Attachment 2 - Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Switchgear Measurements.pdf | ||
| Additional Questions and Answers.docx | DOCX document | |
| Questions and Answers(2)_ 23 Jul 09.docx | DOCX document | |
| Q A's from the site visit.zip | ZIP file | |
| Wage Det_MT1_Atch 5_Revised.docx | DOCX document | |
| Amendment 0002.doc | DOC document | |
| 09-R-0021 - Drawings - Amended.zip | ZIP file | |
| Amendment 0001.doc | DOC document | |
| Q and A's for Solicitation FA426-09-R-0021.docx | DOCX document | |
| Solicitation - FA4626-09-R-0021.doc | DOC document | |
| Wage Det_MT1_Atch 5.docx | DOCX document | |
| SCHEDULE OF DRAWINGS_Atch 3.docx | DOCX document | |
| Drawings_Atch 4.zip | ZIP file | |
| Specifications_Atch 1.zip | ZIP file | |
| Past Performance Survey_Atch 6.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 05-1038 | Replace Substation Breakers | FA4626-09-R-0021 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | As Built Field Data 01000 3.5 | 4 | PTFA | ||||||||||||||||||
| 2 | Operating and Maintenance Instructions 01000 3.7 | 4 | PTFA | ||||||||||||||||||
| 3 | Contractor Furnished Equipment List 01000 3.8 | 4 | PTFA | ||||||||||||||||||
| 4 | Shop Drawings 01000 3.9 as Required by Technical Specifications | 4 | PS | ||||||||||||||||||
| 5 | Start of Work Notification 01000 3.10 | 1 | PTSW | ||||||||||||||||||
| 6 | Notice of Final Inspection 01000 3.11 | 1 | PTFI | ||||||||||||||||||
| 7 | Construction Near Utility Systems 01000 3.12 | 1 | PTSW | ||||||||||||||||||
| 8 | Utility Outage Notices 01000 3.13 | 1 | PTO | ||||||||||||||||||
| 9 | Submittals 01000 3.14 | 4 | PSS | ||||||||||||||||||
| 10 | Quality Control Plan 01000 3.17 | 4 | PTSW | ||||||||||||||||||
| 11 | Quality Control Records 01000 3.17.Q | 1 | EWD | ||||||||||||||||||
| 12 | 1354 Checklist (Property Inventory Checklist) 01000 3.18 | 4 | PTFI | ||||||||||||||||||
| 13 | Nuclear Densometers 01000 3.20.A | 4 | PTSW | ||||||||||||||||||
| 14 | Asbestos Free Facility 01000 3.35.B | 4 | PTSW | ||||||||||||||||||
| 15 | Identification of Employees 01001 1.1. A. | 4 | PTSW | ||||||||||||||||||
| 16 | Environmental Protection 01360 Attachment - Waste Management Plan | 4 | ANTP | ||||||||||||||||||
| 17 | Environmental Protection 01360 Attachment - Recovered Materials Written Determination Form | 4 | ANTP | ||||||||||||||||||
| 18 | Environmental Protection 01360 Attachment - Recycled Material Use Form | 4 | ANTP | ||||||||||||||||||
| 19 | Submittals 01732 1.5 Literature & Schedule of Demolition Activities | 4 | PTSW | ||||||||||||||||||
| 20 | Earthwork 02300 1.4.A. Warning Tape | 4 | * | *10d PTSW | |||||||||||||||||
| 21 | Earthwork 02300 1.4.B. Material Test Report | 4 | * | *15d ANTP | |||||||||||||||||
| 22 | Chain Link Fences 02821 1.4.A. through D. | 4 | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||
| 23 | Cast-in-Place Concrete 03300, 1.3.B. Product Data & Instructions | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||||
| 24 | Cast-in-Place Concrete 03300, 1.3.C. Product Samples | 1 | * | *15d ANTP | |||||||||||||||||
| 25 | Cast-in-Place Concrete 03300, 1.3.D. Mix Design | 4 | * | *21d PTSW | |||||||||||||||||
| 26 | Cast-in-Place Concrete 03300, 1.3.E. Test Results | 4 | * | *36 hours AWC | |||||||||||||||||
| 27 | Structural Steel 05120, 1.3. | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||||
| 28 | Cold Formed Metal Framing 05400, 1.3.A. | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||||
