2015__0413_-_C2F_FFO_-_PWS.docx

DOCX document 99 KB Posted

Attached to
USSTRATCOM Command and Control Facility, Furnishings Fit-out Federal contract opportunity
Solicitation number
FA4600-15-R-0013
Issued by
Department of the Air Force Air Combat Command

About this file

PWS Update - Section 2.9 has been added addressing security requirements supporting the release of CID documents.

View the file

Other files for this federal contract opportunity

Other files attached to USSTRATCOM Command and Control Facility, Furnishings Fit-out, newest first.
File Type Posted
FA4600-15-R-0013_C2F_FFO_Post_IEB_QA7.pdf PDF
FA4600-15-R-0013_C2F_FFO_Post_IEB_QA6.pdf PDF
FA4600-15-R-0013-0006.pdf PDF
FA4600-15-R-0013_C2F_FFO_Post_IEB_QA5.pdf PDF
FA4600-15-R-0013_C2F_FFO_Post_IEB_QA1.pdf PDF
FA4600-15-R-0013-0007.pdf PDF
J2__C2F_FFO_Pricing_Model_FA4600-15-R-0013-0006.xlsx XLSX spreadsheet
FA4600-15-R-0013-0005.pdf PDF
FA4600-15-R-0013_C2F_FFO_FBO_RFP_QA7.pdf PDF
FA4600-15-R-0013_C2F_FFO_RFP_QA6.pdf PDF
J2__C2F_FFO_Pricing_Model_FA4600-15-R-0013-0004.xlsx XLSX spreadsheet
FA4600-15-R-0013-0003.pdf PDF
FA4600-15-R-0013-0002.pdf PDF
FA4600-15-R-0013_C2F_FFO_RFP_QA5.pdf PDF
FA4600-15-R-0013_C2F_FFO_FBO_RFP_QA4.pdf PDF
FA4600-15-R-0013-0001.pdf PDF
FA4600-15-R-0013_-_C2F_FFO _RFP_Q A_2.pdf PDF
J4._Certificate_of_Insurance.doc DOC document
J2._C2F_FFO_Pricing_Model.xlsx XLSX spreadsheet
A002.pdf PDF
J1_-_CID_-_How_to_obtain.docx DOCX document
A004.pdf PDF
A005.pdf PDF
J13.__PPQ_Cover_Letter.docx DOCX document
A001.pdf PDF
J12._Past_Performance_Information_(PPI)_Document.doc DOC document
J5._Certificate_Pertaining_to_Foreign_Interests_SF328.pdf PDF
J15._Past_Performance_Tracking_Record.docx DOCX document
J10 _Wage_Determination_2005-2325-16.pdf PDF
J7._DODI_8582.01.pdf PDF
A003.pdf PDF
J8._DODM_5200.01 _Vol._4.pdf PDF
J6._NDA_Agreement.docx DOCX document
J14._Past_and_Present_Performance_Questionnaire.docx DOCX document
FA4600-15-R-0013.pdf PDF
FA4600-15-R-0013_Update_8_Sep_15.pdf PDF
FA4600-15-R-0013_QA6.pdf PDF
FA4600-15-R-0013_C2F_FFO_QA5.pdf PDF
FA4600-15-R-0013_C2F_FFO_QA4.doc.pdf PDF
C2F_FFO_PWS_-_2015_0611.pdf PDF
FA4600-15-R-0013_DRAFT_Pricing_Model.xlsx XLSX spreadsheet
C2F_FFO_NOTICE-new_documents_and_updates.pdf PDF
Draft_Section_L_-_2015_0713.pdf PDF
FA4600-15-R-0013_C2F_FFO_QA2.pdf PDF
FA4600-15-R-0013_C2F_FFO_PWS_June_2015.pdf PDF
FA4600-15-R-0013_C2F_FFO_CID_Update.pdf PDF
FA4600-15-R-0013_C2F_FFO_RFI.pdf PDF
2015_0420_-_C2F_FFO_PWS.docx DOCX document
DODM_520001_vol4.pdf PDF
Contractor_Validation.xls XLS spreadsheet
Show all 50

USSTRATCOM Command and Control Facility, Furnishings Fit-out has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement for

Command and Control Facility, Furnishings Fit-out (C2F FFO) and Furnishings Support

By

United States Strategic Command / J43 Engineering and Facilities Management Division

XX Month 2014

C2F FFO PWSUSSTRATCOM C2F - J43 Support13 April 2015
Draft Report 1AE 8010October 9, 2009ii

