Q and A's for Solicitation FA426-09-R-0021.docx
DOCX document 12 KB Posted
- Attached to
- RECOVERY-- NZAS051038 - Repair Substation Breakers Federal contract opportunity
- Solicitation number
- FA4626-09-R-0021
About this file
The attached are some questions and answers received by some contractors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Switchgear Measurements.pdf | ||
| Additional Questions and Answers.docx | DOCX document | |
| Questions and Answers(2)_ 23 Jul 09.docx | DOCX document | |
| Q A's from the site visit.zip | ZIP file | |
| Wage Det_MT1_Atch 5_Revised.docx | DOCX document | |
| Amendment 0002.doc | DOC document | |
| 09-R-0021 - Drawings - Amended.zip | ZIP file | |
| Amendment 0001.doc | DOC document | |
| SCHEDULE OF DRAWINGS_Atch 3.docx | DOCX document | |
| Drawings_Atch 4.zip | ZIP file | |
| Specifications_Atch 1.zip | ZIP file | |
| Solicitation - FA4626-09-R-0021.doc | DOC document | |
| Wage Det_MT1_Atch 5.docx | DOCX document | |
| Past Performance Survey_Atch 6.docx | DOCX document | |
| Submittal Schedule_Atch 2.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for Solicitation FA426-09-R-0021, Repair Substation Breakers
Q: Specific sheet note #3 indicates items shown with light line weights are existing, however, all lines appear to be the same density.
A: The line weights on the original drawings did not print correctly. An amended set of drawings, sheets 1 thru 27 have been prepared and will be posted via an amendment. This should clarify the line weights.
Q: In specification section 16435 Medium Voltage Switchgear, 2.1 Manufacturer, lists GE PowerVac switchgear, or equal. Please confirm that Square D/Schneider Electric will be an accepted substitute.
A: Square D/Schneider Electric is an acceptable manufacturer; however, it is up to the contractor to ensure that the product specified meets or exceeds the requirements of the specifications, i.e. “equal to the product specified”.
Q: It appears that this proposal is for two lineups of 15 kV switchgear interconnected via non-seg busway. These lineups are fed from two transformers that have no specifications.
A: Correct that the proposal is for two lineups interconnected via busway through a tie switch. The proposal shows no specifications for the transformers because they are existing to remain.
Q: The site plan E1.1 Specific Remodel Notes #1 indicates “New Building” to see E2.1 the electrical floor plan that shows partial equipment shown on the one-line on E3.1.
A: The site plan E1.1 indicates that there are two new rows of switchgear. The note refers to E2.1 to show the individual sections of the line-ups.
Q: Is the house part of the scope of this proposal? There are no housing specifications.
A: Yes, the house is part of the scope of work for the proposal. There are structural drawings for the building as well as specifications for the building materials in the proposal.
Q: There are existing conduit and entry points. Does our gear have to match the dimensions, conduit entry points and elevations shown on the front elevations E5.0 and E5.1?
A: The conduit entry points must be maintained otherwise new feeders would have to be installed and installation of new feeders is beyond the scope of this proposal.
Q: The RFP FA4626-09-R-0021 page 3 of 43 indicates nameplate information that is not listed on the one-lines. It is difficult for me to determine what I need to provide a quote on.
A: I believe the confusion is with the NSN that this number is generated by Contracting’s Procurement System. This is not name-plate data. The intent is to provide and install equipment per the drawings and specifications. This can be addressed further at the site visit.