Attach_2_Submittal_Schedule_High_Bay_Lighting.xls
XLS spreadsheet 44 KB Posted
- Attached to
- High Bay Lighting Federal contract opportunity
- Solicitation number
- FA4626-17-R-0003
About this file
Attachment 2 Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_updated.docx | DOCX document | |
| New_Drawing_PDFs.zip | ZIP file | |
| Questions.docx | DOCX document | |
| SOW_High_Bay_Lighting_FY17.docx | DOCX document | |
| 01_00_00_General_Requirements_High_Bay.doc | DOC document | |
| Amendment_003.docx | DOCX document | |
| Photos.zip | ZIP file | |
| FA462617R0003U0002.pdf | ||
| Site_Visit.pdf | ||
| FA462617R0003U0001.pdf | ||
| 01_00_00_General_Requirements_High_Bay.doc | DOC document | |
| Q&A.docx | DOCX document | |
| Q&A.docx | DOCX document | |
| Attach_6_Installation_Perimeter_Access.pdf | ||
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attach_4_Drawings.zip | ZIP file | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_3_Schedule_of_Drawings.doc | DOC document | |
| Attch_9_Subcontractor_Consent.doc | DOC document | |
| Attach_5_Wage_Determination.docx | DOCX document | |
| Attach_1_Specifications.zip | ZIP file | |
| FA462617R0003.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 16-0033 | Repair High Bay Lighting | FA4626-17-R-0003 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | Start of Work Notification - 01 00 00 3.11 | 1 | 5 PTSW | ||||||||||||||||||
| 2 | Entry Authorization Letter - 01 00 01 1.1 | 1 | 30 PTSW | ||||||||||||||||||
| 3 | Quality Control Plan - 01 00 00 3.18 | 3 | PTSW | ||||||||||||||||||
| 4 | Contractor personnel licensing - 01 00 00 1.3 | 3 | PTSW | ||||||||||||||||||
| 5 | Replacement induction fixtures - 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 6 | Replacement 24W LED fixtures - 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 7 | Replacement 90W LED fixtures - 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 8 | Replacement 2'x2' LED lay in fixtures - 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 9 | Replacement 2' x 4' lay in fixtures - 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 10 | Replacement T5 HO 4' fixture, 2 bulb, 120 V - 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 11 | Replacement T5 HO 4' fixture, 4 bulb, 120 V - 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 12 | Replacement T5 HO 4' fixture, metal cage cover, 2 bulb, 120 V - 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 13 | Replacement T5 HO 4' fixture, moisture resistant, 2 bulb, 120 V - 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 14 | Replacement T5 HO 4' fixture, emergency light, 2 bulb, 120 V- 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 15 | Replacement T5 HO 4' fixture, moisture resistant, emergency light, 2 bulb, 120 V- 01 00 00 2 | 3 | PTSW | ||||||||||||||||||
| 16 | Notice of Final Inspection - 01 00 00 - 3.12 | 1 | 7 PTFI | ||||||||||||||||||
| 17 | |||||||||||||||||||||
| 18 | |||||||||||||||||||||
| 19 | |||||||||||||||||||||
| 20 | |||||||||||||||||||||
| 21 | |||||||||||||||||||||
| 22 | |||||||||||||||||||||
| 23 | |||||||||||||||||||||
| 24 | |||||||||||||||||||||
| 25 | |||||||||||||||||||||
| 26 | |||||||||||||||||||||
| 27 | |||||||||||||||||||||
| 28 | |||||||||||||||||||||
| 29 | |||||||||||||||||||||
| 30 | |||||||||||||||||||||
| 31 | |||||||||||||||||||||
| 32 | |||||||||||||||||||||
| 33 | |||||||||||||||||||||
| 34 | |||||||||||||||||||||
| 35 | |||||||||||||||||||||
| 36 | |||||||||||||||||||||
| 37 | |||||||||||||||||||||
| 38 | |||||||||||||||||||||
| 39 | |||||||||||||||||||||
| 40 | |||||||||||||||||||||
| 41 | |||||||||||||||||||||
| 42 | |||||||||||||||||||||
| 43 | |||||||||||||||||||||
| 44 | |||||||||||||||||||||
| 45 | |||||||||||||||||||||
| 46 | |||||||||||||||||||||
| 47 | |||||||||||||||||||||
| 48 | |||||||||||||||||||||
| 49 | |||||||||||||||||||||
| 50 | |||||||||||||||||||||
| 51 | |||||||||||||||||||||
| 52 | |||||||||||||||||||||
| 53 | |||||||||||||||||||||
| 54 | |||||||||||||||||||||
| 55 | |||||||||||||||||||||
| 56 | |||||||||||||||||||||
| 57 | |||||||||||||||||||||
| Schedule of Abbreviations: | |||||||||||||||||||||
| AWC | = After Work Completed | BMD | = | Before Material Delivery | |||||||||||||||||
| PTSW | = Prior to Starting Work | AN | = | Advance Notification | |||||||||||||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| PTFA | = Prior to Final Acceptance | PTSA | = | Prior To Start of Action | |||||||||||||||||
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
&L&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA&R&"Times New Roman,Regular"&12FA4626 17 R 0003 Attachment 2 &L&"Times New Roman,Regular"&12AF Form 66 &F-&D&C&"Times New Roman,Regular"&12
REQUIRED TECHNICAL SUBMITTALS
File details come from the government source that posted it. Updated .