Response_to_Question.docx

DOCX document 15 KB Posted

Attached to
Pavement Maintenance Requirements
Solicitation number
FA4626-15-R-0002
Issued by

About this file

Response to Questions

View the file

Other files

File Type Posted
FA4626-15-R-0002_Amendment_0002.doc DOC document
FA4626-15-R-0002_Amendment_0002_Conform_Copy.doc DOC document
FA4626-15-R-0002_Amendment_0001_Conform_Copy.doc DOC document
Submittal_Schedule_Amend_1.xls XLS spreadsheet
FA4626-15-R-0002_Amendment_0001.doc DOC document
Paving_IDIQ_seeding_mixes.docx DOCX document
Response_to_Questions.docx DOCX document
Pre-Proposal_Site_Visit_Agenda.doc DOC document
Q_and_A.pdf PDF
Attch_2_Submittal_Schedule.xls XLS spreadsheet
Attch_4_Base_Entry_Policy_Letter.pdf PDF
Solicitation.doc DOC document
Attch_1_Specifications.zip ZIP file
Attach_3_Wage_Determination.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to Question

FA4626-15-R-0002

24 March 15 Questions: Item #AF Topsoil/Top soiling does not specify a depth for topsoil.

Answer: The depth is 4 inches.

Question: Item # AS Woven Geotextile Fabric is not specified in the MDOT Standard Specifications. Please provide a specification for the woven fabric.

Answer: The specification is Moderate Survivability Geotextile.

Question: Item #BK Asphalt Pavement Patching states “remove 2’ deep asphalt pavement, replace with new asphalt pavement and compact.” Yet the questions and answers states “Typical patch depth is 2”.”. Please specify the depth of asphalt patching.

Answer: Change the unit of measurement for BK to 2 inches Question: Item # AD Graded Aggregate Base has a unit of measure based on a Metric Ton.

Answer: See corrections on amendment. ton = 2000 lbs.

Question: Item # AE Borrow has a unit of measure based on a Metric Ton Answer: See corrections on amendment. ton =2000 lbs.

Question: Item # AU Geogrid is not specified in the MDOT Standard Specifications. Please provide a specification for the geogrid.

Answer: Delete item.

Question: Item # AW Traffic Control has a unit of 2 Hours. In years past, the traffic control costs were incidental to the work items in the proposal. If you do not want to make Traffic Control incidental to the work, then I would suggest Traffic Control be paid by the Unit at the MDOT unit pay structure for traffic control and not by the Hour.

Answer: Keep as is.

Question: Item # BG Rubberized Hot Applied Crack Sealant is specified in amendment number one as having a crack width of 3/4 of an inch where in the questions and answers it states crack widths of 0.125" to 1.5".

Answer: Bid as amendment #0001 states.

Question: CLIN 0001AN,1001AN, 2001AN and 3001AN The modification extends the description has changed from 6" thick to 6" thick. Please bid #4 rebar, 16' OC each way. Should the OC measurement be 16" OC each way instead of 16' OC each way?

Answer: 16 inches OC Question: CLIN 0001AP,1001AP, 2001AP and 3001AP The modification extends the description has changed from 8" thick to 8" thick. Please bid #4 rebar, 16' OC each way. Should the OC measurement be 16" OC each way instead of 16' OC each way?

Answer: 16 inches OC

Question: CLIN 0001BK, 1001BK, 2001BK and 3001BK. " The CLIN extended description Remove 2' deep asphalt pavement, replace with new asphalt pavement and compact, has been added". Should this be changed to "The CLIN extended description Remove 2" deep asphalt pavement, replace with new asphalt pavement and compact, has been added.

Answer: 2 inches

Question: Items AN and AP specify #4 rebar 16' on center each way. I am assuming it was to be 16 inches.

Answer: Yes, 16 inches.