FA4610-15-R-0014 Attachment 6 Design Analysis
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 9192_Electrical-Mechanical-Plumbing_Drawings.zip | ZIP file | |
| 12-1259B_RFI_Questions.docx | DOCX document | |
| Site_Walk_sign-in_sheet.._.pdf | ||
| 12-1259B_Site_Visit_Meeting_Minutes.pdf | ||
| Att_3_RMDF_9192_Plumbing.pdf | ||
| Att_5_VAFB_Facility_Excellence.pdf | ||
| Att_2_Drawings.pdf | ||
| Att_1_Specifications.pdf | ||
| Amended_Solicitation.doc | DOC document | |
| Conformed_Piping_B9192_Solicitation.doc | DOC document | |
| Att_4_CA20140023_Mod3.pdf | ||
| Original_Solicitation_12-1259B.doc | DOC document | |
| 4-30-2015_SOW_12-1259B_9192_Draft.pdf | ||
| 4-30-2015_SOW_12-1259B_9192_Draft.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100% Design Analysis Submittal
Replace Piping at Building 9192 Project No.: XUMU 12 - 1259B
Full Service Engineering & Management
Presented By
1000 E. Walnut Street, Suite 227, Pasadena, CA 91106 T 626 463 2809 / 888 900 3823 F 626 463 2739 www.schwabeng.com
Presented To Jordan Hampton
30CES/CENMP
Building 11433 1172 Iceland Avenue Vandenberg AFB, CA 93437
March 10, 2015
FA4610-15-R-0014
Attachment 6
Replace Piping at Buildings 9192 Project No.: XUMU 12-1259B
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
TABLE OF CONTENTS
SECTION A EXCUTIVE SUMMARY
SECTION B PROJECT SITE/ VICINITY MAP
SECTION C PROJECT ORIENTATION
SECTION D LIST OF EXISTING DEFICIENCIES
SECTION E LIST OF CONSTRUCTION REQUIREMENTS
SECTION F LIST OF DRAWING SHEETS
APPENDIX A BASIS OF DESIGN
APPENDIX B LIST OF TITLES AND NUMBERS
APPENDIX C ESTIMATED CONSTRUCTION PERIOD
APPENDIX D AF FORM 66 – SCHEDULE OF MATERIAL SUBMITTAL
APPENDIX E MANUFACTURER’S DATA SHEET
APPENDIX F ENVIRONMENTAL SURVEYS
APPENDIX G RECYCLED MATERIALS LIST
APPENDIX H DRAWINGS
APPENDIX I SPECIFICATIONS
APPENDIX J COMPUTER AIDED DESIGN (CAD)
APPENDIX K RECOVERED MATERIALS DETERMINATION FORM
(RMDF)
Project No.: XUMU 12-1259B 1
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
BACKCHECK 95% DESIGN SUBMITTAL
A. EXECUTIVE SUMMARY
Schwab Engineering has been tasked to evaluate the existing 3 story dormitory building’s sewer and waste drainage system back up problems.
Building 9192 was built in 1994 and is a 3 story dormitory with a single story dining/kitchen.
The single story dining / kitchen is not in the scope of work.
The backup of the sewer and waste drainage systems are currently occurring in the existing
3 story dormitory underground piping system only.
A complete investigation of the existing 3 story dormitory pipe and fittings were performed on
8-11-14 to determine if both the above and below ground pipe systems need to be replaced.
The results of the investigation has determined the only below ground pipe & pipe fittings have to be replaced.
Schwab has prepared this Backcheck 95% Design Submittal for the pipe and fitting replacement & upgrade for the dormitory only.
Project No.: XUMU 12-1259B 2
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
B. PROJECT SITE/ VICINITY MAP
DINING/
KITCHEN
(NOT IN
SCOPE)
BUILDING
DORMITORY
Project No.: XUMU 12-1259B 3
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
C. PROJECT ORIENTATION
The site visit and investigation on the existing Building 9192 (see attached aerial view of the project site) was conducted on 8/11/14 by Leonardo R. Arredondo and Doug Knight of Schwab
Engineering and Management with assistance of the Air Force PM, Jordan Hampton, phone#
(805)606-6675, also, Thomas F. Nugent II Major USAF, Adam R. Martin M Sgt. USAF, James
W. Mallory III Capt. USAF, accompanied by officer Leonil Lopez TSGT USAF. Investigation was conducted on the existing sewer and waste system back up problems.
