The file's text, extracted by GovTribe without its formatting.
Attachment 3 REPAIR BUILDING 1840 & CONSTRUCT FLAMMABLE LIQUIDS STORAGE, WSA NZAS 09-1004 MALMSTROM AFB, MT. FA4626-15-R-0005
SCHEDULE OF DRAWINGS
SD-1
REPAIR BUILDING 1840 & CONSTRUCT FLAMMABLE LIQUID STORAGE WSA
NZAS 09-1004 MALMSTROM AIR FORCE BASE, MONTANA
FA4626-15-R-0005
SCHEDULE OF DRAWINGS
DRAWINGS
| COV |
| COVER SHEET |
| . |
| 1 of 61 |
CIVIL
| C1.0 C1.1 |
| SITE PLAN & DETAILS |
PHASE ENTRANCE/EXIT ROUTES
ARCHITECTURAL
A0.0 ARCHITECTURAL SITE PLAN & FLAMMABLE LIQUID STORAGE BUILDING 4 of 61
| A1.0 |
| DOOR, FRAME & WALL TYPES & SCHEDULES |
| . |
| 5 of 61 |
| A2.0 |
| DEMOLITION FLOOR PLAN |
| . |
| 6 of 61 |
| A2.1 |
| DEMOLITION CEILING PLAN |
| . |
| 7 of 61 |
| A2.2 |
| REMODEL FLOOR PLAN |
| . |
| 8 of 61 |
| A2.3 |
| FINISH PLAN |
| . |
| 9 of 61 |
| A2.4 |
| REFLECTED CEILING PLAN |
| . |
| 10 of 61 |
| A2.5 |
| ROOF PLAN PENETRATIONS |
| . |
| 11 of 61 |
| A3.0 |
| EXTERIOR ELEVATIONS |
| . |
| 12 of 61 |
| A4.0 |
| SECTIONS & DETAILS |
| . |
| 13 of 61 |
| A7.0 |
| INTERIOR ELEVATIONS & DETAILS |
| . |
| 14 of 61 |
STRUCTURAL
| S1.0 |
| GENERAL NOTES |
| . |
| 15 of 61 |
| S1.1 |
| GENERAL NOTES & TYPICAL DETAILS |
| . |
| 16 of 61 |
| S1.2 |
| TYPICAL DETAILS |
| . |
| 17 of 61 |
| S1.3 |
| OVERALL REMODEL FLOOR PLAN |
| . |
| 18 of 61 |
| S2.0 |
| FOUNDATION PLAN |
| . |
| 19 of 61 |
| S3.0 |
| MEZZANINE FRAMING PLAN |
| . |
| 20 of 61 |
| S5.0 |
| OVERALL SECTIONS |
| . |
| 21 of 61 |
| S7.0 |
| FRAMING SECTIONS & DETAILS |
| . |
| 22 of 61 |
| S7.1 |
| FRAMING SECTIONS & DETAILS |
| . |
| 23 of 61 |
MECHANICAL
| M1.1 |
| PLUMBING DEMOLITION PLANS |
| . |
| 24 of 61 |
| M1.2 |
| HV & AC DEMOLITION PLANS |
| . |
| 25 of 61 |
| M1.3 |
| ROOF MECHANICAL DEMOLITION PLANS |
| . |
| 26 of 61 |
| M2.1 |
| PLUMBING REVISION PLANS |
| . |
| 27 of 61 |
| M2.2 |
| HV & AC REVISON PLANS |
| . |
| 28 of 61 |
| M2.3 |
| ROOF MECHANICAL REVISION PLANS |
| . |
| 29 of 61 |
| M3.1 |
| MECHANICAL DETAILS |
| . |
| 30 of 61 |
| M3.2 |
| MECHANICAL DETAILS |
| . |
| 31 of 61 |
| M3.3 |
| MECHANICAL DETAILS |
| . |
| 32 of 61 |
| M4.1 |
| MECHANICAL SCHEDULES |
| . |
| 33 of 61 |
REPAIR BUILDING 1840 & CONSTRUCT FLAMMABLE LIQUIDS STORAGE, WSA NZAS 09-1004 MALMSTROM AFB, MT. FA4626-15-R-0005
SCHEDULE OF DRAWINGS
SD-2
FIRE PROTECTION DRAW INGS
| FA1.0 FA2.0 FA2.1 FA2.2 FA3.0 FA4.0 FA4.1 FA4.2 FA4.3 FA5.0 FA6.0 | |
| NOTES AND LEGEND – FIRE ALARM/ MASS NOTIFICATION/ RELEASING DEMO PLAN – FIRE ALARM | . |
| NEW FIRE ALARM – FIRE ALARM | . NEW AND EXISTING WALL PENETRATIONS | . |
| NEW WORK PLAN-- FIRE ALARM/ MASS NOTIFICATION/ RELEASING WIRING DETAILS – FIRE ALARM | . | |
| WIRING DETAILS – MASS NOTIFICATION | . | |
| DEVICE DETAILS – FIRE ALARM/ MASS NOTIFICATION/ RELEASING RADIO TRANSCEIVER ANTENNA DETAILS | . | |
RISER DIAGRAMS – FIRE ALARM/ MASS NOTIFICATION/ RELEASING OPERATIONAL MATRICES-FA/ MNS/ RELEASING
| FS1.0 FS1.1 FS2.0 FS2.1 FS2.2 | |
| SITE PLAN LEGENDS AND NOTES--FIRE SPRINKLER/ DELUGE RISERS DEMO AND NEW – FIRE SPRINKLER/ DELUGE | |
| DEMO FIRE SPRINKLER – FIRE SPRINKLERS . NEW WORK PLANS – FIRE SPRINKLER | . NEW WORK PLANS – DELUGE | . |
| 45 of 61 | |
ELECTRICAL
| E1.1 E1.2 E1.3 E2.1 |
| ELECTRICAL SITE AND DETAILS PLAN ELECTRICAL DEMOLITION PLAN ELECTRICAL DEMOLITION, DETAILS AND ELECTRICAL REMODEL PLAN |
| . |
SCHEDULES
| E2.2 E3.1 |
| ELECTRICAL REMODEL, DETAILS AND SCHEDULES ELECTRICAL FEEDER SCHEMATICS AND SCHEDULES |
| 54 of 61 |
| E4.1 E4.2 E4.3 |
| MOTOR CONTROL CENTER DETAILS ELECTRICAL PANEL SCHEDULES ELECTRICAL PANEL SCHEDULES |
| . |
INDUSTRIAL HYGIENE
| IH1.0 |
| ASBESTOS-CONTAINING MATERIALS |
| . |
| 59 of 61 |
| IH2.0 |
| LEAD-BASED PAINT LOCATIONS |
| . |
| 60 of 61 |
COMMUNICATIONS
T1.0 COMMUNICATIONS REQUIREMENTS . 61 of 61
END OF SCHEDULE OF DRAWINGS DCNI