FA461018R0020_Amend_0001.pdf
PDF 244 KB Posted
- Attached to
- Repair Fire Suppression System, B10122 Federal contract opportunity
- Solicitation number
- FA4610-18-R-0020
About this file
Solicitation Amendment FA4610-18-R-0020-P00001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| XUMU_58XXXX_157.pdf | ||
| XUMU_58XXXX_158.pdf | ||
| XUMU_941006B_F-1.pdf | ||
| XUMU_941006B_F-201.pdf | ||
| FA461018R0020_Conformed_Through_Amend_0001.pdf | ||
| HAZARD_DEFICENIES_REPORT_SPRINKER_BLDG_10122.pdf | ||
| 07-1240B_QuesAns_for_Solicitation.pdf | ||
| 07-1240B_Site_Visit_Sign_in_2.pdf | ||
| Attachment_3_07-1240B_RMDF.pdf | ||
| Attachment_7_QC_Spec_01_44_00_22-Feb-2017.pdf | ||
| FA461018R0020.pdf | ||
| Attachment_2_Wage_Determination_CA180023_dtd_6Jul2018.pdf | ||
| Attachment_1_07-1240B_Statement_of_Work.pdf | ||
| Attachment_5_GenSpec_01_00_00_dtd_6JAN2017.pdf | ||
| Attachment_4_Bldg_10122_FlrPlns.pdf | ||
| Attachment_6_Environ_Specs_01_57_20_April_2018.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F4D3D98113AG01 07-1240B
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of the solicitation amendment is to add the follow ing sentence to Section L:
Equipment information (i.e. cut sheets) w ill not be included in the page count if provided at the end of Volume II and specif ically identif ied as an appendix.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA461018R0020
X 9B. DATED (SEE ITEM 11)
09-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2018
CODE
FA4610 - 30TH CONS
1515 ICELAND AVE. (BLDG 8500), RM 150
VANDENBERG AFB CA 93437-5212
FA4610 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA461018R0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
INSTRUCTION TO OFFERORS
A. General Instructions: This section provides general guidance for preparing proposals, as well as specific instructions on the format and content of the proposal. Throughout this section, the term “offeror” means the prime contractor submitting the proposal. The offeror’s proposal must include all data and information requested and must be submitted in accordance with these instructions. Any offeror who submits an incomplete package may be considered non-responsive. The offer shall be compliant with the requirements as stated in the Request for Proposal
(RFP). A proposal that is sufficiently documented to support cost/price and technical requirements in a complete, orderly, and specific detailed manner will enable the Government to perform a thorough and fair evaluation. Non-compliance with the instructions and RFP may result in an unfavorable proposal evaluation and may be grounds to eliminate the proposal from consideration for contract award.
B. Type of Acquisition: This acquisition is a competitive Total Woman Owned Small Business Set-Aside.
For this acquisition, selection of the best value offeror(s) will be made using Lowest Priced Technically Acceptable
(LPTA) procedures with the technical factors evaluated on an acceptable/unacceptable basis.
C. Construction Wage Rate Requirements: The Construction Wage Requirements Statute Wage
Determination included in Section J is incorporated for reference only. Prior to award, the most current wage determination will be incorporated into the award document. Offerors should consider any potential increases to the wage determination during the proposal acceptance period (SF 1442 Block 13 D) when preparing their pricing. No adjustments to proposal prices will be allowed as a result of increases in the wage determination unless the
Government opens discussions.
D. Discrepancies and Ambiguities: If an offeror believes the requirements in these instructions contain an error, omission, ambiguities, or are otherwise unsound, the offeror shall immediately notify the CO in writing with supporting rationale no later than 10 calendar days after the RFP release.
E. Mistakes: Mistakes in offeror’s proposal shall be handled in accordance with FAR 14.407-4 as referenced in FAR 15.508.
F. Postponement of Proposal Closing Date: If a determination is made to postpone a proposal closing date, an announcement of the determination shall be posted to the Electronic Posting System (EPS) and, if practicable, before issuance of a formal RFP amendment otherwise communicated to prospective offerors.
G. Discussions: When discussions or requests for revised offers are not conducted or requested by the
Government, the prices identified in Schedule B shall be valid through the proposal acceptance period (SF 1442
Block 13 D).
H. Contract Document: Sections K, L and M apply to the solicitation phase only; therefore, they will not be a physical part of the resulting contract.
I. Points of Contact (POC): The POC for this acquisition is CO, Jeffrey Grelck, and the Contracting
Specialist (CS), Daniel Brock. Written requests for clarification may be sent to the CO/CS. Address any questions or concerns to them using the following contact information:
Jeffrey C. Grelck Daniel Brock
(Jeffrey.Grelck@us.af.mil) (daniel.brock.5@us.af.mil)
30 CONS/PKA 30 CONS/PKA
1515 Iceland Ave Bldg 8500 1515 Iceland Ave Bldg 8500
Vandenberg AFB, CA 93437 Vandenberg AFB, CA 93437
Phone: (805) 606-9760 Phone: (805) 606-8437
L-1 PROPOSAL PREPARATION INSTRUCTIONS
The proposal package must be completed and returned to the address in Block 7 of the SF 1442 attention Jeffrey
Grelck, prior to the time set for closing of proposals, see Block 13A of the SF 1442.
A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
Proposals must be complete, self-sufficient, and respond directly to the requirements of this solicitation.
Alternate proposals will not be accepted. The response shall consist of two (2) separate volumes; Volume I –
Executed Contract Documentation and Price Proposal, Volume II – Technical Proposal.
B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness of the price.
