PRQE_16-0123_Pre-proposal_Site_Visit_slides.pdf
PDF 148 KB Posted
- Attached to
- Repair Ramp Lighting Federal contract opportunity
- Solicitation number
- FA4621-R-0005
About this file
Pre-Proposal Slides
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4621-15-R-0005-0002_Amendment__2.pdf | ||
| PRQE_16-0123_Preproposal_Conference_Minutes.pdf | ||
| PRQE_16-0123_Sign-In_Sheet.pdf | ||
| PRQE_16-0123_Contractor's_Questions_and_Answers.pdf | ||
| Drawings_-_2_and_3_BAY_HANGAR_Electrical_-_Part_2_of_2.pdf | ||
| FA4621-15-R-0005-0001_Amendment.pdf | ||
| Drawings_-_2_and_3_BAY_HANGAR_Electrical_-_Part_1_of_2.pdf | ||
| SOW_19_Aug_Revised.pdf | ||
| Attch_3_-_Sample_Materials_Submittal_Register.pdf | ||
| Attch_6_-_Present_and_Past_Performance_Survey.pdf | ||
| Attch_4_-_Drawings.pdf | ||
| Attch_5_-_Wage_Determination_-_KS140035.pdf | ||
| Attch_1_-_SOW.pdf | ||
| RFP_-_PRQE_16-0123_Repair_Ramp_Lighting.pdf | ||
| Attch_2_-_General_Conditions.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Conference for
Repair Ramp Lighting
McConnell AFB, KS 19 August 2015
Early Exchanges of Information
• This conference facilitates the prudent exchange of information between the Government and prospective Offerors.
• Any questions or concerns that may be discussed at this time are specifically non-binding as only the CO can enter into obligations on behalf of the Government.
• If you have any questions concerning this notice, please feel free to ask the contract administrator.
Overview
• Identify key personnel and their responsibilities
• Define the requirements
• Detail unique Government considerations
• Explain proposal requirements (CES)
• Discuss amendments
• Conduct site visit
• Invite questions and answers
Key Personnel & Their Responsibilities
• CO – The only person who can bind the Government-Ms.
Valerie Brown
• CA – CO’s assistant-SrA Christian Luevano
• Project engineer – Technical expert-Mr. Albert Seemayer
• Quality assurance-Inspector will be assigned after award
Presenter Presentation Notes CA introduces key personnel in the room and defines their associated responsibilities:
- CO is the only person empowered to obligate the Government.
- CA is the main point of contact between the Government and prospective offerors; acts as the agent for the CO. POC for communication.
- CES/Project Engineer is the technical expert intimately familiar with the performance work requirements associated with the solicitation
- CES/QA is required to report to the CO on contractor performance issues.
Define the Requirements
• Solicitation Package:
• SF 1442/Bid Schedule/Provisions/Clauses
• Attachment 1 – Statement of Work
• Attachment 2 – General Conditions
• Attachment 3 – Sample Materials Submittal Register
• Attachment 4 – Drawings
• Attachment 5 – Wage Determination
• Attachment 6 – Past and Present Performance Survey
Define the Requirements
• Solicitation to Small Businesses
• Davis-Bacon Act
• Wage Determination KS150035, dated 29 May 15
• Weekly Payroll
• Schedule of Materials Submittal
• Contract award contingent on funding
• Period of Performance (PoP) – 260 days after notice to proceed (NTP)
• NAICS - 238210
Presenter Presentation Notes For explanation of SOW/specifications/drawings, refer to project engineer.
Unique Considerations
• System for Award Management (SAM)
• Wide Area Workflow (WAWF)
• Base Access Requests (formerly MCCON Form 114)
• Bonds
• Availability of Funds - Funds are not presently available for this project. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the RFP closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse any offerors for any costs.
Presenter Presentation Notes Offerors should acknowledge understanding that base access requests must be submitted for each employee who needs to gain access to the base. Contractor badges must be worn at all times by each employee while on base. All badges must be turned in to the Government prior to the final invoice being paid.
Proposal Requirements
• Proposal Preparation/Instructions-use Solicitation
• Proposals are due to this office
• NLT 2:00 PM, 04 September 2015
• Late proposals not accepted
• Proposal Evaluations
• Past Performance Tradeoff – past performance significantly more important than price
Presenter Presentation Notes Note that delay should be anticipated when hand-carrying proposals. Offerors should allow sufficient time to obtain any required passes and arrive at the bid depository PRIOR to the time specified for receipt
Best Value – Past performance tradeoff
Proposal Requirements (cont’d)
• Amendments
• Only an amendment from the CO changes the solicitation
• Acknowledgement procedures-(contractor must acknowledge to be binding)
• Requirement (CES)
• SOW
• Specifications
• Drawings
• Site visit to facilities
Presenter Presentation Notes There are no changes to the solicitation package without an official amendment from the CO.
Educate offerors on the proper way to officially acknowledge amendments to the solicitation on their proposals by signing, dating and submitting page 1 of the SF30 of each amendment.
Conclusion
• Proposals are due to this office
• NLT 2:00 PM, Fri 04 Sep 2015
• Proposal conference meeting minutes along with questions/answers will be provided via FBO
• Questions? Written questions are due to this office
• NLT 3:00 PM, 24 Aug 2015
| Pre-Proposal Conference �for�Repair Ramp Lighting |
| Early Exchanges of Information |
| Overview |
| Key Personnel & Their Responsibilities |
| Define the Requirements� |
| Define the Requirements |
| Unique Considerations |
| Proposal Requirements |
| Proposal Requirements (cont’d) |
| Conclusion |
File details come from the government source that posted it. Updated .