TABLE OF CONTENTS (Continued) Chapter Topic Page

TABLE OF CONTENTS

LIST OF SYMBOLS AND ACKRONYMS USEDiv
1 INTRODUCTION1
1.1BACKGROUND1
1.2CONTRACT INTENT1
1.3Contract Style1
2 GENERAL REQUIREMENTS2
2.1Contract Structure2
2.2Submittals3
2.3Reference Documents9
2.4Fit-out Schedule9
2.5Coordination with Other Trades10
2.6Space Layout Design11
2.7Mandatory Use Programs11
2.8USSTRATCOM Site Conditions11
2.9Sensitive Documents Required for Bid and Performance12
3 GENERAL FURNISHINGS REQUIREMENTS14
3.1Installation Services14
3.2Field Measurements14
3.3Furniture Purchase14
3.4Submittals14
3.5Delivery, Storage and Handling18
3.6Certified Installers And Licensed Electricians18
3.9Alternate Design18
3.10Warranty19
4 GENERAL FURNISHINGS PRODUCTS21
4.1 Reference To Manufacturer Names And Colors21
4.2 Furniture21
4.3 Furniture Layout24
5 GENERAL FURNISHINGS EXECUTION25
5.1INSTALLATION PROCEDURES25
5.2BUILDING PROTECTION26
5.3AREA DEMOBILIZATION26
6 SYSTEMS FURNITURE REQUIREMENTS27
6.1SYSTEM DESCRIPTION27
6.2SUBMITTALS30
6.3QUALITY ASSURANCE31
6.4Delivery, Storage, And Handling33
6.5Warranty34
6.6Modular Wiring System34
7 FIT-OUT QUALITY CONTROL37
7.1Submittals37
7.2General Requirements37
References38
Attachment 1: Security Documents41
Attachment 2: FFO Delivery Process41

C2F FFO PWS USSTRATCOM C2F - J43 Support 13 April 2015 viii

Space Management USSTRATCOM C2F - J43 Support 13 April 2015 ix

LIST OF SYMBOLS AND ACKRONYMS USED

A/E=Architect / Engineer
AO=Action Officer
B500=The term used for the current STRATCOM facility. B500 includes: B500, B501, B522, B515, and B597. Ancillary support buildings include: the visit center, the cooling towers, the generator plant,. These ancillary support facilities are provided in the B100 facility.
B1000=The term used for the C2F total facility. B1000 includes MILCON buildings: HEMP, Mission support (both towers), visitors center, dock, and cooling towers. B1000 also includes the vehicle control gates and parking lots.
C2F=Command and Control Facility; B1000
CID=Comprehensive Interior Design
CO=Contracting Officer
COR=Contracting Officer’s Representative
CQC=Contractor Quality Control
CY=Calendar Year
FFO=Furnishings Fit Out
HDR=Architecture and Engineering Firm Name
J43=USSTRATCOM/J43: Engineering and Facilities Management Division.
MILCON=Definition: Military Construction. Primary use: the USSTRATCOM PMO division responsible for B1000 facility construction. Alternate use: B1000.
MSDS=Material Safety Data Sheets
PMO =Definition: Program Management Office. Use: the USSTRATCOM directorate responsible for the Command transition into the new facility.
PMO/Transition= The PMO Division responsible for ensuring coordination, risk and quality control, across all USSTRATCOM transition activities
PWS=Performance Work Statement
SE=Submittal Exchange software platform
USACE=United States Army Corps of Engineers

USSTRATCOM = Definition: United States Strategic Command.

C2F FFO PWS USSTRATCOM C2F - J43 Support 13 April 2015 iv

C2F FFO PWS USSTRATCOM C2F - J43 Support 13 April 2015 12

Chapter 1

1 INTRODUCTION

1.1 BACKGROUND

The United States Strategic Command (USSTRATCOM) will transition to a facility currently under construction. The Comprehensive Interior Design (CID) calls for approximately 15,000 individual items, of approx. 400 item types to be purchased and installed.

1.2 CONTRACT INTENT

The intent of the contract not only to furnish the new facility, but to do so with professional project management, high quality, flexibility, and adaptability.

Project management and quality are directly addressed in the content of this PWS. Flexibility and adaptability will be achieved in the nature of this contract. All items of work will be pre-priced; purchase orders will be released for combinations of these items matching the space requirement and timing of a ‘wave’. Waves will be worked in series or parallel until the facility is completely furnished.

After the successful furnishing of the new facility, the contract will shift into Furnishings Support. When a mission requirement requires furnishing alteration, the Contractor will provide labor and materials to execute the alteration.

1.3 Contract Style

The structure of this contract is adapted from construction contracts. The PWS is analogous to a construction project's 'Combined Project Manual', the submittal process and supporting software is built for construction projects, and the CID represents the plans and specifications of construction. The above is mentioned to plainly identify the source of potential terminology confusion and the identify bias towards construction terminology.

Chapter 2

2 GENERAL REQUIREMENTS

2.1 Contract Structure

The scope of this contract is broken down into two distinct categories: Furnishings Fit-out, and Furnishings support. Due to transition schedule, it is possible to be in FFO stage in parts of the facility and support stage in others within the duration of this contract.

2.1.1 Furnishings Fit-out (FFO)

The contract will initiate in the FFO stage. In this stage, the Government and Contractor will partner to finalize space layouts (see Sections and 2.6, 3.4.2, and 6.2.1). The final space layouts will be packaged into smaller sub-sections, called waves. Item quantities will be totaled for each wave, matched to the line item cost multiplied, and totaled.

The Government reserves the right to change the quantity of line items and/or timing of each wave between solicitation/award and the issuance of the delivery order for said wave based on the requirements of PMO/Transition and the space occupants. The Contractor shall incorporate all changes into their project execution.

The FFO stage will be complete for a delivery order when all spaces requiring furnishings are successfully completed per the Contractor Quality Control (CQC) plan (see Chapter 7).

2.1.2 Furnishings Support

USSTRATCOM requires support for furnishings break/fix (trouble ticket) and furnishings alteration projects. The Contractor will perform these duties in addition to the warranty work as described in Sections 3.10 and 6.5.

