Attch_2_Submittal_Schedule.xls
XLS spreadsheet 46 KB Posted
- Attached to
- Pavement Maintenance Requirements
- Solicitation number
- FA4626-15-R-0002
About this file
Attach 2 Submittal Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA4626-15-R-0002_Amendment_0002.doc | DOC document | |
| FA4626-15-R-0002_Amendment_0002_Conform_Copy.doc | DOC document | |
| Response_to_Question.docx | DOCX document | |
| Submittal_Schedule_Amend_1.xls | XLS spreadsheet | |
| FA4626-15-R-0002_Amendment_0001.doc | DOC document | |
| Paving_IDIQ_seeding_mixes.docx | DOCX document | |
| FA4626-15-R-0002_Amendment_0001_Conform_Copy.doc | DOC document | |
| Response_to_Questions.docx | DOCX document | |
| Q_and_A.pdf | ||
| Pre-Proposal_Site_Visit_Agenda.doc | DOC document | |
| Solicitation.doc | DOC document | |
| Attch_1_Specifications.zip | ZIP file | |
| Attach_3_Wage_Determination.docx | DOCX document | |
| Attch_4_Base_Entry_Policy_Letter.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 15-0043 | Maintain Pavements IDIQ | FA4626-15-R-0002 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | Shop Drawings 01 00 00 3.10 | 4 | PTSW | ||||||||||||||||||
| 1 | Start of Work Notification 01 00 00 - 3.11 | 1 | PTSW | ||||||||||||||||||
| 2 | Notice of Final Inspection 01 00 00 - 3.12 | 1 | PTFI | ||||||||||||||||||
| 3 | Construction Near Utility Systems 01 00 00 - 3.13 (AF Form 103) | 1 | PTSW | ||||||||||||||||||
| 4 | Utility Outage Notices 01 00 00 - 3.14 | 1 | 14 PTO | ||||||||||||||||||
| 5 | Quality Control Plan 01 00 00 - 3.18.2 | 4 | PTSW | ||||||||||||||||||
| 6 | Quality Control Records 01 00 00 - 3.18.4 | 1 | EWD | ||||||||||||||||||
| 7 | Progress Schedule 01 00 00 - 3.20 (AF Form 3064) | 4 | PTSW | ||||||||||||||||||
| 8 | Nuclear Densometers 01 00 00 - 3.22 | 4 | PTSW | ||||||||||||||||||
| 9 | Authority to Direct the Contractor Form MALMCEP 1000 - 01 00 00 - 3.25 | 4 | PTSW | ||||||||||||||||||
| 10 | Entry Authorization Letter - 01 00 10 | 4 | 30 PTSW | ||||||||||||||||||
| 11 | Property Inventory Checklist (AF Form 1354) 01 78 54 | 4 | PTFI | ||||||||||||||||||
| 12 | Construction Dewatering Permit - 13 60 00 - 2.3 & 4.1.1 | 4 | PTSW | ||||||||||||||||||
| 13 | Construction Storm Water Notice of Intent 13 60 00 - 2.3 & 4.3.1.A | 4 | PTSW | ||||||||||||||||||
| 14 | Construction Storm Water Polution Prevention Plan 13 60 00 - 2.3 & 4.3.1.B | 4 | PTSW | ||||||||||||||||||
| 15 | Construction Storm Water Notice of Termination 13 60 00 - 2.3 & 4.3.1.1 | 4 | PTSW | ||||||||||||||||||
| 16 | Demolition Activities Notification 01 36 00 - 2.4 | 4 | PTSW | ||||||||||||||||||
| 17 | Hazardous Materials Report EESOH-MIS 3952 - 01 36 00 - 8.1.2 | 4 | PTSW | ||||||||||||||||||
| 18 | Monthly Report of Solid Waste Disposal and Diversion - 01 36 00 - 11.3 | 4 | Monthly | ||||||||||||||||||
| 19 | Waste Management Plan - 01 36 00 - 11.6 | 4 | PTSW | ||||||||||||||||||
| 20 | Recovered Materials Written Determination Form - 01 36 00 - 12.4 | 4 | PTSW | ||||||||||||||||||
| 21 | Recycled Material Use Report - 01 36 00 - 12.5 | 4 | PTSW | ||||||||||||||||||
| 22 | Geotextile Sample MDT Sec 622.02.3 | 4 | 4 | BMD | |||||||||||||||||
| 23 | Geogrid Sample MDT Sec 622.02.3 | 4 | 4 | BMD | |||||||||||||||||
| 24 | Geogrid and Geotextile Certificate of Compliance MDT Sec 622.02.2 | 4 | 4 | BMD | |||||||||||||||||
| 25 | Bituminous Pavement Plant Mix Formula MDT Sec 403.03.1 | 4 | ACA | ||||||||||||||||||
| 26 | Bituminous Materials MDT Sec 702 | 4 | 4 | ACA | |||||||||||||||||
| 27 | Aggregates for Bituminous Plant Mix Pavement MDT Sec 701.03 | 4 | 10 PTSW | ||||||||||||||||||
| 28 | Aggregates for Concrete MDT Sec 501.03.1, 701.01 | 4 | 10 PTSW | ||||||||||||||||||
| 29 | Aggregates for Base Courses MDT Sec 701.02 | 4 | 10 PTSW | ||||||||||||||||||
| 30 | Paint and Bead Certifications MDT Sec 714 | 4 | 10 PTSW | ||||||||||||||||||
| 31 | |||||||||||||||||||||
| 32 | |||||||||||||||||||||
| 33 | |||||||||||||||||||||
| 34 | |||||||||||||||||||||
| 35 | |||||||||||||||||||||
| 36 | |||||||||||||||||||||
| 37 | |||||||||||||||||||||
| 38 | |||||||||||||||||||||
| 39 | |||||||||||||||||||||
| 40 | |||||||||||||||||||||
| 41 | |||||||||||||||||||||
| 42 | |||||||||||||||||||||
| 43 | |||||||||||||||||||||
| 44 | |||||||||||||||||||||
| 45 | |||||||||||||||||||||
| 46 | |||||||||||||||||||||
| 47 | |||||||||||||||||||||
| 48 | |||||||||||||||||||||
| 49 | |||||||||||||||||||||
| 50 | |||||||||||||||||||||
| Schedule of Abbreviations: | |||||||||||||||||||||
| AWC | = After Work Completed | BMD | = | Before Material Delivery | |||||||||||||||||
| PTSW | = Prior to Starting Work | AN | = | Advance Notification | |||||||||||||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| PTFA | = Prior to Final Acceptance | PTSA | = | Prior To Start of Action | |||||||||||||||||
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
&L&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA&R&"Times New Roman,Regular"&12FA4626 15 R0002 &L&"Times New Roman,Regular"&12AF Form 66 &F-&D&C&"Times New Roman,Regular"&12
REQUIRED TECHNICAL SUBMITTALS