02_-_SOW_Floors_7008_new_contract.pdf

PDF 291 KB Posted

Attached to
Protective Coating ID/IQ
Solicitation number
FA4661-19-R-A001
Issued by

About this file

SOW 7008

View the file

Other files

File Type Posted
Drawing_9109_with_Dimensions.pdf PDF
NEW_Seed_Project.pdf PDF
02_Drawings_Combined.pdf PDF
PC_Q&A.pdf PDF
04_-_7008_Overall_Building.pdf PDF
Solicitation_-_FA466119RA001.pdf PDF
03_-_7008_Room_Floors.pdf PDF
Attachment_5_-_Wage_Determination.pdf PDF
Attachment_1_-_Question_Submission_Form.doc DOC document
Attachment_6_-_Past_Performance_Information_Document.docx DOCX document
Solicitation_-_FA466119RA001.pdf PDF
Attachment_2_-_PPQ.pdf PDF
Attachment_3_-_Pricing_Schedule.xlsx XLSX spreadsheet
Attachment_7_-_Subcontractor_Consent_Letter.docx DOCX document
Attachment_4_-_SOW.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Requestor: Mark Young Date: 18 Jul 2017 Request TO Number: 00XX

Office Symbol: 7CES/CEOES Duty Phone: 6-2757

Contract: Protective Coating Maintenance Contract Number: TBD Contractor: TBD

Work Request Title: Epoxy Coat Floors in Room 501A, Bldg. 7008

Cost: $10,263.05 Facility Number (s): 7008

Work Order Number (s): FP 1003148 (16-0024)

DETAILS OF REQUESTED ITEM:

1. SCOPE: The work covered by this project consists of the Contractor furnishing all layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals necessary to perform all operations as outlined under the TBD Protective Coatings

Maintenance contract.

1.1 Contractor shall apply epoxy coating to the floor in room 105A at Bldg. 7008. Contractor shall grind off all old coating on the floor. Once floor has been prepared and cleaned contractor shall apply one coat of epoxy primer followed by one coat of epoxy paint and a third coat of clear polyurethane to the floor.

The final (urethane) coat shall contain material to make it nonskid. See attached drawings for site location.

Notes

Attachments:

1. Drawings

2. IGE

Quality Assurance Personnel Signature:

2017-07-18T07:40:05-0500
YOUNG.MARK.1043982881