2.1.2.1 Furnishings Break/fix

The Contractor will provide labor to repair/restore furnishings to full functionality within two hours of notice an issue on days where a furniture crew is on-site due to a furnishings alteration project. When the Contractor is not on-site, repair shall be made within five business days. The Contractor shall provide the COR with written explanation of why the above restoration time cannot be achieved prior to expiration, as required, per trouble ticket.

To minimize inoperable time to the user, the Government will fund four (4) man-hours worth of repair when the project enters the Furnishings Support stage. The Contractor will document the number of manhours spent on each issue and submit to the COR. The Government intends to keep the balance at four hours for the life of the contract via supplemental payments.

All trouble ticket work will be repaired via item warranty until the expiration thereof.

2.1.2.2 Furnishings Alteration Projects

In general, the execution of a future project will require the same work items identified in this PWS as the FFO stage.

The Contractor will provide design services, procurement/logistical support, and furnishing installation for the scope identified by the Government.

2.1.2.3 WAREHOUSE MANAGEMENT

The Contractor will be responsible for maintaining an accurate inventory of all furnishings items in USSTRATCOM warehouses. Inventories show all components required to assemble furnishings and all individual items. The Contractor will provide the inventory to the COR on a monthly basis and as requested.

2.2 Submittals

The Government intends to use the Textura Corporations software platform Submittal Exchange (SE). All submittals to the Government will be sent via this system. When submiting a physical sample (or anything that cannot be submitted electronicly), electronic documentation of the submittal will be placed into SE. Textura group will enter the required submittals and approval flows into SE; however, the Government and Contractor will jointly verify that all required submittals are covered. The Government and Contractor will work together to established a shared understanding of the submittal process and required submittals.

The Government is working to certify Submittal Exchange as a Software-as-a-Service, per the pertinent DOD guidelines. In the event Submittal Exchange fails to be certified, the Contractor must be prepared to execute submittals in the traditional fashion. Traditional submittal process shall be objective based: successful submittal exchange and documentation of approvals. Therefore the Government will not dictate the means and methods (hard or soft copy, etc).

The Contractor is responsible for total management of his work including approval, scheduling, control, and certification of all submittals. The Contractor's submittal process shall be a complete system to provide verification to the Government that the quality of materials, equipment and workmanship provided by manufacturers, fabricators, suppliers and subcontractors meet CID specifications. The Contractor shall review each submittal for contract compliance. This review is based on the PWS and CID drawings and specifications. Submittals that comply will be forwarded to the Government. No procurement or installation activities are to be performed until required approvals of applicable submittals have been made.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the PWS and CID.

A notation shall be made on each shop drawing submitted as to the item's specific use, either by the particular type number reference in the CID; or in the PWS: by a reference to the applicable paragraph of the PWS, or by a description of its specific location.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor shall internally check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

2.2.1 Deviations

Shop drawings shall represent the equipment and material requirements as specified herein and in the CID. Where shop drawings deviate from the specifications or drawings, the Contractor shall inform the Contracting Officer in writing and clearly indicate the deviations and the reasons therefore. Such deviations shall be evaluated and, if accepted, will be processed as a modification to the contract. The contract PWS and CID shall govern over shop drawings, even though approved by the Government, where the Contractor has not identified a deviation to the Contracting Officer. In such cases, the Contractor will be required to comply with the contract specifications and drawings at no additional cost to the Government.

2.2.2 Variations

Variations from contract requirements require Government approval pursuant to contract Clause FAR 52.251-?? and will be considered where advantageous to Government.

2.2.2.1 Considering Variations

Discussion with Contracting Officer prior to submission, after consulting with the COR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, specifically mention the potential savings in the transmittal letter.

Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal/replacement of such items at no additional cost to the Government.

2.2.2.2 Proposing Variations

When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.

2.2.3 Submittal Register and Requirements

Submittal Exchange will be used as the submittal register.

Prepare and maintain submittal register, as the work progresses. Maintain a submittal register for the project in accordance with Chapter 7 Fit-out Quality Control. The Government will provide the initial submittal register in electronic format.

2.2.3.1 Submittals for Government Approval

Hard copy Submittals are to be submitted in two (2) copies. Copies are to be mailed, or hand delivered, directly to the address shown below using the transmittal form.

USSTRATCOM J43, ATTN: Andrew Klein 901 SAC Blvd, Ste 1B15 Offutt AFB, NE 68113

55 CONS LGCZ, ATTN: Eric Mahawold 101 Washington Sq Bldg 40 Offutt AFB, Nebraska 68113-2107

Submit each required submittal, which is in the form of a drawing, as one (1) soft copy prints of the drawing. Drawing prints are to be either blue or black line permanent-type prints on a white background or blueprint and shall be sufficiently clear and suitable for making legible copies.

Catalog cuts and other descriptive data which have more than one model, size, or type or which shows optional equipment must be clearly marked to show the model, size, or type and all optional equipment which is provided. Submittals on component items forming a system or that are interrelated are to be submitted at one time as a single submittal in order to demonstrate that the items have been properly coordinated and will function as a unit.

2.2.3.2 Certificates of Compliance

Each certificate must be signed by an official authorized to certify in behalf of the manufacturing company and contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates must contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification is not to be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

2.2.3.3 Purchase Orders

Copies of purchase orders are to be furnished to the Contracting Officer when the Contractor requests assistance for expediting deliveries of equipment or materials, or when requested by the Contracting Officer for the purpose of quality assurance review. Each purchase order issued by the Contractor or his subcontractors for materials and equipment to be incorporated into the project are to (1) be clearly identified with the applicable GSA contract number, (2) carry an identifying number, (3) be in sufficient detail to identify the material being purchased, (4) indicate a definite delivery date.

