Additional Questions and Answers.docx
DOCX document 11 KB Posted
- Attached to
- RECOVERY-- NZAS051038 - Repair Substation Breakers Federal contract opportunity
- Solicitation number
- FA4626-09-R-0021
About this file
Additional Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Switchgear Measurements.pdf | ||
| Questions and Answers(2)_ 23 Jul 09.docx | DOCX document | |
| Q A's from the site visit.zip | ZIP file | |
| Wage Det_MT1_Atch 5_Revised.docx | DOCX document | |
| Amendment 0002.doc | DOC document | |
| 09-R-0021 - Drawings - Amended.zip | ZIP file | |
| Amendment 0001.doc | DOC document | |
| Q and A's for Solicitation FA426-09-R-0021.docx | DOCX document | |
| Solicitation - FA4626-09-R-0021.doc | DOC document | |
| Wage Det_MT1_Atch 5.docx | DOCX document | |
| SCHEDULE OF DRAWINGS_Atch 3.docx | DOCX document | |
| Drawings_Atch 4.zip | ZIP file | |
| Specifications_Atch 1.zip | ZIP file | |
| Past Performance Survey_Atch 6.docx | DOCX document | |
| Submittal Schedule_Atch 2.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additional Questions and Answers 1.
Q: Can the tie switch in the 15kV switchgear be a non-fused switch?
A: Correct. The tie switch is to be non-fused. In fact, no fuse is to be installed on the tie bus.
2.
Q: Section 07400.2.1.a indicated a 13/16 high rib at 12: oc. 2.1c-2 indicates 24” inch wide panel. Typically 12: oc high rib and intermediate low rib is standard on a 36: wide panel. Is it 36 or 24 called for?
A: Provide 24-inch wide panels per the specifications.
3.
Q: Is the roof mechanically seamed?
A: Refer to Section 07400.3.2.A.4 for seaming of panels. This section states that panels are to be seamed with an electric powered machine supplied by the manufacturer.