D. LIST OF EXISTING DEFICIENCIES
The existing 3 story dormitory piping was inspected, camera video of above and below pipe
& pipe fitting was conducted.
Existing piping is cast iron waste and vent piping above and below ground.
The camera video and inspection indicated the below ground pipe and pipe fittings are worn and damaged beyond repair and need to be removed and replaced.
The above ground pipe & pipe fitting did not indicate any defects and will not have to be removed and replaced.
E. LIST OF CONSTRUCTION REQUIREMENTS
The construction shall include the following but not limited to:
Demolition of partial existing walls, floors, and ceilings, the piping below ground needs to be removed and replaced.
Sawcut / core concrete, remove concrete, trench and excavate.
Underpin existing footings where pipe sleeves will be required.
Remove existing pipe and pipe fittings.
Replace existing pipe and fittings.
Remove and replace partial walls, floor, ceilings, sleeve footing, and reinforce existing footings where pipe sleeves will be required.
Backfilling and compacting of new soil.
Testing of all pipe and fittings, along with inspection.
Project No.: XUMU 12-1259B 4
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
E. LIST OF CONSTRUCTION REQUIREMENTS (continued…..)
Points of connections to site underground utilities outside of building footprint.
Replace portions of concrete slab, replace carpet, ceramic tile, and paint finishes will be ok.
For better operation flow all the underground mains will be replaced with 6” diameter main pipe and fittings, at the exterior of the building.
For better operation the laundry waste line will be replaced with a 4” waste line, separated inside the building from the sewer main. This will keep any soap suds from accumulating inside the sewer line.
The pipe replacement and upgrade pipe sizes and design will better serve the building for future heavy use.
Project No.: XUMU 12-1259B 5
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
F. LIST OF DRAWINGS SHEETS
THE FOLLOWING NEW DRAWINGS HAVE BEEN PREPARED FOR THE 85% REMODEL
PIPE DESIGN
SHEET
NO.
DESCRIPTION REMARKS
G-001 COVER SHEET, INDEX TO DRAWINGS
P-100 PLUMBING LEGEND, SCHEDULES AND NOTES
P-101 PLUMBING SITE PLAN
P-102
PLUMBING GROUND FLOOR DEMO & REMODELS
PLAN
P-201 PLUMBING ENLARGED DEMO & REMODEL PLANS
P-202
PLUMBING RISER DIAGRAMS AND TYPICAL
PLUMBING DETAILS
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX A
ORIGINAL BASIS OF DESIGN
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
TABLE OF CONTENTS
SECTION A EXCUTIVE SUMMARY
SECTION B PROJECT SITE/ VICINITY MAP
SECTION C PROJECT ORIENTATION
SECTION D LIST OF EXISTING DEFICIENCIES
SECTION E LIST OF CONSTRUCTION REQUIREMENTS
SECTION F LIST OF DRAWING SHEETS
SECTION G PHOTOGRAPHS
SECTION H PRE-DESIGN COST ESTIMATE
SECTION I EXISTING DRAWINGS
Project No.: XUMU 12-1259B 1
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
BASIS OF DESIGN SUBMITTAL
A. EXECUTIVE SUMMARY
Schwab Engineering has been tasked to evaluate the existing 3 story dormitory building’s sewer and waste drainage system back up problems.
The existing building was built in 1994 and is a 3 story dormitory with a 1 story dining/kitchen.
The existing 3 story and 1 story dining/kitchen underground sewer and waste piping systems are independent of each other and each exit the building separately.
They are connected to the existing site underground sewer system independently.
There are 144 occupants, 36 toilet rooms and 6 residential clothes washers.
The backup of the sewer and waste drainage systems are currently occurring in the existing
3 story dormitory underground piping system only.
Project No.: XUMU 12-1259B 2
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
B. PROJECT SITE/ VICINITY MAP
DINING/
KITCHEN
(NOT IN
SCOPE)
BUILDING
DORMITORY
Project No.: XUMU 12-1259B 3
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
C. PROJECT ORIENTATION
The site visit and initial investigation on the existing Building 9192 (see attached aerial view of the project site) was conducted on 4/15/14 by Jerome Schwab and Jerry Ponce of
Schwab Engineering and Management with assistance of the Air Force PM, Jordan
Hampton, accompanied by contracting officer Patricia Rosa, contract specialist Steven
Kwak, and LT James. Investigation was conducted on the existing sewer and waste system back up problems.
D. LIST OF EXISTING DEFICIENCIES
The total count of 144 occupants having to use only 12 water closets, 12 showers, and central laundry rooms, makes the existing buildings sewer and waste system, a very high use piping system with a very low life expectancy of the pipe and fittings.
The past maintenance may have had a negative effect on the pipe and fitting. The pipe and fittings may have been flushed with draino or other caustic solutions during regular maintenance, resulting in pitting of the interior pipe and fittings.
The use of the laundry chemicals, soap, chlorine, fabric softener may have also helped in the deterioration of the pipe and fittings.
Overall the pipe and pipe fittings have endured heavy use and need to be replaced.
Existing underground pipe sizes are 4” and 6” diameter.
E. LIST OF CONSTRUCTION REQUIREMENTS
Demolition of existing walls, floors, and ceilings, we piping needs to be removed and replaced.
Sawcut/core concrete, remove concrete, trench and excavate.
Underpin existing footings where pipe sleeves exist.
Remove existing pipe and pipe fittings.
Replace existing pipe and fittings.
Replace underground with 6” diameter pipe and fittings. Separate laundry with 4” underground waste pipe and fittings. Pipe laundry separate to outside of building.
Remove and replace walls, floor, ceilings, sleeve footing, and reinforce existing footings where pipe sleeves exist.
Project No.: XUMU 12-1259B 4
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
Backfilling and compacting of new soil.
Testing of all pipe and fittings, along with inspection.
Points of connections to site underground utilities outside of building footprint.
Replace portions of concrete slab, replace carpet, and other finishes will need to be installed.
F. LIST OF DRAWINGS SHEETS
THE FOLLOWING IS A LIST OF EXISTING AS BUILT DRAWINGS THAT HAVE BEEN
REVIEWED
SHEET
NO.
DESCRIPTION REMARKS
P-4 PLUMBING PLAN GROUND FLOOR
P-5 PLUMBING PLAN SECOND FLOOR
P-6 PLUMBING PLAN THIRD FLOOR
P-13 WASTE AND VENT RISER DIAGRAM
Project No.: XUMU 12-1259B 5
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
THE FOLLOWING NEW DRAWING WILL NEED TO BE PREPARED FOR THE REMODEL
PIPE DESIGN
SHEET
NO.
DESCRIPTION REMARKS
P-1 LEGEND AND SCHEDULE
P-2 PLUMBING SITE PLAN
P-3 GROUND FLOOR DEMOLTION PLAN
P-4 SECOND FLOOR DEMOLITION PLAN
P-5 THIRD FLOOR DEMOLITION PLAN
P-6 GROUND FLOOR REMODEL PLAN
P-7 SECOND FLOOR REMODEL PLAN
P-8 THRID FLOOR REMODEL PLAN
P-9 ¼ SCALE PLANS
P-10 ¼ SCALE PLANS
P-11 WASTE AND VENT RISER DIAGRAM
P-12 PLUMBING DETAILS
Project No.: XUMU 12-1259B 6
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
G. PHOTOGRAPHS
WASTE WATER BACK
UP PROBLEM
REMOVE AND
REPLACE EXISTING
SANITARY SEWER
AND WASTE PIPE
AND FITTINGS
Project No.: XUMU 12-1259B 8
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
I. EXISTING DRAWINGS
SEPARATE
LAUNDRY
WASTE
Project No.: XUMU 12-1259B 9
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
Project No.: XUMU 12-1259B 10
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
Project No.: XUMU 12-1259B 11
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\Vandenberg Plumbing Study BOD.docx
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX B
LIST OF TITLES AND NUMBERS
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
G. LIST OF TITLES AND NUMBERS:
PROJECT TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 32 16.00 20 CONSTRUCTION PROGRESS DOCUMENT
01 33 00 SUBMITTAL PROCEDURES
01 35 60.00 20 ENVIRONMENTAL MANAGEMENT
01 45 00.00 10 QUALITY CONTROL (2/10)
01 45 00.00 40 QUALITY CONTROL
01 57 20 ENVIRONMENTAL REQUIREMENT
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 – EXISTING CONDITIONS
02 42 51 CARPET REMOVAL AND RECLAMATION
DIVISION 09 – FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX C
ESTIMATED CONSTRUCTION
PERIOD
ESTIMATED CONSTRUCTION PERIOD
Item No. Activity Start Finish Duration (Days)
1. Bid Award 1-Apr-15
2. Mobilization 1-Apr-15 13-Apr-15 12
3. Material Submittal 6-Apr-15 17-Apr-15 11
4. Material Approval 17-Apr-15 1-May-15 14
5.
Material/Equipment Procurement
4-May-15 25-May-15 21
6. Site Trenching 11-May-15 1-Jun-15 21
7. Install Site Piping 2-Jun-15 8-Jun-15 6
8. Demo Phase I 8-Jun-15 13-Jun-15 5
9. Remodel Phase I 12-Jun-15 19-Jun-15 7
10. Test & Commission Phase I 19-Jun-15 21-Jun-15 2
11. Demo Phase II 19-Jun-15 28-Jun-15 9
12. Remodel Phase II 25-Jun-15 6-Jul-15 11
13. Test & Commission Phase II 6-Jul-15 8-Jul-15 2
14. Demo Phase III 9-Jul-15 17-Jul-15 8
15. Remodel Phase III 14-Jul-15 23-Jul-15 9
16. Test & Commission Phase III 24-Jul-15 25-Jul-15 2
17. Demo Phase IV 25-Jul-15 31-Jul-15 6
18. Remodel Phase IV 30-Jul-15 8-Aug-15 9
19. Test & Commission Phase IV 8-Aug-15 10-Aug-15 3
20. Clean-up 11-Aug-15 13-Aug-15 2
21. Closeout 14-Aug-15 20-Aug-15 6
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX D
AF F0RM 66
SCHEDULE OF MATERIAL
SUBMITTAL
APPROVED DIS- APPROVED
1 22 00 00, PART 1.02 - SUBMITTAL 6
2 22 00 00, PART 2.01 - MATERIALS 6
3 22 00 00, PART 2.02 - MATERIALS 6
22 00 00, PART 3.04 - TEST
REPORTS
REMARKS
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
R E
C O
R D
S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
O
M M
A N
U A
L S
C A
T A
L O
G D
A T
A
IN
S
T R
U C
T
IO
N S
D
E S
IG
N
D A
T A
R E
P O
R T
S /P
L A
N S
S C
H E
D U
L E
S
C L
O S
E O
U T
S U
B M
IT
T
A L
S
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
DATE CONTRACTOR
NOTIFIED
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
SCHEDULE OF MATERIAL SUBMITTALS
REPLACE PIPING AT BUILDINGS 9192 TO BE COMPLETED BY CONTRACT ADMINISTRATOR
AF Form 66, OCT 00 1
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX E
MANUFACTURER’S DATA SHEET
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
H. MANUFACTURER’S DATA SHEET:
No Manufacturer’s Data Sheet included in this submittal
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX F
ENVIRONMENTAL SURVEYS
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
I. ENVIRONMENTAL SURVEYS:
Environmental survey was not conducted for this project.
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX G
RECYCLED MATERIALS LIST
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
J. LIST OF RECYCLED MATERIALS:
1. Cast iron pipes
2. Water Closets
3. Flush valves
4. Floor Drains
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX H
DRAWINGS
(SEE ATTACHED HARD COPIES)
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX I
SPECIFICATIONS
(SEE ATTACHED)
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX J
COMPUTER AIDED DRAFTING (CAD)
(SEE ATTACHED DISK)
P:\22Admin\Pasadena\TTG Project Folders\2014\0214446.00 - VAFB - XUMU 12-1259B - Repl Piping at Bldg 9192\Reports\95% Design Submittal\VAFB Bldg 9192 95% Design Submittal.docx
APPENDIX K
RECOVERED MATERIALS
DETERMINATION FORM (RMDF)
File details come from the government source that posted it. Updated .