1. Building WD Meade.doc

DOC document 31 KB Posted

Attached to
Roofing Systems IDIQ Federal contract opportunity
Solicitation number
FA4690-11-B-0101
Issued by
Department of the Air Force Air Combat Command

About this file

Building WD Meade

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Systems IDIQ, newest first.
File Type Posted
Amend 1 SF 30.pdf PDF
ROOF IDIQ Bid Shedule.xls XLS spreadsheet
Amend 1 Pre-Proposal Conference.pdf PDF
22. SECTION 09 90 00.rtf RTF text file
28. ROOF IDIQ Bid Shedule.xls XLS spreadsheet
FB4690-11-B-0101 Roofing Solicitation.pdf PDF
20. SECTION 07 61 14.rtf RTF text file
25. Section 01020 - Ellsworth AFB.rtf RTF text file
14. SECTION 07 31 13.rtf RTF text file
4. Pennington Heavy HWY WD.rtf RTF text file
17. SECTION 07 53 23.rtf RTF text file
19. SECTION 07 60 00.rtf RTF text file
6. SECTION 00 TABLE OF CONTENTS.docx DOCX document
2. Building WD Pennington.doc DOC document
18. SECTION 07 54 19.rtf RTF text file
15. SECTION 07 42 13.rtf RTF text file
13. SECTION 07 22 00.rtf RTF text file
10. SECTION 06 10 00.rtf RTF text file
23. SECTION 22 00 00.rtf RTF text file
24. Section 01000 General Requirements(2).rtf RTF text file
7. SECTION 01 33 00.rtf RTF text file
11. SECTION 07 19 00.rtf RTF text file
27. ROOF IDIQ CLINS.xls XLS spreadsheet
12. SECTION 07 21 16.rtf RTF text file
21. SECTION 07 92 00.rtf RTF text file
9. SECTION 05 50 13.rtf RTF text file
8. SECTION 02 41 00.rtf RTF text file
5. Pennington WD Residentual.doc DOC document
16. SECTION 07 51 13.rtf RTF text file
26. SECTION 01800 - Enviromental.rtf RTF text file
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4690-11-B-0101 Attachment 1

General Decision Number: SD100004 03/12/2010 SD4

Superseded General Decision Number: SD20080004

State: South Dakota

Construction Type: Building

Counties: Bennett, Butte, Corson, Custer, Dewey, Fall River, Gregory, Haakon, Harding, Jackson, Jones, Lawrence, Lyman, Meade, Mellette, Perkins, Shannon, Stanley, Todd, Tripp and

Ziebach Counties in South Dakota.

BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including four (4) stories)

Modification Number Publication Date

0 03/12/2010

BOIL0647-006 07/01/2009

Rates Fringes

BOILERMAKER......................$ 33.84 17.83

BRSD0001-003 05/01/2008

JONES & STANLEY (Part) COUNTIES:

Rates Fringes

BRICKLAYER.......................$ 24.60 7.75

BRSD0002-001 05/01/2009

GREGORY, LYMAN & TRIPP COUNTIES:

Rates Fringes

BRICKLAYER.......................$ 31.42 1.73

BRSD0003-002 07/01/2008

CORSON & DEWEY COUNTIES:

Rates Fringes

BRICKLAYER.......................$ 32.00 1.50

BRSD0004-001 05/01/2009

BENNETT, BUTTE, CUSTER, FALL RIVER, HAAKON, HARDING, JACKSON,

LAWRENCE, MEADE, MELLETTE, PERKINS, SHANNON, TODD & ZIEBACH

COUNTIES:

Rates Fringes

BRICKLAYER.......................$ 29.16 2.88

* SFSD0669-001 01/01/2010

Rates Fringes

SPRINKLER FITTER.................$ 27.64 13.60

SHEE0010-018 06/01/2008

Rates Fringes

Sheet Metal Worker (HVAC

WORK, Including Duct Work &

Installation of systems).........$ 18.68 9.37

SUSD2000-001 03/20/2000

Rates Fringes

CARPENTER (Including Form

Building & Metal Stud Work)......$ 10.92 1.67

Cement Mason/Concrete Finisher...$ 10.58 1.68

ELECTRICIAN (Including Low

Voltage Wiring for Fire

Alarms, Sound Systems, Phones

& Computers).....................$ 13.96 1.47

Laborers:

Brick Tender................$ 9.00

Common......................$ 7.74

PAINTER

Brush & Spray...............$ 12.00

PLUMBER (Excluding HVAC Work)....$ 14.02 1.90

Power equipment operators:

Front End Loader............$ 10.42

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .