Attachment 3 - Submittal Schedule

View the file

Other files

File Type Posted
Amendment 0004 Due Date Extension.docx DOCX document
Amendment 0003.rtf RTF text file
FA4659-10-R-0043-0002.doc DOC document
FA4659-10-R-0043-0001.doc DOC document
Atth 1 - Technical Specs.pdf PDF
Atth 5 - Financial Institution Reference Sheet.doc DOC document
Atth 6 - Climatological Data.pdf PDF
Atth 2 - Drawings.pdf PDF
Solicitation FA4659-10-R-0043.doc DOC document
410 RFP Letter.pdf PDF
Atth 4 - Past Performance Questionnaire.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

JFSD

959922A&B

APPROVED DISAPPROVED

1 Contractor Warranty. Sec. 01000 Para. 3.3 4

2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 4

3 USAF Welding, Cutting or Brazing Permit. Sec. 01000, Para. 4.2 4

4 NDDH Notification of Demolition and Renovation. Sec. 01000, Para. 4.3 4

5 New Air Emission Source Specifications. Sec. 01000, Para. 4.4 4

6 Project Site Plan. Sec. 01000, Para. 7.2.1 4

7 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2 4

8 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3 4

9 Site Superintendent/ Project Manager Designation Letter. Sec. 01000, Para. 10.1.2 4

10 Site Conditions Photographs. Sec. 01000, Para. 12.5 4

11 Critical Path Method (CPM) Network Schedule. Sec. 01000, Para. 12.6.1 4

Schedule Showing Procurement Plans for Materials and Equipment. Sec. 01000, Para.

12.6.2

13 Exterior Utility System Drawings. Sec. 01000, Para. 12.7.1.1 1

14 As-Built Drawings. Sec. 01000, Para. 12.7.1.1 1

15 Real Property Record - Form DD1354. Sec. 01000, Para. 12.9 4

16 Environmental Pollution Control Plans. Sec. 01000, Para. 13.2 4

17 Storm Water Protection Plan. Sec. 01000, Para. 13.3.1 4

18 Waste Disposal Plan. Sec. 01000, Para. 13.6 4

19 Dust Control Plan. Sec. 01000, Para. 13.7 4

20 Radioactive Materials Documentation. Sec. 01000, Para. 13.10 4

21 Spill Control Plan. Sec. 01000, Para. 13.12 4

22 Erosion and Sediment Control Plan. Sec. 01000, Para. 13.13 4

Asbestos Abatement Submittals. Sec. 01000, Para. 13.16 and Spec. Sect. 02 82 14, if used.

24 Contractor Quality Control Plan. Sec. 01000, Para. 14.4 4

25 O & M Manuals. Sec. 01000, Para. 16 3

26 Sec. 01000, Affirmative Procurement Report 4

27 Sec. 01000, Bio-Based Product Report 4

REMARKS

FINAL

APPROVAL

P R

O O

F O

F C

O M

P L

IA

N

C E

TO BE COMPLETED BY PROJECT MANAGER

NO. OF COPIES REQUIRED

S H

O P

D R

A W

IN

G

S

CONTRACTOR

RESUBMITTAL

S A

M P

L E

S

G U

A R

A N

T E

E

S SUBMITTAL

NUMBER

DATE

RECEIVED

CONTRACTING

P R

O C

E D

U R

E S

C E

R T

IF

IC

A T

E

SITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

L

IN

E N

U M

B E

R

T E

S T

D A

T A

M A

N U

F A

C T

U R

IN

G

D A

T A

RETURN

SUSPENSION

DATE

REQUIRED

DATE OF

SUBMISSION

DATE

TO

CIVIL

ENGR.

DATE CONTRACTOR NOTIFIED

CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

BCE ADMIN B410

CONSTRUCT MECHANICAL ROOM AND ADD

HVAC (MC) & REPAIR EXTERIOR, SSM

ROOF, HVAC (R/M)

GRAND FORKS AFB, ND

FA4659-09-D-A003

SCHEDULE OF MATERIAL SUBMITTALS

156-006 01000-1

Attachment 3

959922A&B

APPROVED DISAPPROVED

REMARKS

FINAL

APPROVAL

P R

O O

F O

F C

O M

P L

IA

N

C E

TO BE COMPLETED BY PROJECT MANAGER

NO. OF COPIES REQUIRED

S H

O P

D R

A W

IN

G

S

CONTRACTOR

RESUBMITTAL

S A

M P

L E

S

G U

A R

A N

T E

E

S SUBMITTAL

NUMBER

DATE

RECEIVED

CONTRACTING

P R

O C

E D

U R

E S

C E

R T

IF

IC

A T

E

SITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

L

IN

E N

U M

B E

R

T E

S T

D A

T A

M A

N U

F A

C T

U R

IN

G

D A

T A

RETURN

SUSPENSION

DATE

REQUIRED

DATE OF

SUBMISSION

DATE

TO

CIVIL

ENGR.