2.2.3.4 Operation and Maintenance Data/Manuals

Where required by this PWS or in the CID, operations and maintenance data/manuals are to be provided by the Contractor in two (1) hard copies and one (1) electronic copies (via SE ), unless directed otherwise. Provide legible hard copies of the operations and maintenance data that are assembled in three-ring binders with index and tabbed section dividers and having a cover indicating the contents by equipment or system name and include the project title and location. The legible electronic copies of the operation and maintenance data via SE are to be in a Adobe Acrobat .PDF format (latest version) and be organized using bookmarks that define the contents by equipment or system name and includes Project Name and Location, unless directed otherwise by the Contracting Officer. Each operation and maintenance manual must contain a copy of all warranties. The Operations and Maintenance Data are to be shown as a separate activity on the Contractor prepared construction schedule bar chart or network analysis system. In addition, all wiring and control diagrams and approved system layout drawings must be submitted and included with the O&M Data.

2.2.3.5 Interior/Exterior Finish Sample and Data

All submittals regarding color boards (furnishing finish samples and data) are to be submitted as one combined submittal. These color boards are in addition to the samples required under the specific technical specifications listed as "samples".

Color boards must clearly identify what finish applies to what furnishing item using the item designator corresponding to the CID.

2.2.3.6 Scheduling

Schedule and submit concurrently all submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time.

2.2.3.7

Not used.

2.2.3.8 Disapproved Or Rejected Submittals

Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work.

2.2.3.9 Approved/Accepted Submittals

The Contracting Officer's approval or acceptance of submittals is not be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work.

After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

2.3 Reference Documents

2.3.1 Publications

The publications listed in the References section of this document form a part of this PWS to the extent referenced. The publications are referred to within the text of this PWS by designation only. The CID attachments, reference these publications either by designation or full name. Additional publications are listed in the CID and must be included to the extent referenced. All referenced publications shall be the latest release of the applicable code (to account for releases occurring after the PWS was written).

2.3.2 Comprehensive Interior Design (CID)

The execution of this contract is heavily dependent on the CID. The CID provides the quantities, locations, and specifications of the furnishings required to outfit and maintain the C2F.

The CID Package includes the following:

- Item Code Legend

- Furniture Drawings

- Typical Workstation Drawings

- Typical Technical Workstation Drawings/Elevations

- Typical Work Bench Drawings/Elevations

- Typical Reception Counter Drawings/Elevations

- Typical Collaborationstation

- Furniture Location Plan

- Furniture Illustrations

- Procurement Information

- Upholstery/Finish Color Boards

- Transition Waves Areas with Installation Timelines

2.4 Fit-out Schedule

The Contractor will prepare and maintain a project schedule. The project schedule will include all sources of product, material lead times, installation duration, installation crew size, drop dead date for purchase orders, be broken down into waves, and other pertinent information required to professionally execute the C2F FFO project AND coordinate/partner with the Government.

The Contractor will prepare a draft schedule and present to the Government for review and approval. The Contractor shall incorporate additional details as the Government requires, even after initial approval. The Contractor shall add/remove or otherwise revise information in the schedule, the layouts of the schedule as directed by the Government to understand the FFO activities and how they interact with other Transition activities.

The Government may request digital copies of the project schedule and any updates. The Contractor and Government will negotiate the filetype of schedule.

To coordinate various activities requiring Government support (i.e. throughput of the base vehicle inspection), the Government will need to be informed of the quantity of deliveries; ie number of trucks and anticipated arrival date. The Contractor will share information as required/requested. The Government may request changes to the Contractor’s logistical plans, see section 2.5.

The Contractor will hold/attend progress meetings. Some will be dedicated to the furnishings effort. The QCP shall include who attends (from Contractors firm, any subcontractors, and requested Government personnel) the FFO dedicated meetings.

Contractor personell may be requested by the Government to attend other meetings that will include multiple C2F transition stakeholders, see section 2.5.

2.5 Coordination with Other Trades

The Contractor will be expected to coordinate with the Government (multiple agencies) and multiple other contractors; to become part of the program team. Each group in the program team will need to communicate with one another to ensure proper sequencing of events and optimized use of constrained resources (such as docks, elevators, etc).

2.5.1 Communication with other Government and Government-contractor Personnel.

Any decisions adjusting the performance of this contract must be approved by the COR. To emphasize, other Government personnel may not alter any agreements, schedules, furniture layouts/quantities, etc.

2.6 Space Layout Design

The Contractor will be responsible for adjusting the furnishings layout to account for the winning product line’s true dimensions.

The Contractor will also make adjustments to quantity and/or configuration/layout from what is provided in the CID to what the user requires in the space.

2.7 Mandatory Use Programs

The Contractor will utilize all Air Force Commodity Council mandatory use programs operational at the time of project advertisement. The contractor will prepare procurement packages per the applicable program’s regulations; consolidate/organize responses and present to the Government for furnishing item approval via submittals outlined throughout this PWS.

The USSTRATCOM has received [at time of draft RFP, waiver is request only] immediate and indefinite waiver from the FCC seating program as of XX YYY ZZZZ [date].

For Furnishing Alteration Projects: the contractor shall prepare a waiver request to the FCC with the intent of maintaining a standard set of equipment for USSTRATCOM. The Government will assist in this process and submit to the FCC.

