02_-_SOW_Floors_7008_new_contract.pdf
PDF 291 KB Posted
- Attached to
- Protective Coating ID/IQ
- Solicitation number
- FA4661-19-R-A001
About this file
SOW 7008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawing_9109_with_Dimensions.pdf | ||
| NEW_Seed_Project.pdf | ||
| 02_Drawings_Combined.pdf | ||
| PC_Q&A.pdf | ||
| 04_-_7008_Overall_Building.pdf | ||
| Solicitation_-_FA466119RA001.pdf | ||
| 03_-_7008_Room_Floors.pdf | ||
| Attachment_5_-_Wage_Determination.pdf | ||
| Attachment_1_-_Question_Submission_Form.doc | DOC document | |
| Attachment_6_-_Past_Performance_Information_Document.docx | DOCX document | |
| Solicitation_-_FA466119RA001.pdf | ||
| Attachment_2_-_PPQ.pdf | ||
| Attachment_3_-_Pricing_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_7_-_Subcontractor_Consent_Letter.docx | DOCX document | |
| Attachment_4_-_SOW.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Requestor: Mark Young Date: 18 Jul 2017 Request TO Number: 00XX
Office Symbol: 7CES/CEOES Duty Phone: 6-2757
Contract: Protective Coating Maintenance Contract Number: TBD Contractor: TBD
Work Request Title: Epoxy Coat Floors in Room 501A, Bldg. 7008
Cost: $10,263.05 Facility Number (s): 7008
Work Order Number (s): FP 1003148 (16-0024)
DETAILS OF REQUESTED ITEM:
1. SCOPE: The work covered by this project consists of the Contractor furnishing all layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals necessary to perform all operations as outlined under the TBD Protective Coatings
Maintenance contract.
1.1 Contractor shall apply epoxy coating to the floor in room 105A at Bldg. 7008. Contractor shall grind off all old coating on the floor. Once floor has been prepared and cleaned contractor shall apply one coat of epoxy primer followed by one coat of epoxy paint and a third coat of clear polyurethane to the floor.
The final (urethane) coat shall contain material to make it nonskid. See attached drawings for site location.
Notes
Attachments:
1. Drawings
2. IGE
Quality Assurance Personnel Signature: