Questions_Answers_1.docx

DOCX document 15 KB Posted

Attached to
Repair Building 1840 Federal contract opportunity
Solicitation number
FA4626-15-R-0015
Issued by
Department of the Air Force Global Strike Command

About this file

Submitted Questions with answers as of 24 Aug 2015

View the file

Other files for this federal contract opportunity

Other files attached to Repair Building 1840, newest first.
File Type Posted
L-1_PPT_Clarification.docx DOCX document
260563_-_Low-Voltage_Electrical_Demolition_and_Remodel.docx DOCX document
Amendment_005.doc DOC document
Questions_Answers_1.docx DOCX document
233400.pdf PDF
Amendment_4.doc DOC document
01000.pdf PDF
Amendment_03.doc DOC document
096516_FL_-_RESILIENT_SHEET_FLOORING.pdf PDF
Questions_Answers_1.docx DOCX document
Control_Number.docx DOCX document
1840__SECONDARY_SITE_VISIT.docx DOCX document
1840_Sign_In.pdf PDF
Amendment_02.doc DOC document
Amendment_01.doc DOC document
Solicitation.doc DOC document
Attachment_3_Schedule_of_Drawings.docx DOCX document
Attachment_1_Specifications.pdf PDF
Attch_8_Subcontractor_Consent_Form.doc DOC document
Attach_6_Base_Entry_Policy_Letter.pdf PDF
Attachment_2_Submittal_Schedule.xls XLS spreadsheet
Attach_4_Drawings_(information).docx DOCX document
Attach_5-1_Wage_Determination-Building_(1).docx DOCX document
Attach_5-2_Wage_Determination-Heavy.docx DOCX document
Attch_9_Past_Performance_Questionnaire.docx DOCX document
Attach_7_Past_Performance_Attachment.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4626-15-R-0015

Repair Building 1840 Submitted Questions – Answers As of 25 Aug 2015

1. I was looking into the proposal section of this project and had a question for you on section “3.2.3 FACTOR 2 – Offeror Experience/Management Plan”. How much does this sections come into awarding the project? If we don’t meet each of these sub-factors will our bid be rejected or are you using some sort of modifier?

There is no modifier used during the technical or past performance evaluation, offeror’s proposals MUST meet all specified requirements. Proposal must contain the information requested whether it is the prime or subcontractor who has the experience. If submitting on a subcontractor, that subcontractor must perform the work. If the proposal submitted (Prime or Subcontractor) does not meet the requirement, then the proposal is rated technically unacceptable and removed from further consideration for award.

2. SUBFACTOR 1: Do these projects have to be complete? It implies completed, but doesn’t specify. We only have completed 2 projects over $3.5 million in your specified time frame, but we are currently working on a $5.6 million here in town that could be number 3. We have done a number of larger projects just not in the specified time frame.

Projects that are "in progress" will count; the main catch is that they are at least 80 percent completed. Reference L-1-PPT; 4.0 Volume II Past Performance 4.3.

3. SUBFACTOR 2: Honestly we have zero of these projects. We have bid them in the past, but haven’t been the successful bidder. There also have not been many of these projects in Montana, and this will probably disqualify a couple Primes. On a side note as this project is largely subcontractor based wouldn’t it be more important if the subcontractor has this experience under Factor 1?

For Subfactor 2: It is important to submit the experience data on the company that will actually perform the work, be it prime or subcontractor.

4. Page 39 of 48, 3.0 Volume 1 – Technical Volume: For factors 1, 2, and subfactors, will affiliated company experience (parent company or sister company) experience be acceptable?

When reviewing experience being used for affiliated companies by a prime contractor submitting a proposal the main concern is "who" has the experience. If you plan on using those with the experience in the affiliated company to perform the work the experience is acceptable, however, if you are just using the affiliated company to show that the company "as a whole" has conducted work within the factor or sub-factor and have no plan to use those with the experience it is unacceptable. The main focus is that the actual company or individuals with the experience are being used to accomplish the requirement.

File details come from the government source that posted it. Updated .