2.8 USSTRATCOM Site Conditions

USSTRATCOM security guidelines do not allow for cell phones to be brought into either B500 or B1000. Other Portable Electronic Devices, such as laptops, MAY be allowed into the facilities given approved justification and mandated/confirmed PED setting configurations.

USSTRATCOM may provide administrative space for up to three Contractor personnel in a neighboring building (not subject to the cell phone and PED caveats above); details are being finalized at the time of PWS development.

All Contractor staff will be required to possess base access credentials, B500 access credentials, and B1000 access credentials. It is likely that these will be three separate credentials obtained from three separate offices. It is the Contractors responsibility that all Contractor personnel receive and maintain these access credentials. The Government will provide initial guidance on the access request process.

USSTRATCOM will provide a dumpster location on the B1000 site, if desired, to support the trash removal requirement, section 5.3. USSTRATCOM will provide a receipt/staging/depalletization area to support the just-in-time delivery, see Section 3.5.

2.9 Sensitive Documents Required for Bid and Performance

All drawings and specifications pertaining to the B500 complex and the B1000 complex are ‘For Official Use Only’ (FOUO). The scope given in this PWS directs that the Contractor use FOUO documents to create additional FOUO documents. Therefore, compliance with Governmental guidance on handling unclassified but sensitive information is mandatory. Specific guidance are listed below.

The prime contractor shall be responsible for compliance to the below guidance of all sub-contractors and/or employees supporting the C2F FFO. The Government may require any of the below forms to be submitted by major sub-contractors.

2.9.1 Certificate Pertaining to Foreign Interests: Standard Form (SF) 328, included in Attachment 1, must be completed and submitted prior to obtaining FOUO documents. The form shall be signed by the company president or general manager on behalf of the company and employees. Companies will require approval from Government security representatives prior to obtaining FOUO documents. The Government reserves the right to deny a bidder FOUO documents, establishing the bidder as unqualified to perform the scope of this contract.

2.9.2 Nondisclosure Agreement: Attachment 2 must be completed and submitted prior to obtaining FOUO documents. This nondisclosure agreement (NDA) was developed for any contractor working with information pertaining to the B1000 complex. The NDA will also apply to the B500 complex information for the purposes of this contract. The form shall be signed by the company president or general manager on behalf of the company and employees.

2.9.3 DOD Guidance: Two DOD publications outline specific measures concerning the handling, transmittal, and disposal of information/material not intended for public release. The contractor shall comply with and actively engage in all measures outlined in the below publications. Failure to do so shall be considered a breach of the nondisclosure agreement, see section 2.9.2.

2.9.3.1 DODI 8582.01: The contractor shall reference Enclosure 3 of Attachment 1 for handling soft copy materials.

2.9.3.2 DODM 5200.1, Volume 4: The contractor shall reference Enclosure 3, paragraph 2.e of Attachment 1 for handling hard copy materials.

2.9.4 Contractor Validation Data: The winning bidder shall be required to complete data entry pertaining to their own company, any subcontractors, and any subcontractors to each subcontractor, and major suppliers of materials and services to each. Failure to complete the form in good faith to represent the total contractor’s team shall be considered a breach of the NDA, see section 2.9.2. The Contractor shall use the formatting provided in Attachment 1.

2.9.5. Products may not be labeled in a way that refers to sensitive missions or equipment, special access controls, or similar designations. Generally this requirement is to interpreted as only labeling products with room number only.

Chapter 3

3 GENERAL FURNISHINGS REQUIREMENTS

3.1Installation Services
The contractor shall provide installation services for furniture, to include installation drawings, installation instructions, purchase of furniture, field measuring, shipping and delivery coordination, receiving, inspection, submitting and processing freight and warranty claims, unpacking, storing, assembly, installation, phasing and other related activities or tasks.Contractor shall develop project timelines, establish shipping, receiving and installation dates and hold at a minimum weekly team meetings, to include Contracting Officer Representative and the Contractor's Project Manager (see section 7.2), to brief the project team. Contracting Officer shall be notified immediately of any scheduling problems such as non-availability of fabric or other conditions which may cause delays, and recommend available substitutes or solutions. Substitutes and solutions shall comply with the specification and shall be approved by the Contracting Officer.

3.2 Field Measurements

Before purchasing furniture and performing the work, the Contractor shall verify dimensions in the field and shall advise the Contracting Officer of any discrepancies, to include concerns with NFPA 70, NFPA 101 and 36 CFR 1191.

3.3 Furniture Purchase

Contractor shall be responsible for the purchase of the furniture, including checking accuracy of all acknowledgements and schedules from manufacturers and making necessary corrections to insure that the manufacturer has a correct understanding of the order and requirement. Provide competitive open market procurement where applicable. Provide procurement per Air Force Furniture Commodity Council mandatory use programs where applicable. Any GSA information provided is FOR INFORMATIONAL PURPOSES ONLY. The furniture purchased shall be available on GSA Schedules to assist the User with future purchases not related to this contract. GSA Schedule information can be found at www.gsaelibrary.gsa.gov/ElibMain.

3.4 Submittals

3.4.1 [Not Used]

3.4.2 Shop Drawings - Installation Drawings

Drawings shall include furniture layout drawings and shall show locations of electrical, communications/data, if applicable. Drawings shall be at scale appropriate for purpose as approved by COR. Critical dimensions shall be noted. All furniture shall be coded with furniture item code as indicated on the drawings and as specified in the CID Package.