C. Format for proposal Volumes I and II shall be as follows:
1. USE OF USPS, UPS, FedEx or any other COMMERCIAL SYSTEMS TO TRANSMIT SOURCE
SELECTION SENSITIVE INFORMATION: To facilitate review and evaluation for this source selection the
Government proposes to transmit data via commercial systems. Distributed material will be identified as source selection sensitive and distribution will be strictly limited to appropriate personnel, and shall be encrypted per AFFARS MP 5315.3 paragraph 1.4.2.2.3. Should any contractor object to their proprietary information being shared between source selection evaluators and advisors via commercial email as described above, please advise the either of the Contracting Specialists or the Contracting Officer using the contact information above.
2. HAND-CARRIED PROPOSALS NOTICE: Offerors are cautioned that Vandenberg AFB (VAFB) has stringent visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass and be cleared by the Government point of contact to be visited prior to entrance. A request with at least 72 hours prior to entry must be received for an offeror to gain entrance onto VAFB. If within
72 hours prior to the proposal due date and time, offerors may try and schedule a time with the points of contact to pick up the proposal at the Visitor Center. It is possible the point of contact may not be available to clear offerors for entrance or pick up proposals, which may prohibit submission of hand-carried proposals; consequently, offerors electing to hand-carry their proposals for submittal just prior to closing time do so at their own risk.
3. The proposals will be on 8 1/2” x 11” paper, white or ivory stock. Charts, tables or diagrams may not exceed 11” x 17”.
4. A page is defined as one face of a sheet of paper containing information. This includes all appendices, charts, graphs, diagrams, tables, photographs, etc, unless placed on 11” x 17” sheets, in which case they will be counted as two pages. Covers for volumes, tables of contents, indices, title pages, cross reference indices, and section dividers/tables will not be included in the page count if they are inserted solely to provide ease to the reader in locating volumes/sections of the proposal. They will be counted if they contain any other information, (e.g. diagrams, extraneous data, etc). Equipment information (i.e. cut sheets) will not mailto:Jeffrey.Grelck@us.af.mil mailto:daniel.brock.5@us.af.mil be included in the page count if provided at the end of Volume II and specifically identified as an appendix.
Pages marked “This page intentionally left blank” will not be counted.
5. Type face shall not be less than 12 font, with 1” margins on all sides. Smaller, legible font size, no smaller than 6 point, may be used for charts and tables.
6. Elaborate formats, bindings, binders, or color presentations are not desired or required. Company Name and solicitation number shall be included in the header of each page. Each binder will be labeled with the following format: FA4610-18-R-0020, COMPANY NAME, Volume I Executed Contract Documentation and Price Proposal; or Volume II Technical Proposal. See Table Below for specific number of copies and pages, etc.
TITLE # OF COPIES MAXIMUM # OF
PAGES
Volume I Executed
Contract Documentation and Price Proposal
Original (paper) and 1 electronic copy
No page limitation
Volume II Technical
Proposal
Original (paper), 1 hard (paper) copy and
1 electronic copy
25 pages
7. Electronic copies shall be identical to the hard copies submitted. The electronic copies shall be submitted on a CD or DVD only. Submission of electronic copies on other than CD or DVD media is not authorized and will result in an offeror being determined non-responsive and not eligible for award. The CD or DVD shall be clearly marked with the company name, solicitation number, and volume(s) included on the CD.
The electronic files shall be searchable documents compatible with Adobe Acrobat DC 9 and/or Microsoft
2013.
8. Proposal revisions shall conform to the requirements of this section and must be clearly marked to show the changes, on different color stock as directed by the Contracting Officer.
9. Documents submitted in response to this solicitation must be fully responsive to and consistent with the following:
a. Requirements of the solicitation, and government standards and regulations pertaining to the specification.
b. Evaluation Factors for Award in Section M of this solicitation.
c. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this Section L will be removed from the proposal and not read or evaluated.
10. The estimated magnitude of construction for this project is between $250,000 and $500,000.
D. Specific Instructions, SUBMIT THE FOLLOWING:
VOLUME I – EXECUTED CONTRACT DOCUMENTATION AND PRICE PROPOSAL
1. Chapter 1 – SF 1442. Complete applicable blanks. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through J. These sections constitute the model contract.
2. Chapter 2 – Section B. Insert the proposed price to provide a complete and usable end product in accordance with the terms and conditions stated in this solicitation. Offerors who do not comply with this requirement shall be considered unacceptable and not eligible for award.
3. Chapter 3 – Section C through J. Complete applicable blanks, the offeror shall submit only those pages that require a fill-in.
4. Chapter 4 – Section K. Complete the representations, certifications, and acknowledgments. Section K shall be returned in its entirety.
5. Acknowledge all amendments issued to the solicitation.
6. The offeror shall prepare a line item estimate detailing their individual cost elements, including but not limited to: materials, equipment, labor, overhead, profit, and bonds. The line item estimate shall be prepared and submitted in a format similar to RS Means.
VOLUME II -TECHNICAL PROPOSAL
Offerors must meet a standard in all sub-factors of the Technical Factor in order for their technical proposal to be determined “technically acceptable.” The standards are defined in Section M for each sub-factor.
1. Technical and Management Capabilities: The Offeror shall provide a narrative detailing its management approach to include risk management, logistics, mobilization, safety, quality control, and resolution of potential issues and challenges; its design approach to include an understanding of the design effort required, required permits, applicable codes and disciplines, and list of required drawings; and its construction approach to include an understanding of the construction effort required and environmental compliance as detailed in the Statement of Work.
2. Proposed Schedule: The Offeror shall provide a proposed schedule capturing all SOW requirements, execution timelines and critical path items; and demonstrates coordination of work activities, phasing, and potential weather considerations.
(End of Summary of Changes)
File details come from the government source that posted it.