| 29 | Preformed Metal Siding and Roofing 07400, 1.3 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||
| 30 | Joint Sealants 07920, 1.3 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||
| 31 | Steel Doors and Frames, 08110, 1.2.A. | 4 | 4 | 4 | 4 | 4 | *15d ANTP | ||||||||||||||
| 32 | Overhead Coiling Doors, 08361, 1.5 | 4 | 4 | 4 | 4 | 4 | 4 | *15d ANTP | |||||||||||||
| 33 | Finish Hardware 08710, 1.4 | 4 | 4 | 4 | 4 | *15d ANTP | |||||||||||||||
| 34 | Painting 09900, 1.4 | 4 | 4 | 4 | 4 | *15d ANTP | |||||||||||||||
| 35 | Operation and Maintenace Manuals 15000, 1.18.B O&M's for all equipment | 2 | PTFP | ||||||||||||||||||
| 36 | Fans 15820, 2.1 Shop Drawings | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||
| 37 | Ductwork and Accessories 15841, 1.6 Equipment Submittals | 4 | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||
| 38 | Basic Electrical Requirements 16050, 1.4.D. Seismic Restraint (Calculations at Government's Option) | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||
| 39 | Basic Electrical Requirements 16050, 3.2.K. Contractor Qualifications | 4 | 4 | * | *10d ANTP | ||||||||||||||||
| 40 | Raceways 16110, 2.4 | 4 | 4 | * | *15d ANTP | ||||||||||||||||
| 41 | Conductors (Under 600 Volts) 16120, 1.2 | 4 | * | *15d ANTP | |||||||||||||||||
| 42 | Conductors (Over 600 Volts) 16124, 1.2 | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||
| 43 | Boxes 16130, 1.3 | 4 | * | *15d ANTP | |||||||||||||||||
| 44 | Panelboards - 16160, 1.3 | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||||
| 45 | Protective Relays 16295, 1.6 | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||||
| 46 | Busways16340, 1.3. | 4 | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||
| 47 | Medium Voltage Switchgear 16345, 1.6. | 4 | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||
| 48 | Medium Voltage Switchgear 16345, 12 Extra Materials (spare fuses) | 1 | * | *15d ANTP | |||||||||||||||||
| 49 | Medium Voltage Load Interrupter Switchgear 16350, 1.5. | 4 | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||
| 50 | Medium Voltage Regulators 16355, 1.2.A - C. | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||
| 51 | Medium Voltage Regulators 16355, 1.2.D. Pentahead Sockets | 2 | * | *PTFA | |||||||||||||||||
| 52 | 48 VDC Battery System 16360, 1.3 | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||
| 53 | Lighting Fixtures - 16500, 1.1.C & D. | 4 | 4 | * | *15d ANTP | ||||||||||||||||
| Schedule of Abbreviations: | |||||||||||||||||||||
| AWC | = After Work Completed | EWD | = Each work day AF Form 3000 not required | PTFP | = | Prior to Final Payment | |||||||||||||||
| PTSW | = Prior to Starting Work | PTFA | = Prior to Final Acceptance | PTCW | = | Prior to Completing Work | |||||||||||||||
| AFA | = After Final Acceptance | BMF | = | Before Material Delivery | AFI | = | After Final Inspection | ||||||||||||||
| PTO | = Prior to Outage | SN | = | Advance Notification | PT | = | Prior To | ||||||||||||||
| PTNT | = Prior to Notice to Proceed | SRO | = | After Each Occurrence | PSS | Per Submittal Schedule | |||||||||||||||
| ANTP | = After Notice to Proceed | PTFI | = | Prior to Final Inspection |
| &"Times New Roman,Regular"&12Attachment 2 | &"Times New Roman,Regular"&12Replace Substation Breakers |
| NZAS 05-1038 | &"Times New Roman,Regular"&12FA4626-xx-R-xxxx |
&"Times New Roman,Regular"&12AF Form 66 02:
&F-&D &"Times New Roman,Regular"&12 SS-&P
REQUIRED TECHNICAL SUBMITTALS