3.4.3 Shop Drawings - Grommet and Wire Management Locations

Locations of grommets and wire management shall be provided

3.4.4 Product Data – Warranty

Provide manufacturer's warranty information for all furniture items

3.4.5 Product Data - Manufacturer's Data

Manufacturer's data for all furniture items, data shall be composed of catalog cuts, brochures, product information, etc. illustrating compliance with specifications. Include GSA schedule information to confirm that items are available on GSA schedule. Tag product data sheets with applicable furniture item code and name.

3.4.6 Product Data – Installation Instructions

Provide installation and assembly instructions.

3.4.7 Product Data – Manufacturer's Style Options

Three copies of data for style option selections when necessary. This applies to but is not limited to furniture items that have different edge details, hardware options and finishes, etc.

3.4.8 Samples - Furniture

3.4.8.1 Provide samples of all furniture finishes and fabrics. Samples shall be actual samples, not photographic representations; size shall be a minimum of 3 inch x 3inch. If necessary, sample shall be larger to clearly represent patterns. The samples shall be clearly marked with furniture item codes and names, manufacturer name and color information. Fabric samples shall also be labeled with fiber content and double rub testing information.

3.4.8.2 Provide a mock-up of executive workstation type WSE01. Executive workstation shall reflect approved finishes and fabrics. Locate the mock-up installation at an off-site location approved by the Contracting Officer at the time of the mock-up order. Executive workstations for the project shall not be ordered until the mock-up has been approved. Review of the mock-up may result in adjustments to the product, layout and finishes. The approved mock-up can be used in installation. Coordinate mock-up installation with the mock-up of Systems Furniture and the CID Package

3.4.9 Certificates – Certified Installers

When recommended by the furniture manufacturer, manufacturers certification stating that dealer is an authorized dealer and has a certified installation crew that will be used on this project

3.4.10 Certificates – Furniture

Manufacturers certification stating that furniture meets the specifications.

3.4.12 Operation and Maintenance Data – Installation Instructions Provide three sets of installation and assembly instructions. Maintenance Manuals. Provide three sets of maintenance manuals describing proper cleaning and minor repair procedures, including cleaning instructions for upholstery fabrics.

3.4.13 Operation and Maintenance Data – Tools

Three sets of special tools necessary for assembly of furniture and components from each manufacturer shall be furnished.

3.4.14 Operation and Maintenance Data – Furniture Drawings

One paper copy of drawings and one electronic copies of furniture drawings representing installed furniture layout. Layout shall reflect actual installation and include all amendments and modifications. Electronic copies shall be submitted in the most current version of pdf. Electronic copies in AutoDesk Revit will be required as as-builts once a wave is accepted. Drawings shall include furniture layout and locations of electrical/data and comm. Drawings shall be at scale appropriate to the purpose, as approved by the COR. Critical dimensions shall be noted. All furniture shall be coded with furniture item code identified on the drawings and as specified in the CID Package.

3.4.15 Operation and Maintenance Data – Furniture Listing

One digital copy of the complete listing of furniture provided. Listing shall include furniture item code as specified on the drawings and in the CID Package, part/model numbers, upholsteries and finishes for all components furnished. Listing shall be organized by manufacturer and product line and shall provide building totals. This list shall include all modifications made during installation.

3.4.16 Submit detail drawings as specified below.

Drawing requirements, which are the furniture manufacturer's responsibility, shall be provided as a single submittal. Provide electronic drawings to the user for future re-configuration. The electronic drawings shall include all modifications made during installation. As a minimum, submit the following:

3.4.16.1 Executive workstation, technical workstation and workbench plan view and elevations: Dimensioned executive workstation, technical workstation and workbench plan view and elevations showing each type of workstation/workbench and all components identified with manufacturer's catalog numbers. Plan view and elevations shall show location of under shelf and under overhead task lights and personal task lights (desk lamp) if applicable. Drawings shall be at scale appropriate to the purpose, as approved by the COR.

3.4.16.2 Powered tables plan view and elevations: Dimensioned plan view and elevations showing each type of powered table, indicating location and configuration of power units, configuration, quantity, location and type of electrical and communication/data receptacles within the power unit, size and location of bases and location of cable management raceway under table top and within the base units. All components shall be identified with the manufacturer's catalog numbers. Plan view and Elevations shall be at scale appropriate to the purpose, as approved by the COR.

3.4.16.3 Grommet and wire management capacity drawings and locations where applicable.

3.5 Delivery, Storage and Handling

Contractor shall be responsible for the delivery, storage and handling of all furniture. Storage will not be available on site. Furnishings may be stored at an off-site location; the Contractor will not be reimbursed for the cost of storage.

Furnishings are to be delivered just-in-time with respect to the installation of the items. No space will be provided for long-term storage of furniture items. Furniture items are to be removed from delivery trucks and brought to the installation space as soon as possible. Pallets will not be able to enter the respective staff spaces, see Section 2.8, due to the 3'-0" door frames.

3.6 Certified Installers And Licensed Electricians

When recommended by the furniture manufacturer, furniture shall be installed by an authorized dealer with a certified installation crew.

All furniture requiring hardwiring shall be completed by a licensed electrician provided by the Contractor, the certified installers shall be on site if questions arise. See paragraph 5.1 INSTALLATION PROCEDURES and the CID Package for additional electrical requirements.

