27. ROOF IDIQ CLINS.xls

XLS spreadsheet 49 KB Posted

Attached to
Roofing Systems IDIQ Federal contract opportunity
Solicitation number
FA4690-11-B-0101
Issued by
Department of the Air Force Air Combat Command

About this file

Roof IDIQ CLINs

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Systems IDIQ, newest first.
File Type Posted
Amend 1 SF 30.pdf PDF
ROOF IDIQ Bid Shedule.xls XLS spreadsheet
Amend 1 Pre-Proposal Conference.pdf PDF
4. Pennington Heavy HWY WD.rtf RTF text file
17. SECTION 07 53 23.rtf RTF text file
19. SECTION 07 60 00.rtf RTF text file
6. SECTION 00 TABLE OF CONTENTS.docx DOCX document
2. Building WD Pennington.doc DOC document
18. SECTION 07 54 19.rtf RTF text file
15. SECTION 07 42 13.rtf RTF text file
13. SECTION 07 22 00.rtf RTF text file
10. SECTION 06 10 00.rtf RTF text file
1. Building WD Meade.doc DOC document
23. SECTION 22 00 00.rtf RTF text file
24. Section 01000 General Requirements(2).rtf RTF text file
7. SECTION 01 33 00.rtf RTF text file
11. SECTION 07 19 00.rtf RTF text file
22. SECTION 09 90 00.rtf RTF text file
28. ROOF IDIQ Bid Shedule.xls XLS spreadsheet
FB4690-11-B-0101 Roofing Solicitation.pdf PDF
20. SECTION 07 61 14.rtf RTF text file
25. Section 01020 - Ellsworth AFB.rtf RTF text file
14. SECTION 07 31 13.rtf RTF text file
12. SECTION 07 21 16.rtf RTF text file
21. SECTION 07 92 00.rtf RTF text file
9. SECTION 05 50 13.rtf RTF text file
8. SECTION 02 41 00.rtf RTF text file
5. Pennington WD Residentual.doc DOC document
16. SECTION 07 51 13.rtf RTF text file
26. SECTION 01800 - Enviromental.rtf RTF text file
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE YEAR

