DID Life-Cycle Mangament Plan OT-14-37501.docx
DOCX document 27 KB Posted
- Attached to
- Information Technology Capabilities Contract (ITCC) II Federal contract opportunity
- Solicitation number
- FA4600-14-R-0017
About this file
This document contains a Data Item Description (DID) and related solicitation for an Information Technology Capabilities Contract II. The DID outlines the requirements for a Life-Cycle Management Plan to provide a roadmap for maintaining the IT enterprise environment at United States Strategic Command, including processes for upgrades, replacement, sustainment, and disposal of all hardware, software, and infrastructure. The contractor must address capacity planning, current configurations, operational needs, new versions, cost-saving technologies, architectural impacts, and issues from previous reports.
The related solicitation is for ITCC II support services at United States Strategic Command. Offerors must follow the instructions in Request for Proposal FA4600-14-R-0017, which includes a technical read library. Companies that received the draft library can request an update, while others must follow directions in a separate notification document. The contracting agency is the Department of the Air Force Air Combat Command.
Not Listed
View the file
Other files for this federal contract opportunity
Show all 50
Information Technology Capabilities Contract (ITCC) II has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OT-14-37501
DATA ITEM DESCRIPTION
Title: Life-Cycle Management (LCM) Plan
| Number: OT-14-37501 | Approval Date: 20140721 |
| AMSC Number: N/A | Limitation: FA4600-14-R-0017 |
| DTIC Applicable: N/A | GIDEP Applicable: N/A |
Office of Primary Responsibility: F/ACC Applicable Forms: N/A
Use/relationship: The life-cycle management (LCM) Plan shall provide a road map that outlines the cradle-to-grave activities for maintenance of the IT enterprise environment. Activities include all processes and functions necessary to manage the life-cycle. This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract PWS. This DID is for one-time use for solicitation FA4600-14-R-0017.
Requirements:
1. Reference documents. None.
2. Format. The LCM plan shall be in contractor’s format.
2.1 Identification. The data indicated below shall be contained on the title page or on the first page of the report.
a. Title of the Report
b. Period covered by the report
c. Contract Number
d. Preparing activity title
e. Data Item Number listed on the CDRL DD Form 1423-2
2.2 Page size: The reports shall be on 8 ½ by 11 inch (metric A4) paper. The pages shall be sequentially numbered. As necessary, graphic material may be one-way fold-outs. All attachments shall be identified and referenced in the text. Each section and paragraph shall be numbered.
2.3 Appendices: Appendices where applicable, for table, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.
3. Content. The report shall address the following:
a. Introduction
b. Recommendations to the life-cycle management processes using industry best practices tailored to Command requirements for upgrades, replacement, sustainment, and disposal of all USSTRATCOM IT hardware, software, and infrastructure.
c. Capacity planning information to include both day-to-day status monitoring as well as forecasting.
d. Current configuration baseline of hardware, software, and network assets.
e. Current and future operational needs.
f. New operating system and application versions.
g. Technology that potentially provides savings and/or improves mission accomplishment.
h. Impacts to the architecture and the life-cycle cost of modifications.
i. Full systems development (conceptual planning through development and deployment).
j. Logistics, such as procurement, warehousing, and IT disposal.
k. Issues/areas of concern and the status of outstanding issues/areas of concern from the previous report.
4. End of OT-14-37501.