3.9 Alternate Design

Manufacturers who are unable to provide desk configurations and filing/storage that conform exactly to the furniture layouts shown in the contract drawings and specifications may submit alternate designs for consideration by the Contracting Officer. Alternate designs must meet or exceed the following criteria. Alternate designs that are submitted but do not meet these criteria will be rejected.

3.9.1 Desk Size and Configuration

The alternate design shall provide desks of the same basic size and configuration shown, with only the sizes of the individual components within the workstation changed to meet the standard product of the manufacturer.

3.9.2 Filing/Storage Size and Configuration

The alternate design shall provide filing/storage of the same basic size and configuration shown, with only the size changed to meet the standard product of the manufacturer. The storage capacity shall not be reduced.

3.9.3 Furniture Requirements

The furniture provided shall comply with the drawings, specifications and the requirements identified in the CID Package.

3.9.4 Layout

The storage capacity, number of workstations, number of persons accommodated and width of aisles shall not be reduced. The function of the furniture and the room shall not be changed and, the room will remain functional. Access around furniture in private offices, classrooms, etc. shall not be reduced.

3.9.5 Manufacturer's Style Options

The alternate design shall provide style options such as edge details, hardware options and finishes of the same basic style and finish as shown in the CID Package.

3.10 Warranty

Manufacturer's performance guarantees or warranties shall be for single-shift service and shall include parts, labor and transportation as follows, unless otherwise noted:

Desks - 10 year minimum Seating, unless otherwise noted - 10 year minimum Pneumatic Cylinders - 5 years Stacking Chairs - 10 year minimum Lectern/Podium - 3 years Lobby Seating - 10 years Fabric - 3 years minimum Filing and Storage - 10 year minimum Folding Tables - 5 years End Tables - 5 years Items not listed above - 1 year minimum (unless noted in the CID Package)

If manufacturers' standard performance guarantees or warranties exceed the minimum requirements listed above that guarantee or warranty shall be provided.

Contractor may submit alternate warranty given information on cost savings as described in section 2.2.2.

Chapter 4

4 GENERAL FURNISHINGS PRODUCTS

4.1 Reference To Manufacturer Names And Colors

Where product and color is shown as being specific to one manufacturer in the CID package, an equivalent color or product by another manufacturer may be submitted for approval. Manufacturers, style lines, model numbers, finish and upholstery information are provided to establish design intent and are not intended to limit the selection of equal products and colors from other manufacturers.

4.2 Furniture

Furniture shall be provided from manufacturer's standard product line (unless otherwise noted in the CID Package) as shown in the manufacturer's most recent published price list and/or amendment. Furniture provided shall be intended for commercial use not residential. Furniture shall meet or exceed ANSI/BIFMA testing:

a. ANSI/BIFMA X5.1 - General Purpose Office Chairs

b. ANSI/BIFMA X5.5 - Desk Products

c. ANSI/BIFMA X5.9 - Storage Units

4.2.1 Construction

a. There shall be no rough or sharp edges or exposed connections. Clips, screws, and other construction elements shall be concealed wherever possible.

b. Desks, storage and tables shall have leveling devices to compensate for uneven floors.

c. The underside of desks and tables shall be completely and smoothly finished.

d. See CID Package for complete furniture and executive workstation specifications and additional construction information.

4.2.2 Casters and Glides

Casters and glides shall be appropriate for the floor material they are located on. Universal casters that are appropriate for both hard surface flooring and carpet are preferred.

4.2.3 Upholstery

a. Fabric upholstery for seating shall comply with a minimum of 45,000 double rubs (unless otherwise noted in the CID Package) when tested in accordance with the ASTM D 4157 Wyzenbeek Method (#10 cotton duck). Upholstery shall not be vinyl unless otherwise noted. As identified on the procurement information sheets in the CID Package, upholstery fabric shall be graded in. Graded in fabric is defined as a manufacturer's standard fabric, to include textile manufacturer's fabrics that have been graded in to a furniture manufacturers fabric grades. Fabric provided shall be available through a manufacturer's GSA Schedule. Do not provide COM (customers own material) fabrics.

b. See CID Package for additional upholstery information.

4.2.4 Task Lighting

a. At all executive workstations (item code WSE) with overhead storage units, provide LED under overhead cabinet task lights. In addition, at executive workstations (all variations) WSE01, WSE02, WSE03, WSE05, WSE07 and WSE10 provide an LED adjustable arm personal task light (desk lamp) with adjustable, fully articulated and balanced head and arms. Task lights shall be provided with a power supply and occupancy sensor. The ends of the task light length shall not extend beyond the edges of the overhead cabinet. Task lights shall have structurally sound mounting devices which will prevent accidental displacement, but will allow easy removal and replacement when necessary. Luminaires shall be UL approved for use in the configurations indicated on the drawings and as specified in the CID Package and shall carry the Energy Star label.

b. Luminaires and lamps shall be as specified in the CID Package and as modified herein. Luminaires shall be low voltage minimum 9 watt LED type . Task light shall be installed under each overhead cabinet at all executive workstation types. Personal task light (desk lamp) shall be installed at the executive workstations types listed in paragraph 4.2.4; each grouping of task lights and/or personal task lights (desk lamp) shall have an individual power supply and occupancy sensor.