CLIN DESCRIPTIONS - ROOF SYSTEMS MAINTENANCE AND REPAIR
CLINUNIT OF ISSUEDESCRIPTION
ASPHALT SHINGLES
AASFRemove and replace individual shingles; match existing type, texture and color, as available. Includes fasteners and roofing cement, as necessary. Measurement based upon exposed area of shingle(s).
ABSFRemove shingles, edge metal and underlayment for reroof; one or two layers, as required. Remove to deck and prep for reroof. Notify contracting officer of discrepancies NIC. Includes re-nailing loose sheathing. Does not include repair/replacement of sheathing.
ACLFInstall edge metal for reshingling. Includeds fasteners. Measurement based on actual dimensions of roof.
ADSFInstall laminated architectural shingles; Class A, minimum 265 lb/sq; Provide minimum 40-yr manufacturer's warranty. Includes fasteners, starter strip, ridge and hip shingles. Does not include underlayment, vents or flashing. Measurements based on actual dimensions of roof.
WOOD
AESFRemove and replace deteriorated wood decking, isolated areas, 1-1/2" max thickness. Cut out and replace deteriorated areas of wood decking as directed the CO. Replace with similar decking, or CDX plywood as directed by the CO. Includes removal, decking, fasteners and clips. Measurements based on actual areas replaced.
AFSFInstall 1/2" CDX plywood sheathing. Includes sheathing, fasteners and clips.
AGSFInstall 7/16" OSB sheathing. Includes sheathing, fasteners and clips.
AHSFInstall 19/32" OSB sheathing. Includes sheathing, fasteners and clips.
AJSFInstall 19/32" OSB backing for roof flashings and membranes. Install as directed over curbs, parapet walls, cants and crickets as a backer for adhered single-ply membranes and flashings. Includes fasteners and/or adhesives. Measurements based upon actual installed areas.
AKBFRemove existing wood framing, curbing, blocking and nailers. Remove and prep substrate to receive new materials, as necessary. Measurements based on nominal sizes of materials removed.
ALBFInstall treated wood cants, curbing, blocking and nailers. Provide treatment per applicable roof spec section. Includes fasteners, cutting, tapering, as required. Measurements based on nominal size of installed materials.
AMBFInstall wood framing. Includes fasteners. Does not include hangars, straps, anchors, bolts, clips, etc. Measurements based on nominal sizes of materials installed.
ANSFRemove existing wood trim & fascia board. Includes removal and prep of structure to receive new materials. Does not include new framing or furring. Measurements based upon actual area of boards removed.
APBFInstall wood trim and fascia board. Includes wood, fasteners, and installation. Does not include surface prep, priming and painting. Measurements based upon actual area installed.
ROOF INSULATION
AQBFRemove existing insulation. Includes removal and disposal of additional thickness of roof insulation, fasteners, adhesive, asphalt, vapor barrier and base sheet not included in applicable roof removal CLIN. Measurements based upon actual applicable area and thickness of roof assembly less thickness removed under the appropriate roof removal CLIN.
ARBFInstall tapered polyisocyanurate insulation. Taper and layout to be identified on the plans or provided by the Government. Includes tapered boards, adhesive, asphalt or fasteners as required. Measurements based upon average thickness of tapered boards x area of boards as installed per plan.
ASSFInstall coverboard for PVC or EPDM recover. Install manufacturer's recommended iso or gypsum coverboard, 1/2" - 1" thickness, including fasteners, adhesive or asphalt, for recover or over new insulation, as specified.
ATSFInstall 3" polyisocyanurate insulation in two layers with joints staggered. Includes asphalt, adhesive or fasteners, as applicable.
AUSFInstall 4" polyisocyanurate insulation in two layers with joints staggered. Includes asphalt, adhesive or fasteners, as applicable.
AVSFInstall 1-1/2" fiberglass batt insulation, unfaced, under standing seam roof panels.
AWSFInstall R19 fiberglass batt insulation, unfaced, installed in attics or wall cavities. Includes fasteners as required.
AXSFInstall R38 fiberglass batt insulation, unfaced, installed in attics or wall cavities. Includes fasteners as required.
AYSFInstall 6 mil polyethelene vapor barrier, including taped joints and repair before covering.
FA4690-11-B-0101 Attachment 28 Page 2 of 4
METAL ROOFING SYSTEMS
AZSFRemove existing metal roof or wall panels and flashings. Includes removal and disposal of metal, fasteners and any underlayment. Measurement based on area of coverage.
BASFReattach existing loose metal roof or wall panels and flashings. Includes new fasteners or clips, as required. Measurement based on area of coverage.
BBSFInstall corrugated aluminum roof or wall panels, field painted. Includes 0.032 bare aluminum panel to match existing, fasteners, prep, prime and paint. Measurement based on actual area of coverage.
BCSFInstall corrugated steel roof or wall panels, field painted. Includes 24 ga G90 finished panel to match existing, fasteners, prep, prime and paint. Measurement based on actual area of coverage.
BDSFInstall SSMR system: 20 yr warr. Includes panels, clips, fasteners, seam sealants and warranty. Does not include, deck, insulation, vapor barrier, flashings, gutters, closures, purlins, substrate, etc. Measurement shall be based on the actual area of the applicable roof.
