Submittal Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| Pre-Proposal_Conference_MAF_Elevator_Doors_15_June_2016.pdf | ||
| Pictures_MAF_Elevator_Doors.pdf | ||
| Amendment_1.pdf | ||
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attach_6_Base_Entry.pdf | ||
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Spec's_Cover_sheet.doc | DOC document | |
| Attachment_4 _Drawings.pdf | ||
| Attch_9_-_Subcontractor_Consent_Form_-_10R0027.doc | DOC document | |
| Attachment_3 _Schedule_of_Drawings.doc | DOC document | |
| Attachment_1 _Specifications.pdf | ||
| RFP.pdf | ||
| Attachment_5_Wage_Determinations.docx | DOCX document | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 16-6002 | REPAIR MAF ELEVATOR DOORS | FA4626-16-R-0008 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||||||
| 1 | 01 00 00 - 3.5.2 - Red Lines | 4 | PTFI | ||||||||||||||||||
| 2 | 01 00 00 - 3.5.2 - As Built Field Data | 2 | 3 PTFI | ||||||||||||||||||
| 3 | 01 00 00 - 3.8.1 - Contractor Furnished Equipment List | 4 | 3 PTFA | ||||||||||||||||||
| 4 | 01 00 00 - 3.8.2 - Guarantees | 4 | 10 PTFA | ||||||||||||||||||
| 5 | 01 00 00 - 3.10 - Shop Drawings as Required by Technical Specifications | 4 | 10 PTSA | ||||||||||||||||||
| 6 | 01 00 00 - 3.11 - Start of Work Notification | 1 | 5 PTSW | ||||||||||||||||||
| 7 | 01 00 00 - 3.12 - Notice of Final Inspection | 1 | 5 PTFI | ||||||||||||||||||
| 8 | 01 00 00 - 3.13 Construction Near Utility Systems (AF Form 103) | 1 | 7 PTSA | ||||||||||||||||||
| 9 | 01 00 00 - 3.14 - Utility Outage Notices | 1 | 14 PTO | ||||||||||||||||||
| 10 | 01 00 00 - 3.18.2 - Quality Control Plan | 4 | 20 ANTP | ||||||||||||||||||
| 11 | 01 00 00 - 3.18.4 - Quality Control Records | 1 | EWD | ||||||||||||||||||
| 12 | 01 00 00 - 3.20 - 1354 Checklist (Property Inventory Checklist) each site or facility | 4 | PTFI | ||||||||||||||||||
| 13 | 01 32 01 - 3.19 - Progress Schedule (AF form 3064) | 4 | 5 PTSW | Progress Schedule submitted weekly after first submittal; Progress Reports submitted at the 1st of the month or at completion. | |||||||||||||||||
| 14 | 01 36 00 - 1.2 - Demolition Activities Notification | 4 | PTSW | ||||||||||||||||||
| 15 | 01 36 00 - 1.11.3 - Hazardous Materials Report EESOH-MIS 3952 | 4 | PTSW | ||||||||||||||||||
| 16 | 01 36 00 - 11.3 - Monthly Report of Solid Waste Disposal and Diversion | 4 | Monthly | ||||||||||||||||||
| 17 | 01 36 00 - 1.12.4 - Recovered Materials Written Determination | 4 | Monthly | ||||||||||||||||||
| 18 | 01 36 00 - 1.12.5 - Recycled Material Use Report | 4 | PTSW | ||||||||||||||||||
| DIVISION 02 -SELECTIVE DEMOLITION | |||||||||||||||||||||
| 19 | 02 07 00 - 1.3 - Detailed Work Plan | 4 | 5 PTSW | ||||||||||||||||||
| DIVISION 05 -METALS | |||||||||||||||||||||
| 20 | 05 05 33 - 3.1.1 Qualifications - Welding Procedure Specifications | 4 | PTSW | ||||||||||||||||||
| 21 | 05 05 33 - 3.5 Performance Qualification of Welders and Welding Operators | 4 | PTSW | ||||||||||||||||||
