Past Performance Survey_Atch 6.docx
DOCX document 21 KB Posted
- Attached to
- RECOVERY-- NZAS051038 - Repair Substation Breakers Federal contract opportunity
- Solicitation number
- FA4626-09-R-0021
About this file
Attachment 6 - Past Performance Survey
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Switchgear Measurements.pdf | ||
| Additional Questions and Answers.docx | DOCX document | |
| Questions and Answers(2)_ 23 Jul 09.docx | DOCX document | |
| Q A's from the site visit.zip | ZIP file | |
| Amendment 0002.doc | DOC document | |
| Wage Det_MT1_Atch 5_Revised.docx | DOCX document | |
| 09-R-0021 - Drawings - Amended.zip | ZIP file | |
| Amendment 0001.doc | DOC document | |
| Q and A's for Solicitation FA426-09-R-0021.docx | DOCX document | |
| Submittal Schedule_Atch 2.xlsx | XLSX spreadsheet | |
| Solicitation - FA4626-09-R-0021.doc | DOC document | |
| Wage Det_MT1_Atch 5.docx | DOCX document | |
| SCHEDULE OF DRAWINGS_Atch 3.docx | DOCX document | |
| Drawings_Atch 4.zip | ZIP file | |
| Specifications_Atch 1.zip | ZIP file |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4626-09-R-0021
FOR OFFICIAL USE ONLY
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE
A. GENERAL INFORMATION: Please correct any information below known to be inaccurate:
Contractor’s Name: ____________________ Telephone Number: ____________________ Address: __________________________ Fax Number: _________________________ __________________________ Point of Contact: ______________________
| __________________________ |
| __________________________ |
Project Title and Brief Description of Work: _____________________________________*
Contract Number Provided by Offeror: ___________________ Dollar Amount: ________*
Contract Period or Dates of Performance Provided by Offeror: ______________________*
Contractor performed as the Prime Contractor Sub-Contractor Key Personnel.
B. RESPONDENT INFORMATION:
Name & Title of Evaluator: _____________________ Company Name: ____________________________
| Address: _____________________ | Telephone Number: ___________________ _____________________________ | Fax Number: | _____________________ |
| _____________________________ | Email Address: _____________________ |
C. SEND COMPLETED SURVEY FORM TO:
341 CCS/LGCP
7015 Goddard Drive, Bldg 145 Malmstrom AFB, MT 59402 ATTN: Gail Carroll
FAX: (406) 731-3748
EMAIL: gail.carroll@malmstrom.af.mil
DUTY PHONE: (406) 731-4028
CONTRACTOR’S NAME: _______________ CONTRACT NUMBER: _______________
D. PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (E, G, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U.
| E |
| G |
| S |
| M |
| U |
| N |
| Exceptional |
| Good |
| Satisfactory |
| Marginal |
| Unsatisfactory |
| Neutral |
Performance meets contractual requirements with many exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.
Performance meets contractual requirements with some exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor were effective.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Performance was not observed or not applicable to the current effort being reported against.
CONTRACTOR’S NAME: _______________ CONTRACT NUMBER: _______________
Place an “X” in the appropriate column using the definitions matrix above.
| The contractor: |
| E |
| G |
| S |
| M |
| U |
| N |
| 1. |
| Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements. |
| 2. |
| Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period. |
| 3. |
| Delegated authority to project managers and supervisors commensurate with contract requirements. |
| 4. |
| Home office participated in solving significant local problems. |
| 5. |
| Followed approved quality control plan. |
| 6. |
| Provided effective quality control and/or inspection procedures to meet contract requirements. |
| 7. |
| Corrected deficiencies in timely manner and pursuant to their quality control procedures. |
| 8. |
| Provided timely resolution of contract discrepancies. |
| 9. |
| Identified problems as they occurred. |
| 10. |
| Suggested alternative approaches to problems. |
| 11. |
| Displayed initiative to solve problems. |
| 12. |
| Developed realistic progress schedules. |
| 13. |
| Met established project schedules. |
| 14. |
| Provided timely resolution of warranty defects. |
| 15. |
| Was responsive to contract changes. |
| 16. |
| Provided adequate project supervision. |
| 17. |
| Obtained consent of surety for increases in bonding as work-in-progress increased. |
| 18. |
| Paid subcontractors/suppliers in a timely manner. |
| 19. |
| Provided accurate and complete line item cost proposals including all aspects of work required for each task. |
| 20. |
| Cooperated with Government personnel after award. |
| 21. |
| How would you rate the contractor's overall performance? |
| 22. |
| Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.” |
YES/NO
| 23. |
| Would you award another contract to this contractor? If not, explain in “remarks.” |
YES/NO
| 24. |
| Is the contractor rated in CCASS? |
| YES/NO |
OVERALL RATING: ___________________________
CONTRACTOR’S NAME: ___________________ CONTRACT NUMBER __________
Remarks:___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________