- Solicitation number
- FA4659-10-R-0043_Synopsis
About this file
Attachment 3 - Submittal Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004 Due Date Extension.docx | DOCX document | |
| Amendment 0003.rtf | RTF text file | |
| FA4659-10-R-0043-0002.doc | DOC document | |
| FA4659-10-R-0043-0001.doc | DOC document | |
| Atth 1 - Technical Specs.pdf | ||
| Atth 5 - Financial Institution Reference Sheet.doc | DOC document | |
| Atth 6 - Climatological Data.pdf | ||
| Atth 2 - Drawings.pdf | ||
| Solicitation FA4659-10-R-0043.doc | DOC document | |
| 410 RFP Letter.pdf | ||
| Atth 4 - Past Performance Questionnaire.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
JFSD
959922A&B
APPROVED DISAPPROVED
1 Contractor Warranty. Sec. 01000 Para. 3.3 4
2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 4
3 USAF Welding, Cutting or Brazing Permit. Sec. 01000, Para. 4.2 4
4 NDDH Notification of Demolition and Renovation. Sec. 01000, Para. 4.3 4
5 New Air Emission Source Specifications. Sec. 01000, Para. 4.4 4
6 Project Site Plan. Sec. 01000, Para. 7.2.1 4
7 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2 4
8 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3 4
9 Site Superintendent/ Project Manager Designation Letter. Sec. 01000, Para. 10.1.2 4
10 Site Conditions Photographs. Sec. 01000, Para. 12.5 4
11 Critical Path Method (CPM) Network Schedule. Sec. 01000, Para. 12.6.1 4
Schedule Showing Procurement Plans for Materials and Equipment. Sec. 01000, Para.
12.6.2
13 Exterior Utility System Drawings. Sec. 01000, Para. 12.7.1.1 1
14 As-Built Drawings. Sec. 01000, Para. 12.7.1.1 1
15 Real Property Record - Form DD1354. Sec. 01000, Para. 12.9 4
16 Environmental Pollution Control Plans. Sec. 01000, Para. 13.2 4
17 Storm Water Protection Plan. Sec. 01000, Para. 13.3.1 4
18 Waste Disposal Plan. Sec. 01000, Para. 13.6 4
19 Dust Control Plan. Sec. 01000, Para. 13.7 4
20 Radioactive Materials Documentation. Sec. 01000, Para. 13.10 4
21 Spill Control Plan. Sec. 01000, Para. 13.12 4
22 Erosion and Sediment Control Plan. Sec. 01000, Para. 13.13 4
Asbestos Abatement Submittals. Sec. 01000, Para. 13.16 and Spec. Sect. 02 82 14, if used.
24 Contractor Quality Control Plan. Sec. 01000, Para. 14.4 4
25 O & M Manuals. Sec. 01000, Para. 16 3
26 Sec. 01000, Affirmative Procurement Report 4
27 Sec. 01000, Bio-Based Product Report 4
REMARKS
FINAL
APPROVAL
P R
O O
F O
F C
O M
P L
IA
N
C E
TO BE COMPLETED BY PROJECT MANAGER
NO. OF COPIES REQUIRED
S H
O P
D R
A W
IN
G
S
CONTRACTOR
RESUBMITTAL
S A
M P
L E
S
G U
A R
A N
T E
E
S SUBMITTAL
NUMBER
DATE
RECEIVED
CONTRACTING
P R
O C
E D
U R
E S
C E
R T
IF
IC
A T
E
SITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
L
IN
E N
U M
B E
R
T E
S T
D A
T A
M A
N U
F A
C T
U R
IN
G
D A
T A
RETURN
SUSPENSION
DATE
REQUIRED
DATE OF
SUBMISSION
DATE
TO
CIVIL
ENGR.
DATE CONTRACTOR NOTIFIED
CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
BCE ADMIN B410
CONSTRUCT MECHANICAL ROOM AND ADD
HVAC (MC) & REPAIR EXTERIOR, SSM
ROOF, HVAC (R/M)
GRAND FORKS AFB, ND
FA4659-09-D-A003
SCHEDULE OF MATERIAL SUBMITTALS
156-006 01000-1
Attachment 3
959922A&B
APPROVED DISAPPROVED
REMARKS
FINAL
APPROVAL
P R
O O
F O
F C
O M
P L
IA
N
C E
TO BE COMPLETED BY PROJECT MANAGER
NO. OF COPIES REQUIRED
S H
O P
D R
A W
IN
G
S
CONTRACTOR
RESUBMITTAL
S A
M P
L E
S
G U
A R
A N
T E
E
S SUBMITTAL
NUMBER
DATE
RECEIVED
CONTRACTING
P R
O C
E D
U R
E S
C E
R T
IF
IC
A T
E
SITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
L
IN
E N
U M
B E
R
T E
S T
D A
T A
M A
N U
F A
C T
U R
IN
G
D A
T A
RETURN
SUSPENSION
DATE
REQUIRED
DATE OF
SUBMISSION
DATE
TO
CIVIL
ENGR.