| 22 | 05 05 33 - 3.5.1 Welding Certification | 4 | PTSW | ||||||||||||||||||
| 23 | 05 05 33 - 3.5.3 Welder's Record | 4 | PTSW | ||||||||||||||||||
| 24 | 05 50 00 - 1.4.A.1 - Shop Drawings | 5 | PTSW | ||||||||||||||||||
| 25 | 05 50 00 - 1.5.A - Paint Compatibility Certificates | 5 | 5 | PTSW | |||||||||||||||||
| DIVISION 09 - FINISHES | |||||||||||||||||||||
| 26 | 09 91 23 - 1.5.A Interior Painting - Product Data (paint, primer) | 4 | 20 D ANTP | ||||||||||||||||||
| 27 | 09 91 23 - 1.5.B Interior Painting - Samples for Initial Selection | 4 | 20 D ANTP | ||||||||||||||||||
| 28 | 09 91 23 - 1.5.C Interior Painting - Product List | 4 | 20 D ANTP | ||||||||||||||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||||||
| 29 | 10 22 10 - 1.4.A Collapsible Gates - Product Data (gate assembly, track, light curtain) | 4 | 20 D ANTP | ||||||||||||||||||
| 30 | 10 22 10 - 1.4.B Collapsible Gates - Shop Drawings | 4 | 20 D ANTP | ||||||||||||||||||
| 31 | 10 22 10 - 1.4.C Collapsible Gates - Samples for Initial Selection | 2 | 20 D ANTP | ||||||||||||||||||
| 32 | 10 22 10 - 1.5.A Collapsible Gates - Coordination Drawings | 4 | 20 D ANTP | ||||||||||||||||||
| 33 | 10 22 10 - 1.5.B Collapsible Gates - Product Certificates | 4 | 20 D ANTP | ||||||||||||||||||
| 34 | 10 22 10 - 1.5.C Collapsible Gates - Field Quality Control Reports | 1 | 20 D ANTP | Weekly reports. | |||||||||||||||||
| 35 | 10 22 10 - 1.5.D Collapsible Gates - Sample of special warranty | 4 | 20 D ANTP | ||||||||||||||||||
| Division 14 - Conveying Equipment | |||||||||||||||||||||
| 36 | 14 20 00 - 1.3.A Elevator Controls - Modified Control Schematics | 4 | 4 | 20 D ANTP | |||||||||||||||||
| 37 | 14 20 00 – 1.3.B Elevator Controls - Control Devices | 4 | 4 | 4 | 20 D ANTP | ||||||||||||||||
| 38 | 14 22 00 - 1.3.A Elevator Maintenance and Repairs | 4 | 4 | 20 D ANTP | |||||||||||||||||
| DIVISION 26 - ELECTRICAL | |||||||||||||||||||||
| 39 | 26 05 19 - 1.3 Low-Voltage Electrical Power Conductors and Cables | 4 | 20 D ANTP | ||||||||||||||||||
| 40 | 26 05 33 - 1.3 Raceway and Boxes for Electrical Systems | 4 | 20 D ANTP | ||||||||||||||||||
| 41 | 26 27 26 - 1.3 Wiring Devices | 4 | 4 | 4 | 20 D ANTP | ||||||||||||||||
| 42 | 26 28 00 - 1.3 Low-Voltage Circuit Protective Devices | 4 | 4 | 4 | 20 D ANTP | ||||||||||||||||
| 43 | 26 51 13 - 1.3 Interior Lighting Fixtures, Lamps, and Ballasts | 4 | 4 | 4 | 20 D ANTP | ||||||||||||||||
| Schedule of Abbreviations: | |||||||||||||||||||||
| AWC | = After Work Completed | BMF | = | Before Material Delivery | |||||||||||||||||
| PTSW | = Prior to Starting Work | SN | = | Advance Notification | |||||||||||||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| PTFA | = Prior to Final Acceptance | PTSA | = | Prior To Start of Action | |||||||||||||||||
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
Page &P&R&F &L&"Times New Roman,Regular"&12AF Form 66 &F-&D&C&"Times New Roman,Regular"&12 01330a-&P
REQUIRED TECHNICAL SUBMITTALS
File details come from the government source that posted it. Updated .