c. Task lights for each executive workstation shall provide a minimum of 60 foot candles of light (horizontally measured), without veiling reflections, on the work surface directly below the overhead storage cabinet or desk lamp and a maximum of 20 inches from the luminaire. Color temperature of the LED task lights and personal task light (desk lamp) shall be 3500-4000K +/- 200 degK. Task light shall be of the largest length available under all overhead shelves and overhead cabinets; more than one task light may be required per shelf or cabinet. Where more than one task light is utilized under an overhead shelf or overhead cabinet they may be daisy-chained together. Task light power cable shall be a minimum of 12 feet in length and shall reach to the power supply; power supply shall have a minimum cord length of 5 feet. Each task light shall have an easily accessible on-off switch and shall be connected to an occupancy sensor.

d. Personal task light (desk lamp) shall be constructed of aluminum and plastic. The personal task light (desk lamp) shall articulate at three distinct joints. The minimum adjustable arm range shall be 10 inches. The personal task light shall be a freestanding desk lamp with a weighted base. Personal task light (desk lamp) shall be on the same power supply and occupancy sensor as the overhead shelf and overhead cabinet task lights and shall have an easily accessible in-line switch. Personal task light (desk lamp) shall have a power cable minimum 9 foot in length and shall reach to the power supply. Personal task light (desk lamp) shall provide a minimum of 48 foot candles of light directly (horizontally measured), without veiling reflections, on the work surface below and a maximum of 12 inches from the luminaire. All diffusers, grilles or other coverings shall be easily removable to permit cleaning and relamping.

e. Task lights, personal task light (desk lamp), power supply and occupancy sensor shall be the PLS System by Finelite or approved equal. Fixture color shall be as specified in the CID Package.

f. Task lighting at all other furniture types including technical workstations and workbenches shall be as specified in the CID package.

4.2.5 Finishes

a. Finishes shall be able to be cleaned with ordinary household cleaning solutions unless otherwise noted. Wood finishes shall be cleaned with damp cloth as directed by the manufacturer.

b. Finishes shall be as specified in the CID Package.

c. The finish of steel surfaces shall be the manufacturer's most durable finish, factory powder coat.

d. Grommet colors shall be compatible and coordinated with the desk and table finish colors.

e. See the CID Package for additional finish information.

4.2.6 Locks and Keying

a. All drawers and doors, including but not limited to overhead storage compartments, supply cabinets, storage cabinets, desk pedestals and filing cabinets shall be lockable. It is preferred that center drawers be lockable, but it is not required.

b. Key each multi-person office workstations and private office furniture differently. All locks within a workstation or private office shall be individually and randomly keyed, with all locks within a workstation or private office keyed the same.

c. Drawers within a pedestal shall be lockable either by a central lock that controls all pedestals under one work surface or an individual keyed lock in each pedestal.

d. Central file and storage units which are grouped together but are not a part of a workstation shall be keyed alike unless otherwise specified.

e. Two keys shall be provided per workstation when components are keyed alike. Two keys shall also be provided per each miscellaneous item such as filing cabinets, supply cabinets, storage cabinets, etc. Keys shall be ringed together and left in or on the furnishing item.

f. Six master keys of each unique keying system shall be delivered to the COR prior to the Government acceptance of the first delivery order. If applicable, six core removal keys shall be delivered to the COR prior to the Government acceptance of the first delivery order. Delivery of such shall be tracked and documented via a submittal.

4.3 Furniture Layout

See drawings and CID Package for location of furniture.

Chapter 5

5 GENERAL FURNISHINGS EXECUTION

5.1 INSTALLATION PROCEDURES

Installation shall be completed in accordance with manufacturer's installation instructions, assembly manuals and approved installation drawings in addition to the following requirements:

a. Material handling equipment shall have air filled rubber wheels. Any waivers from this requirement must be approved by the COR and will be evaluated pursuant to section 2.2.2.

b. Furniture and components, including systems furniture shall be installed level, plumb, square, and with proper alignment with adjoining furniture.

c. Locking mechanisms shall be checked and keys matched with locks. Drawers, doors, lighting and other operable items and mechanisms shall be checked for proper operation.

d. All protective wrapping tape, residue, etc. shall be removed. Upon completion of installation, all furniture shall be completely finished, leveled, aligned, operational and functional.

e. The components shall be securely interconnected where required.

f. Three sets of special tools necessary for the relocation of furniture and other components shall be furnished, see section 3.4.13.

g. All items with an electrical plug shall be fully operational, such as desks with task lighting or power strips.

h. Where furniture items (including, but not limited to conference tables, training tables, and workbenches) require power and are not against a wall with available power, furniture item must be available with power system requirements as specified in the CID Package. See CID Package, for additional details.

i. Data Receptacles and connectors shall be provided by the furniture manufacturer as specified in the CID Package. Communications/data cabling shall be Government Furnished/Government Installed.

j. Any discrepancies from approved furniture layout at time of delivery order and the actual site conditions must be reported to the COR. The Contractor and COR will discuss solutions, and the resolution to the issue will be determined by the COR. If the resolution is out of scope of the delivery order (in either the Contractor or COR's opinion), the Contractor and COR must notify the CO.

k. Requests from any party not the COR to adjust from the approved furniture layout at the time of delivery order must be reported to the COR. The name, role, and position of the requestor is preferred so that the COR can contact the requestor. Refer to section 2.5.1.

l. Upon completion of installation provide furniture drawings and furniture listing, see section 3.4.14.

5.2 BUILDING PROTECTION

Building surfaces shall be…