DID Life-Cycle Mangament Plan OT-14-37501.docx

DOCX document 27 KB Posted

Attached to
Information Technology Capabilities Contract (ITCC) II Federal contract opportunity
Solicitation number
FA4600-14-R-0017
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a Data Item Description (DID) and related solicitation for an Information Technology Capabilities Contract II. The DID outlines the requirements for a Life-Cycle Management Plan to provide a roadmap for maintaining the IT enterprise environment at United States Strategic Command, including processes for upgrades, replacement, sustainment, and disposal of all hardware, software, and infrastructure. The contractor must address capacity planning, current configurations, operational needs, new versions, cost-saving technologies, architectural impacts, and issues from previous reports.

The related solicitation is for ITCC II support services at United States Strategic Command. Offerors must follow the instructions in Request for Proposal FA4600-14-R-0017, which includes a technical read library. Companies that received the draft library can request an update, while others must follow directions in a separate notification document. The contracting agency is the Department of the Air Force Air Combat Command.

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to Information Technology Capabilities Contract (ITCC) II, newest first.
File Type Posted
FA4600-14-R-0017-0006.pdf PDF
FA4600-14-R-0017-0004.pdf PDF
20141106_Q A.pdf PDF
Section_J _Attachment_15 _Contractor_Cost_Price_Model_v5.2.xls XLS spreadsheet
Section_J _Attachment_15 _Contractor_Cost_Price_Model.xls XLS spreadsheet
ITCC__II_Q A_20141028.pdf PDF
DD1423-2__CDRLs_A023_A024_ITCC_II.pdf PDF
ITCC_II_Technical_Library_NDA_20141001.docx DOCX document
DID Transition Plan OT-14-37513.docx DOCX document
DID CCSS Other Tech Reports OT-14-37506.docx DOCX document
DD1423-2__CDRL_A005 Appendix Metrics.docx DOCX document
Section_J _Attachment_12 _PP_Tracking_Record.docx DOCX document
DD1423-2__CDRLs_A027_A028_ITCC_II.pdf PDF
DD1423-2__CDRLs_A023_A024_ITCC_II.pdf PDF
DD1423-2__CDRLs_A005_A006_ITCC_II.pdf PDF
DD1423-2__CDRL_A005 Appendix Metrics.docx DOCX document
DD1423-2__CDRLs_A011_A012_ITCC_II.pdf PDF
DD1423-2__CDRLs_A013_A014_ITCC_II.pdf PDF
DID Config Mangament Drawings OT-14-37505.docx DOCX document
DID_SD_Invoice_and_Payment_Report__OT-14-37512.docx DOCX document
DID_Technical_Solution_OT-14-37507.docx DOCX document
DD1423-2__CDRLs_A017_A018_ITCC_II.pdf PDF
DID Price Breakdown Report OT-14-37509.docx DOCX document
DID Cyber Defense Report OT-14-37500.docx DOCX document
DD1423-2__CDRL_A023 Appendix Metrics.docx DOCX document
DID Cybersecurity Documentation OT-14-37508.docx DOCX document
DD1423-2__CDRLs_A011_A012_ITCC_II.pdf PDF
DID_Config_Mangament_Plan_OT-14-37502.docx DOCX document
DID NC3 SD Metrics and Reporting OT-14-37510.docx DOCX document
Section_J _Attachment_6 _Quality_Assurance_Surveillance_Plan_(QASP).docx DOCX document
DD1423-2__CDRLs_A019_A020_ITCC_II.pdf PDF
DID Life-Cycle Mangament Plan OT-14-37501.docx DOCX document
DID NC3 SD Metrics and Reporting OT-14-37510.docx DOCX document
DID Config Mangament Drawings OT-14-37505.docx DOCX document
DID CCSS Security and Training OT-14-37504.docx DOCX document
DD1423-2__CDRLs_A007_A008_ITCC_II.pdf PDF
Section_J _Attachment_18 _Tech_Cross_Ref_Matrix.docx DOCX document
DID_NC3_SD_Metrics_and_Reporting_OT-14-37510.docx DOCX document
DD1423-2__CDRLs_A013_A014_ITCC_II.pdf PDF
DD1423-2__CDRLs_A003_A004_ITCC_II.pdf PDF
DID_Contr_Prop_Mgmt_Plan_CCSS_OT-14-37511.docx DOCX document
DD1423-2__CDRLs_A005_A006_ITCC_II.pdf PDF
DD1423-2__CDRLs_A027_A028_ITCC_II.pdf PDF
DD1423-2__CDRLs_A007_A008_ITCC_II.pdf PDF
DD1423-2__CDRL_A021_Appendix_SDO_to_PWS_Mapping_Matrix.xlsx XLSX spreadsheet
DD1423-2__CDRLs_A019_A020_ITCC_II.pdf PDF
DD1423-2__CDRLs_A025_A026_ITCC_II.pdf PDF
DD1423-2__CDRL A021 Appendix SDO to PWS Mapping Matrix.xlsx XLSX spreadsheet
DID CCSS Security and Training OT-14-37504.docx DOCX document
Section_J _Attachment_13 _Subcontracting_Teaming_Partner_Consent_Ltr.docx DOCX document
Show all 50

Information Technology Capabilities Contract (ITCC) II has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OT-14-37501

DATA ITEM DESCRIPTION

Title: Life-Cycle Management (LCM) Plan

Number: OT-14-37501Approval Date: 20140721
AMSC Number: N/ALimitation: FA4600-14-R-0017
DTIC Applicable: N/AGIDEP Applicable: N/A

Office of Primary Responsibility: F/ACC Applicable Forms: N/A

Use/relationship: The life-cycle management (LCM) Plan shall provide a road map that outlines the cradle-to-grave activities for maintenance of the IT enterprise environment. Activities include all processes and functions necessary to manage the life-cycle. This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract PWS. This DID is for one-time use for solicitation FA4600-14-R-0017.

Requirements:

1. Reference documents. None.

2. Format. The LCM plan shall be in contractor’s format.

2.1 Identification. The data indicated below shall be contained on the title page or on the first page of the report.

a. Title of the Report

b. Period covered by the report

c. Contract Number

d. Preparing activity title

e. Data Item Number listed on the CDRL DD Form 1423-2

2.2 Page size: The reports shall be on 8 ½ by 11 inch (metric A4) paper. The pages shall be sequentially numbered. As necessary, graphic material may be one-way fold-outs. All attachments shall be identified and referenced in the text. Each section and paragraph shall be numbered.

2.3 Appendices: Appendices where applicable, for table, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.

3. Content. The report shall address the following:

a. Introduction

b. Recommendations to the life-cycle management processes using industry best practices tailored to Command requirements for upgrades, replacement, sustainment, and disposal of all USSTRATCOM IT hardware, software, and infrastructure.

c. Capacity planning information to include both day-to-day status monitoring as well as forecasting.

d. Current configuration baseline of hardware, software, and network assets.

e. Current and future operational needs.

f. New operating system and application versions.

g. Technology that potentially provides savings and/or improves mission accomplishment.

h. Impacts to the architecture and the life-cycle cost of modifications.

i. Full systems development (conceptual planning through development and deployment).

j. Logistics, such as procurement, warehousing, and IT disposal.

k. Issues/areas of concern and the status of outstanding issues/areas of concern from the previous report.

4. End of OT-14-37501.

File details come from the government source that posted it. Updated .