DATE CONTRACTOR NOTIFIED
CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
BCE ADMIN B410
CONSTRUCT MECHANICAL ROOM AND ADD
HVAC (MC) & REPAIR EXTERIOR, SSM
ROOF, HVAC (R/M)
GRAND FORKS AFB, ND
FA4659-09-D-A003
SCHEDULE OF MATERIAL SUBMITTALS
1 ASBESTOS REMOVAL AND DISPOSAL 3 4 4 3 3 02 82 14
2 CONCRETE REINFORCEMENT 4 03 20 00
3 CONCRETE MIX DESIGN 4 03 30 00
4 CAST STONE 4 4 3 03 45 00
5 UNIT MASONRY 4 3 04 20 00
6 STRUCTURAL STEEL 4 4 05 10 00
7 STEEL JOISTS 4 4 05 20 00
8 METAL DECKING 4 4 05 30 00
9 METAL FABRICATIONS 4 05 50 00
10 FINISH CARPENTRY 4 4 3 06 20 00
11 MANUFACTURED WALL PANELS 4 4 3 07 42 13
12 MODIFIED BITUMEN ROOFING SYSTEM 4 07 52 00
13 SHEET METAL FLASHING 4 4 3 07 60 00
14 ROOF ACCESSORIES 4 4 07 72 00
15 JOINT SEALERS 4 3 07 92 00
16 METAL DOORS AND FRAMES 4 4 08 11 13
17 ALUMINUM WINDOWS AND FRAMES 3 4 4 3 3 08 11 16
18 HARDWARE 4 4 08 71 00
19 INSULATING GLASS 3 08 81 00
20 ACOUSTIC CEILING TILE AND GRID 4 3 09 51 00
21 RESILIENT FLOORING 4 3 09 65 00
22 CARPET 4 3 3 09 68 00
23 PAINT 4 3 09 90 00
24 FIRE SPRINKLER EQUIPMENT, LAYOUT DRAWINGS AND CALCULATIONS 4 4 21 05 00
25 PLUMBING FIXTURES 4 3 22 40 00
26 HYDRONIC SYSTEMS TREATMENT 4 23 25 00
27 O&M MANUALS 3 23 00 00
28 RECORD DRAWINGS 1 23 00 00
29 PIPE AND PIPE FITTINGS 4 22 05 00/23 05 00
30 VALVES 4 22 05 00/23 05 00
31 PIPING SPECIALTIES 4 22 05 00/23 05 00
32 METERS AND GAUGES 4 22 05 00/23 05 00
33 SUPPORTS AND ANCHORS 4 22 05 00/23 05 00
34 MECHANICAL IDENTIFICATION 4 22 05 00/23 05 00
35 VIBRATION CONTROL 4 22 05 00/23 05 00
156-006 01000-2
959922A&B
APPROVED DISAPPROVED
REMARKS
FINAL
APPROVAL
P R
O O
F O
F C
O M
P L
IA
N
C E
TO BE COMPLETED BY PROJECT MANAGER
NO. OF COPIES REQUIRED
S H
O P
D R
A W
IN
G
S
CONTRACTOR
RESUBMITTAL
S A
M P
L E
S
G U
A R
A N
T E
E
S SUBMITTAL
NUMBER
DATE
RECEIVED
CONTRACTING
P R
O C
E D
U R
E S
C E
R T
IF
IC
A T
E
SITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
L
IN
E N
U M
B E
R
T E
S T
D A
T A
M A
N U
F A
C T
U R
IN
G
D A
T A
RETURN
SUSPENSION
DATE
REQUIRED
DATE OF
SUBMISSION
DATE
TO
CIVIL
ENGR.
DATE CONTRACTOR NOTIFIED
CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
BCE ADMIN B410
CONSTRUCT MECHANICAL ROOM AND ADD
HVAC (MC) & REPAIR EXTERIOR, SSM
ROOF, HVAC (R/M)
GRAND FORKS AFB, ND
FA4659-09-D-A003
SCHEDULE OF MATERIAL SUBMITTALS
36 INSULATION 4 22 07 00/23 07 00
37 TEST & BALANCE REPORT 3 23 05 93
38 VARIABLE FREQUENCY DRIVES 4 23 09 15
39 VFD'S FIELD REPORT/PARAMETERS AND SETTINGS 3 23 09 15
40 CONTROLS (ELECTRIC) 4 23 09 05
41 PUMPS 4 23 20 00
42 HYDRONIC SPECIALTIES 4 23 21 13
43 DUCTWORK LAYOUT SHOP DRAWINGS 4 23 30 00
44 FILTERS 4 23 30 00
45 SMOKE DAMPERS 4 23 30 00
46 FIRE DAMPERS 4 23 30 00
47 DIFFUSERS, REGISTERS & GRILLES 4 23 30 00
48 LOUVERS 4 23 30 00
49 TERMINAL BOXES 4 23 30 00
50 SOUND ATTENTUATORS 4 23 33 00
51 FANS 4 23 34 00
52 AIR HANDLER 4 23 73 13
53 DUCTLESS SPLIT SYSTEMS 4 23 81 26
54 FINTUBE RADIATION 4 23 82 00
55 UNIT HEATERS 4 23 82 00
56 COILS 4 23 82 00
57 HUMIDIFIERS 4 23 84 13
58 CENTRAL BATTERY EQUIPMENT 4 26 09 23
59 PANELBOARDS 4 26 24 16
60 WIRING DEVICES - SWITCHES 4 26 27 26
61 LIGHTING FIXTURES 4 26 51 13
62 CIRCUIT AND MOTOR DISCONNECTS 4 26 28 16
63 TELECOMMUNICATION CABLING SYSTEM 4 27 10 10
64 FIRE ALARM SYSTEM 4 4 28 31 10
65 CONCRETE MIX DESIGN 4 32 16 13
66 ASPHALTIC CONCRETE PAVING MIX DESIGN 4 32 16 13
67 LANDSCAPING 3 32 93 00
Y\156_006\DOCUMENTS\SPECS\01000 PART 2.xls
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
156-006 01000-3