Questions and Answers(2)_ 23 Jul 09.docx

DOCX document 11 KB Posted

Attached to
RECOVERY-- NZAS051038 - Repair Substation Breakers Federal contract opportunity
Solicitation number
FA4626-09-R-0021
Issued by
Department of the Air Force Global Strike Command

About this file

Q A's

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY-- NZAS051038 - Repair Substation Breakers, newest first.
File Type Posted
Switchgear Measurements.pdf PDF
Additional Questions and Answers.docx DOCX document
Q A's from the site visit.zip ZIP file
Wage Det_MT1_Atch 5_Revised.docx DOCX document
Amendment 0002.doc DOC document
09-R-0021 - Drawings - Amended.zip ZIP file
Amendment 0001.doc DOC document
Q and A's for Solicitation FA426-09-R-0021.docx DOCX document
SCHEDULE OF DRAWINGS_Atch 3.docx DOCX document
Solicitation - FA4626-09-R-0021.doc DOC document
Wage Det_MT1_Atch 5.docx DOCX document
Drawings_Atch 4.zip ZIP file
Specifications_Atch 1.zip ZIP file
Past Performance Survey_Atch 6.docx DOCX document
Submittal Schedule_Atch 2.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers (2)

FA4626-09-R-0021

Q: Distance between the edge of the conduit and the edge of the 45” cubicle.

A: Able to measure for one of the cubicles and center of conduit was 14-inches from the right side when facing the rear of the cabinet. However, this cannot be assumed to be typical.

Q: Distance between the edge of the conduit and the back of the switchgear.

A: Able to measure for one of the cubicles and center of conduit to rear of cabinet was approximately 14-inches. However, this cannot be assumed as typical. Pictures previously posted along with the

Q: Height of the cable termination. Measure from the floor to a point between the two bolts.

A: Measurement from floor to the point between the two bolts is approximately 37-inches.

Q: Are the pictures from a breaker section? They appear to be from an incoming or possibly a metering Section.

A: Pictures were previously posted. Pictures of feeder sections a MAFB Sub 001, MAFB Sub 003, and MAFB Sub 006. Pictures of the main are MAFB Sub 013 Main and MAFB Sub 014 Main.

Q: Can we get pictures from the 2-high feeder sections?

A: The 2-high feeder sections shown in the drawings are for the new design. Existing sections are not 2-high.