Submittal Schedule

View the file

Other files

File Type Posted
Amendment_2.pdf PDF
Pre-Proposal_Conference_MAF_Elevator_Doors_15_June_2016.pdf PDF
Pictures_MAF_Elevator_Doors.pdf PDF
Amendment_1.pdf PDF
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attach_6_Base_Entry.pdf PDF
Attch_8_Past_Performance_Questionaire.docx DOCX document
Spec's_Cover_sheet.doc DOC document
Attachment_4 _Drawings.pdf PDF
Attch_9_-_Subcontractor_Consent_Form_-_10R0027.doc DOC document
Attachment_3 _Schedule_of_Drawings.doc DOC document
Attachment_1 _Specifications.pdf PDF
RFP.pdf PDF
Attachment_5_Wage_Determinations.docx DOCX document
Attach_7_Special_Contract_Requirements.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 16-6002REPAIR MAF ELEVATOR DOORSFA4626-16-R-0008
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 01 - GENERAL REQUIREMENTS
101 00 00 - 3.5.2 - Red Lines4PTFI
201 00 00 - 3.5.2 - As Built Field Data23 PTFI
301 00 00 - 3.8.1 - Contractor Furnished Equipment List43 PTFA
401 00 00 - 3.8.2 - Guarantees410 PTFA
501 00 00 - 3.10 - Shop Drawings as Required by Technical Specifications410 PTSA
601 00 00 - 3.11 - Start of Work Notification15 PTSW
701 00 00 - 3.12 - Notice of Final Inspection15 PTFI
801 00 00 - 3.13 Construction Near Utility Systems (AF Form 103)17 PTSA
901 00 00 - 3.14 - Utility Outage Notices114 PTO
1001 00 00 - 3.18.2 - Quality Control Plan420 ANTP
1101 00 00 - 3.18.4 - Quality Control Records1EWD
1201 00 00 - 3.20 - 1354 Checklist (Property Inventory Checklist) each site or facility4PTFI
1301 32 01 - 3.19 - Progress Schedule (AF form 3064)45 PTSWProgress Schedule submitted weekly after first submittal; Progress Reports submitted at the 1st of the month or at completion.
1401 36 00 - 1.2 - Demolition Activities Notification4PTSW
1501 36 00 - 1.11.3 - Hazardous Materials Report EESOH-MIS 39524PTSW
1601 36 00 - 11.3 - Monthly Report of Solid Waste Disposal and Diversion4Monthly
1701 36 00 - 1.12.4 - Recovered Materials Written Determination4Monthly
1801 36 00 - 1.12.5 - Recycled Material Use Report4PTSW
DIVISION 02 -SELECTIVE DEMOLITION
1902 07 00 - 1.3 - Detailed Work Plan45 PTSW
DIVISION 05 -METALS
2005 05 33 - 3.1.1 Qualifications - Welding Procedure Specifications4PTSW
2105 05 33 - 3.5 Performance Qualification of Welders and Welding Operators4PTSW
2205 05 33 - 3.5.1 Welding Certification4PTSW
2305 05 33 - 3.5.3 Welder's Record4PTSW
2405 50 00 - 1.4.A.1 - Shop Drawings5PTSW
2505 50 00 - 1.5.A - Paint Compatibility Certificates55PTSW
DIVISION 09 - FINISHES
2609 91 23 - 1.5.A Interior Painting - Product Data (paint, primer)420 D ANTP
2709 91 23 - 1.5.B Interior Painting - Samples for Initial Selection420 D ANTP
2809 91 23 - 1.5.C Interior Painting - Product List420 D ANTP
DIVISION 10 - SPECIALTIES
2910 22 10 - 1.4.A Collapsible Gates - Product Data (gate assembly, track, light curtain)420 D ANTP
3010 22 10 - 1.4.B Collapsible Gates - Shop Drawings420 D ANTP
3110 22 10 - 1.4.C Collapsible Gates - Samples for Initial Selection220 D ANTP
3210 22 10 - 1.5.A Collapsible Gates - Coordination Drawings420 D ANTP
3310 22 10 - 1.5.B Collapsible Gates - Product Certificates420 D ANTP
3410 22 10 - 1.5.C Collapsible Gates - Field Quality Control Reports120 D ANTPWeekly reports.
3510 22 10 - 1.5.D Collapsible Gates - Sample of special warranty420 D ANTP
Division 14 - Conveying Equipment
3614 20 00 - 1.3.A Elevator Controls - Modified Control Schematics4420 D ANTP
3714 20 00 – 1.3.B Elevator Controls - Control Devices44420 D ANTP
3814 22 00 - 1.3.A Elevator Maintenance and Repairs4420 D ANTP
DIVISION 26 - ELECTRICAL
3926 05 19 - 1.3 Low-Voltage Electrical Power Conductors and Cables420 D ANTP
4026 05 33 - 1.3 Raceway and Boxes for Electrical Systems420 D ANTP
4126 27 26 - 1.3 Wiring Devices44420 D ANTP
4226 28 00 - 1.3 Low-Voltage Circuit Protective Devices44420 D ANTP
4326 51 13 - 1.3 Interior Lighting Fixtures, Lamps, and Ballasts44420 D ANTP
Schedule of Abbreviations:
AWC= After Work CompletedBMF=Before Material Delivery
PTSW= Prior to Starting WorkSN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNT= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePTSA=Prior To Start of Action
ACA= After Contract AwardPSS=Per Submittal Schedule