BELBInstall light-gage steel supports for structural SSMR system incl. purlins, subpurlins, rafters, columns, braces, plates and fasteners. Does not include roof panels, flashings, closures, insulation, deck or sealants. Measurements based upon calculations from manufacturer's data.
BFLFInstall SSMR system flashing for rake, eave, sidewall or headwall incl. fasteners, closures, sealants, and counterflashing. Does not include gutters, vents, curbs or accessories. Measurement based on actual field length of flashing installation.
BGLFInstall SSMR system flashing for ridge, hip or valley including all fasteners, closures, sealants, and counterflashing. Does not include vents, gutters, curbs or accessories. Measurement based on actual field length of flashing installation.
BHLFInstall SSMR system snow retention system, S-5 Color Guard w/snow clips, or equal, clamped to SSMR system ribs. Includes clamps at all ribs, snow clips between all ribs, bar and color-matching metal. Measurement based on actual field length installation.
FA4690-11-B-0101 Attachment 28 Page 2 of 4
BUILT-UP ROOFING SYSTEM (BURS) BUR items referenced to BUR specification section and NRCA published guidelines and details for BUR roofing, reroofing and repair.
BJSFSpud and remove existing gravel for recover. Includes removal and disposal of loose gravel; spudding, removal and disposal of embedded gravel and high spots, and surface prep to receive recover or repair. Does not include new materials.
BKSFSweep and spud gravel for repair, store on roof. Includes sweeping of loose gravel, spudding of embedded gravel, and surface prep to receive repair. Does not include new materials.
BLSFRemove BUR for replace, incl. gravel, roof plies, insulation, flashing and cants. Includes removal of all materials to deck except for adhered, mopped base sheets and vapor barriers, which may remain. Includes removal of 3" maximum thickness of roof plies and insulation. Additional roof insulation thickness greater than 3" shall be included in item CA.
BMSFInstall gravel with hot asphalt. Includes new gravel and asphalt per specifications. For repairs per NRCA guidelines, existing gravel may be re-used.
BNSFRepair blisters and splits in BUR membrane per NRCA repair guidelines
BPSFRepair wind scours per NRCA repair guidelines
BQSFInstall 2-ply mopped roof for vapor barrier or temp roof
SINGLE-PLY ROOFING SYSTEMS
BRSFInstall .060" fully-adhered EPDM membrane roof system; not incl. insulation, flashings and accessories; 20 yr mfr. warr. Includes membrane, adhesive and field seams.
BSLFInstall EPDM flashing system on .060" EPDM roof edges and penetrations; incl. attachment strips, fasteners, sealants, adhesives, term. bars, cover strips and accessories. (not incl. nailers, cants, cleats and metal flashings)
BTSFInstall EPDM roof membrane patch. Measurement based size of patch as recommended by roof membrane manufacturer.
BUSFInstall .060" fully-adhered PVC membrane roof system; not incl. insulation, flashings and accessories; 20 yr mfr. warr. Includes membrane, adhesive and field seams.
BWLFInstall PVC flashing system on .060" PVC roof edges and penetrations; incl. attachment strips, fasteners, sealants, adhesives, cover strips and accessories. (not incl. nailers, cants cleats and metal flashings)
BXSFInstall PVC roof membrane patch. Measurement based size of patch as recommended by roof membrane manufacturer.
FA4690-11-B-0101 Attachment 28 Page 3 of 4
BYSFInstall water-based, liquid acrylic roofing membrane. "TOPCOAT MEMBRANE" system, or approved equal, applied in two coats for a total dft of 22-25 mils. Includes pressure washing, and tightening/encapsulating of fasteners. Does not include roof repairs, patching, priming or treatment of joints and seams with reinforcing fabric and flashing grade membrane.
BZSFInstall synthetic rubber waterproofing elastomeric sealant, TOPCOAT FLASHING GRADE or approved equal. Apply along seams, joints and base flashings at approximately 1 gal/ 12 SF. Includes surface prep, tightening/replacement of fasteners. Does not include final membrane or reinforcing fabric.
CASFInstall non-woven, spunbound polyester seam reinforcing fabric, TOPCOAT TOPESTER or approved equal. Instal 6" wide fabric embedded in FLASHING GRADE sealant along seams, joints and fastener lines as specified. Does not include surface prep, sealant or final membrane.
FLASHINGS AND METALS
CBLFRemove and replace base flashing for repair, <5' per location. Includes cutting and removal of sections of loose or unsound BUR base flashing, and covering with new mineral-surfaced modified bitumen base flashing per NRCA repair guidelines.
CCLFRemove existing base flashing and fiber cants. Includes removal of base flashing only in preparation for installing new BUR base flashing. Includes removal of base flashing, cutting roof plies, removing cants and surface prep to facilitate recover. Does not include new flashing, cant or recover materials.
CDLFInstall 2-ply mineral-surfaced modified bitumen base flashing per NRCA guidelines.
CELFRemove, clean, straighten and reinstall sheet metal flashing. Includes removal to prevent damage and allow for re-use, cleaning of excess sealant and coating, straightening to improve function and appearance and reinstallation with new fasteners as necessary. Does not include new flashing, paint, sealant, cleat, underlayment, reglet or related repairs.