DATE CONTRACTOR NOTIFIED

CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

BCE ADMIN B410

CONSTRUCT MECHANICAL ROOM AND ADD

HVAC (MC) & REPAIR EXTERIOR, SSM

ROOF, HVAC (R/M)

GRAND FORKS AFB, ND

FA4659-09-D-A003

SCHEDULE OF MATERIAL SUBMITTALS

1 ASBESTOS REMOVAL AND DISPOSAL 3 4 4 3 3 02 82 14

2 CONCRETE REINFORCEMENT 4 03 20 00

3 CONCRETE MIX DESIGN 4 03 30 00

4 CAST STONE 4 4 3 03 45 00

5 UNIT MASONRY 4 3 04 20 00

6 STRUCTURAL STEEL 4 4 05 10 00

7 STEEL JOISTS 4 4 05 20 00

8 METAL DECKING 4 4 05 30 00

9 METAL FABRICATIONS 4 05 50 00

10 FINISH CARPENTRY 4 4 3 06 20 00

11 MANUFACTURED WALL PANELS 4 4 3 07 42 13

12 MODIFIED BITUMEN ROOFING SYSTEM 4 07 52 00

13 SHEET METAL FLASHING 4 4 3 07 60 00

14 ROOF ACCESSORIES 4 4 07 72 00

15 JOINT SEALERS 4 3 07 92 00

16 METAL DOORS AND FRAMES 4 4 08 11 13

17 ALUMINUM WINDOWS AND FRAMES 3 4 4 3 3 08 11 16

18 HARDWARE 4 4 08 71 00

19 INSULATING GLASS 3 08 81 00

20 ACOUSTIC CEILING TILE AND GRID 4 3 09 51 00

21 RESILIENT FLOORING 4 3 09 65 00

22 CARPET 4 3 3 09 68 00

23 PAINT 4 3 09 90 00

24 FIRE SPRINKLER EQUIPMENT, LAYOUT DRAWINGS AND CALCULATIONS 4 4 21 05 00

25 PLUMBING FIXTURES 4 3 22 40 00

26 HYDRONIC SYSTEMS TREATMENT 4 23 25 00

27 O&M MANUALS 3 23 00 00

28 RECORD DRAWINGS 1 23 00 00

29 PIPE AND PIPE FITTINGS 4 22 05 00/23 05 00

30 VALVES 4 22 05 00/23 05 00

31 PIPING SPECIALTIES 4 22 05 00/23 05 00

32 METERS AND GAUGES 4 22 05 00/23 05 00

33 SUPPORTS AND ANCHORS 4 22 05 00/23 05 00

34 MECHANICAL IDENTIFICATION 4 22 05 00/23 05 00

35 VIBRATION CONTROL 4 22 05 00/23 05 00

156-006 01000-2

959922A&B

APPROVED DISAPPROVED

REMARKS

FINAL

APPROVAL

P R

O O

F O

F C

O M

P L

IA

N

C E

TO BE COMPLETED BY PROJECT MANAGER

NO. OF COPIES REQUIRED

S H

O P

D R

A W

IN

G

S

CONTRACTOR

RESUBMITTAL

S A

M P

L E

S

G U

A R

A N

T E

E

S SUBMITTAL

NUMBER

DATE

RECEIVED

CONTRACTING

P R

O C

E D

U R

E S

C E

R T

IF

IC

A T

E

SITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

L

IN

E N

U M

B E

R

T E

S T

D A

T A

M A

N U

F A

C T

U R

IN

G

D A

T A

RETURN

SUSPENSION

DATE

REQUIRED

DATE OF

SUBMISSION

DATE

TO

CIVIL

ENGR.

DATE CONTRACTOR NOTIFIED

CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

BCE ADMIN B410

CONSTRUCT MECHANICAL ROOM AND ADD

HVAC (MC) & REPAIR EXTERIOR, SSM

ROOF, HVAC (R/M)

GRAND FORKS AFB, ND

FA4659-09-D-A003

SCHEDULE OF MATERIAL SUBMITTALS

36 INSULATION 4 22 07 00/23 07 00

37 TEST & BALANCE REPORT 3 23 05 93

38 VARIABLE FREQUENCY DRIVES 4 23 09 15

39 VFD'S FIELD REPORT/PARAMETERS AND SETTINGS 3 23 09 15

40 CONTROLS (ELECTRIC) 4 23 09 05

41 PUMPS 4 23 20 00

42 HYDRONIC SPECIALTIES 4 23 21 13

43 DUCTWORK LAYOUT SHOP DRAWINGS 4 23 30 00

44 FILTERS 4 23 30 00

45 SMOKE DAMPERS 4 23 30 00

46 FIRE DAMPERS 4 23 30 00

47 DIFFUSERS, REGISTERS & GRILLES 4 23 30 00

48 LOUVERS 4 23 30 00

49 TERMINAL BOXES 4 23 30 00

50 SOUND ATTENTUATORS 4 23 33 00

51 FANS 4 23 34 00

52 AIR HANDLER 4 23 73 13

53 DUCTLESS SPLIT SYSTEMS 4 23 81 26

54 FINTUBE RADIATION 4 23 82 00

55 UNIT HEATERS 4 23 82 00

56 COILS 4 23 82 00

57 HUMIDIFIERS 4 23 84 13

58 CENTRAL BATTERY EQUIPMENT 4 26 09 23

59 PANELBOARDS 4 26 24 16

60 WIRING DEVICES - SWITCHES 4 26 27 26

61 LIGHTING FIXTURES 4 26 51 13

62 CIRCUIT AND MOTOR DISCONNECTS 4 26 28 16

63 TELECOMMUNICATION CABLING SYSTEM 4 27 10 10

64 FIRE ALARM SYSTEM 4 4 28 31 10

65 CONCRETE MIX DESIGN 4 32 16 13

66 ASPHALTIC CONCRETE PAVING MIX DESIGN 4 32 16 13

67 LANDSCAPING 3 32 93 00

Y\156_006\DOCUMENTS\SPECS\01000 PART 2.xls

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

156-006 01000-3