wall panels, field paintedSF100
0001BCInstall corrugated steel roof or wall panels, field paintedSF100
0001BDInstall SSMR system: 20 yr warr.SF8,000
0001BEInstall light-gage steel supports for SSMR systemLB2,000
0001BFInstall SSMR system flashing for rake, eave, sidewall or headwallLF400
0001BGInstall SSMR system flashing for ridge, hip or valleyLF600
0001BHInstall SSMR system snow retention systemLF400
BUILT-UP ROOFING SYSTEM (BURS)
0001BJSpud and remove existing gravel for recoverSF1,000
0001BKSweep and spud gravel for repair, store on roofSF300
0001BLRemove BUR for roof replacementSF15,000
0001BMInstall gravel with hot asphaltSF300
0001BNRepair blisters and splits in BUR membraneSF100
0001BPRepair wind scoursSF200
0001BQInstall 2-ply mopped roofSF500
SINGLE-PLY ROOFING SYSTEMS
0001BRInstall .060" fully-adhered EPDM membrane roof systemSF8,000
0001BSInstall EPDM flashing system on .060" EPDMLF700
0001BTInstall EPDM roof membrane patchSF10
0001BUInstall .060" fully-adhered PVC membrane roof systemSF10,000
0001BWInstall PVC flashing system on .060" PVCLF800
0001BXInstall PVC roof membrane patchSF5
0001BYInstall water-based, liquid acrylic roofing membraneSF500
0001BZInstall synthetic rubber waterproofing elastomeric sealantSF500
0001CAInstall non-woven, spunbound polyester seam reinforcing fabricSF300
FA4690-11-B-0101 Attachment 28 Page 3 of 4
FLASHINGS AND METALS
0001CBRemove and replace base flashing for repairLF50
0001CCRemove existing base flashing and fiber cantsLF200
0001CDInstall 2-ply mineral-surfaced modified bitumen base flashingLF200
0001CERemove, clean, straighten and reinstall sheet metal flashingLF800
0001CFSawcut for reglet in masonry or concreteLF200
0001CGInstall Kynar-finished steel counter flashingLF1,000
0001CHRemove existing sheet metal fascia, coping and flashingSF2,000
0001CJInstall 24 ga. Kynar-finished fascia, coping and flashingSF3,000
0001CKInstall 24 ga. Kynar-finished soffit panel, plain or ventedSF800
0001CLIncreased cost for vented ridge flashing vs non-ventedLF300
0001CMInstall 24 ga. galvanized steel continous cleatLF1,000
0001CNInstall pipe penetration flashing: 0 to 6" dia.EA40
0001CPInstall pipe penetration flashing: 6"+ to 12" dia.EA5
GUTTERS AND DOWNSPOUTS
0001CQClean out gutters and downspoutsLF300
0001CRRemove existing gutters and downspoutsLF500
0001CSInstall Kynar pre-finished sheet metal guttersLF1,000
0001CTInstall Kynar pre-finished sheet metal downspoutsLF800
0001CUInstall Kynar pre-finishedsheet metal roof scupper boxEA5
0001CVInstall precast concrete splash blocksEA20
SEALANTS
0001CWRemove existing backer rod and sealant, clean joint for resealLF300
0001CXInstall backer rod and polyurethane sealant: 0 to 1/2" wideLF150
0001CYInstall backer rod and polyurethane sealant: >1/2" to 3/4" wideLF100
0001CZInstall backer rod and polyurethane sealant: >3/4" wideLF50
0001DAInstall polyurethane sealant, misc. joints and seamsLB150
0001DBInstall butyl sealant, misc. joints and seams: no backer rodLB100
FA4690-11-B-0101 Attachment 28 Page 4 of 4
ROOF DRAINS
0001DCClean in and around roof drainsEA15
0001DDInstall new clamp ring and boltsEA20
0001DEInstall new strainer basketEA10
0001DFRe-flash existing drain in single ply roofEA30
MISCELLANEOUS TASKS
0001DGInstall new EPDM walkway padSF200
0001DHInstall new concrete paver walkwaySF200
0001DJFabricate & install plumbers vent extension 2-4" diamLF30
0001DKRemove and re-install existing ventilatorEA50
0001DLRemove and re-install rooftop mounted equipmentLB2,000
0001DMFill pitch pansEA20
0001DNInstall water & ice shieldSF2,000
0001DPInstall synthetic rubberized underlaymentSF6,000
0001DQSF8,000
0001DRRemove existing, deteriorated steel roof deckingSF100
0001DSInstall new steel roof decking to match existingSF100
0001DTField paint wood or metal surfaceSF500
0001DUApply Siloxane Masonry Water Repellant5 Gal2
MOBILIZATION AND SERVICE CALLS
0001DWLeak service callEA25
0001DXAfter hours leak service callEA3
0001DYExtended time on site for service call crewHR30
0001DZMobilization of roofing crewEA15
0001EAMobilization and prep. of asphalt kettleEA5
TOTAL$0.00

&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB

File details come from the government source that posted it. Updated .