Questions and Answers(2)_ 23 Jul 09.docx
DOCX document 11 KB Posted
- Attached to
- RECOVERY-- NZAS051038 - Repair Substation Breakers Federal contract opportunity
- Solicitation number
- FA4626-09-R-0021
About this file
Q A's
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Switchgear Measurements.pdf | ||
| Additional Questions and Answers.docx | DOCX document | |
| Q A's from the site visit.zip | ZIP file | |
| Wage Det_MT1_Atch 5_Revised.docx | DOCX document | |
| Amendment 0002.doc | DOC document | |
| 09-R-0021 - Drawings - Amended.zip | ZIP file | |
| Amendment 0001.doc | DOC document | |
| Q and A's for Solicitation FA426-09-R-0021.docx | DOCX document | |
| SCHEDULE OF DRAWINGS_Atch 3.docx | DOCX document | |
| Solicitation - FA4626-09-R-0021.doc | DOC document | |
| Wage Det_MT1_Atch 5.docx | DOCX document | |
| Drawings_Atch 4.zip | ZIP file | |
| Specifications_Atch 1.zip | ZIP file | |
| Past Performance Survey_Atch 6.docx | DOCX document | |
| Submittal Schedule_Atch 2.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers (2)
FA4626-09-R-0021
Q: Distance between the edge of the conduit and the edge of the 45” cubicle.
A: Able to measure for one of the cubicles and center of conduit was 14-inches from the right side when facing the rear of the cabinet. However, this cannot be assumed to be typical.
Q: Distance between the edge of the conduit and the back of the switchgear.
A: Able to measure for one of the cubicles and center of conduit to rear of cabinet was approximately 14-inches. However, this cannot be assumed as typical. Pictures previously posted along with the
Q: Height of the cable termination. Measure from the floor to a point between the two bolts.
A: Measurement from floor to the point between the two bolts is approximately 37-inches.
Q: Are the pictures from a breaker section? They appear to be from an incoming or possibly a metering Section.
A: Pictures were previously posted. Pictures of feeder sections a MAFB Sub 001, MAFB Sub 003, and MAFB Sub 006. Pictures of the main are MAFB Sub 013 Main and MAFB Sub 014 Main.
Q: Can we get pictures from the 2-high feeder sections?
A: The 2-high feeder sections shown in the drawings are for the new design. Existing sections are not 2-high.