CFLFSawcut for reglet in masonry or concrete. Includes sawcutting for new or modified reglet installation, up to 1" depth.
CGLFInstall Kynar-finished steel counter flashing. Includes two-piece, removable counter flashing system with fasteners and sealant for surface mount or reglet installation. Does not include cutting for reglet or removal of old flashing and sealant.
CHSFRemove existing sheet metal fascia, coping and flashing
CJSFInstall 24 ga. Kynar-finished fascia, coping and flashing. Includes misc. flashings of various shapes, lengths and widths not covered under any other CLIN. Measurement based upon actual "stretch-out" area of metal used.
CKSFInstall 24 ga. Kynar-finished soffit panel, plain or vented
CLLFIncreased cost for vented ridge flashing vs non-vented. Includes increased ridge flashing width, 1" thick venting media, sheet metal baffles, spacers and fasteners.
CMLFInstall 24 ga. galvanized steel continous cleat
CNEAInstall pipe penetration flashing: 0 to 6" dia.
CPEAInstall pipe penetration flashing: 6"+ to 12" dia.
GUTTERS AND DOWNSPOUTS
CQLFClean out gutters and downspouts
CRLFRemove existing gutters and downspouts
CSLFInstall Kynar pre-finished sheet metal gutters. Furnish and install 24 ga. Kynar-finished steel gutters up to 4"x6", as specified.
CTLFInstall Kynar pre-finished sheet metal downspouts. Furnish and install 24 ga. Kynar-finished steel downspouts up to 4"x6", as specified.
CUEAInstall Kynar pre-finished 24 ga. steel roof scupper box
CVEAInstall precast concrete splash blocks
FA4690-11-B-0101 Attachment 28 Page 4 of 4
SEALANTS
CWLFRemove existing backer rod and sealant, clean joint for reseal
CXLFInstall backer rod and polyurethane sealant: 0 to 1/2" wide
CYLFInstall backer rod and polyurethane sealant: >1/2" to 3/4" wide
CZLFInstall backer rod and polyurethane sealant: >3/4" wide
DALBInstall polyurethane sealant, misc. joints and seams: no backer rod
DBLBInstall butyl sealant, misc. joints and seams: no backer rod
ROOF DRAINS
DCEAClean in and around roof drains. Remove debris from drain, drain basket and drain sump area. Inspect drain and reinstall basket. Remove debris from roof
DDEAInstall new clamp ring and bolts. Provide and install new ring and bolts when reflashing drain. Drill and tap broken bolts or stripped holes.
DEEAInstall new strainer basket. Includes replacement drain basket to replace damage or missing basket.
DFEARe-flash existing drain in single ply roof. Includes a maximum of nine square feet of replacement or patched membrane, seaming, flashing and sealing.
MISCELLANEOUS TASKS
DGSFInstall new EPDM walkway pad. Includes pads and adhesive, measurement based on actual size.
DHSFInstall new concrete paver walkway. Includes 2-1/2" concrete pavers and slipsheet membrane, measurement based on actual size.
DJLFFabricate & install plumbers vent extension 2-6" diam
DKEARemove and re-install existing ventilator
DLLBRemove and re-install rooftop mounted equipment
DMEAFill pitch pans
DNSFInstall water & ice shield
DPSFInstall synthetic rubberized underlayment; CETCO Strongseal or equal
DQSFInstall #15 felt underlayment, no mopping. Includes fasteners. Quantity based on actual area of roof.
DRSFRemove existing, deteriorated steel roof decking
DSSFInstall new steel roof decking to match existing
DTSFField paint wood or metal surface. Includes surface preparation, priming and painting of new or existing surfaces, to match existing adjacent finished surface, or as directed by Contracting Officer.
DU5 GalSiloxane Masonry Water Repellant
MOBILIZATION AND SERVICE CALLS
DWEALeak service call (Two-man crew, three hours on-site, first $100 in materials). Includes mobilization and three hours on site for a repair crew consisting of a minimum of an experienced roofer and laborer. Perform repair and maintenance as prescribed by Contracting Officer or authorized representative. Log and submit report of time expended, materials used, work completed and additional work recommended. Leak service call Delivery Orders will be placed as either Urgent or Routine. The Contractor shall respond to Urgent service calls within 72 hours, not including Sat, Sun and Federal Holidays; and Routine service calls within 14 calendar days.
DXEAEmergency leak service call. Includes Leak Service Call requirements requested by Contracting Officer to be performed within 24 hours, including weekends and Federal Holidays. The Contractor shall provide telephone contact number(s) for "after hours" Emergency leak service calls. Service calls placed by telephone shall be confirmed to the Contractor in writing the next business day.
DYHRExtended time on site for service call crew, when authorized. Includes additional on site hours for two-man Leak Service Call crew to increase time authorized on a Leak Service Call.
DZEAMobilization of roofing crew, once each per facility, per delivery order. Includes minimum initial mobilization costs for initial crew, to be paid once per each facility, per each Delivery Order, except not to be included on Leak Service Calls.
EAEAMobilization and prep. of asphalt kettle, once each per facility, per delivery order. Includes mobilization, setup, startup, shutdown and demobilization of asphalt kettle to be paid once per each facility where required, per each Delivery Order where required.

&C&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB &R Attachment 27

FA4690-11-B-0101

&C&P OF &N&R