Specifications.pdf
PDF 2 MB Posted
- Attached to
- Repair Lift Stations
- Solicitation number
- FA4528-09-R-0045
About this file
Attachment 1 - Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08-1005 DM-1.pdf | ||
| 08-1005 C-1.pdf | ||
| 08-1005 C-2.pdf | ||
| Revised Specifications.pdf | ||
| 08-1005 E-2.pdf | ||
| 08-1005 E-1.pdf | ||
| Revised Specs and Drawings - Amend 2.doc | DOC document | |
| 08-1005 C-5.pdf | ||
| Evaluation Factors - Amend 1.doc | DOC document | |
| Attachment 4 - Recent and Relevant Experience.doc | DOC document | |
| Drawings.pdf | ||
| Solicitation.doc | DOC document | |
| Attachment 3 - Wage Determination.doc | DOC document | |
| Attachment 5 - Responsibility Questionnaire.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S P E C I F I C A T I O N
FOR PROJECT
QJVF 08-1005 REPAIR LIFT STATIONS
AT
MINOT AIR FORCE BASE, NORTH DAKOTA
PREPARED BY:
5 CES, ENGINEERING FLIGHT
MINOT AIR FORCE BASE, NORTH DAKOTA
JULY 2009
i
QJVF 08-1005
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS PAGES
01005 Administrative Provisions 01005-1 thru 6 01300 Submittals 01300-1 thru 5 01400 Quality Control 01400-1, 2 01430 Environmental Protection 01430-1 thru 5 01500 Construction Facilities & Temporary Controls 01500-1 thru 4 01700 Contract Close Out 01700-1 01710 Final Cleaning 01710-1, 2
DIVISION 2 - SITEWORK
02005 Sitework 02005-1 thru 3 02010 Subsurface Conditions 02010-1 02075 Demolition 02075-1 thru 2 02110 Clearing 02110-1 02210 Site Grading 02210-1, 2 02215 Excavation 02215-1 thru 3 02221 Trenching 02221-1 thru 4 02222 Excavation, Trenching, and Backfilling for Utilities Systems 02222-1 thru 5 02242 Aggregate Base Course 02242-1 thru 6 02265 Landscape Grading 02265-1, 2 02485 Seeding 02485-1 thru 4 02530 Sanitary Sewer 02530-1 thru 4 02531 Sanitary Sewer Pumping Stations 02531-1 thru 10 02546 Aggregate Surface Course 02546-1 thru 4 02551 Bituminous Base Surface Course 02551-1 thru 22 02559 Bituminous Prime Coat 02559-1 thru 3 02581 Pavement Markings 02581-1 thru 4 02602 Stabilized – Aggregate Base Course 02602-1 thru 6 02613 Bituminous Full Depth Patches 02613-1 thru 5
DIVISION 3 – CONCRETE
03002 Concrete 03002-1 thru 3
DIVISION 4 – NOT USED
DIVISION 5 – METALS
05500 Metal Fabrications 05500-1 thru 4 05540 Castings 05540-1, 2
DIVISION 16 – ELECTRICAL
16010 General Provisions 16010-1 thru 5 16040 Identification 16040-1, 2 ii
16110 Raceway 16110-1 thru 4 16120 Low Voltage Conductors 16120-1 thru 3 16170 Disconnects 16170-1, 2 16181 Fuses 16181-1, 2 16401 Primary Distribution 16400-1, thru 8 16411 Underground Electrical Service 16411-1, 2 16450 Grounding 16450-1, thru 3 16460 Transformers 16460-1, thru 5 16900 Connections to Equipment 16900-1, 2
DIVISION l - GENERAL REQUIREMENTS
SECTION 01005
ADMINISTRATIVE PROVISIONS
1. GENERAL:
1.1 DESCRIPTION OF WORK:
1.1.1 Work of this Contract Repair Lift Stations, QJVF 08-1005, comprises general, mechanical and electrical construction in and near building 546, building 546 parking lot and near building 544, at Minot Air Force Base, North Dakota. Provide bypass pumping or mobile toilets and sanitary stations to keep all buildings and Bud Ebert park operational.
1.2 WORK SEQUENCE:
1.2.1 Construct Work in stages to accommodate Using Agency occupancy requirements during the construction period; coordinate construction schedule and operations with the Contracting Officer or Technical Representative.
1.3 USE OF PREMISES:
1.3.1 Limit use of premises for Work and for construction operations, to allow for Using Agency Occupancy. Access to parking and building 544 shall be maintained at all times. Temporary loss of parking spaces shall be kept to a minimum as approved by the Contracting Officer.
1.3.2 Limit access to site from Tanker Trail.
1.3.3 Coordinate use of premises under direction of the Contracting Officer.
1.3.4 Using Agency will occupy premises during entire period of construction for the conduct of normal operations. Cooperate with the Contracting Officer to minimize conflict, and to facilitate Using Agency operations.
1.4 HAZARDOUS MATERIALS:
1.4.1 The following information is required for all chemicals brought and used on-site: Product name, National Stock Number (NSN), Current MSDS (matches manufacturer and date of manufacturer), type and quantity of chemical brought on base each month, type and quantity of chemical used on base each month, type and quantity stored on base each month, location of chemical storage, and location of chemical usage.
1.5 COORDINATION:
1.5.1 Coordinate work of the various Sections of Specifications to ensure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items installed later.
1.5.2 Verify characteristics of elements of interrelated operating equipment are compatible; coordinate work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.
1.5.3 Coordinate space requirements and installation of mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduits, as closely as practicable; make
01005 - 1 runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
1.5.4 In finished areas (except as otherwise shown,) conceal pipes, ducts, and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements.
1.5.5 Execute cutting and patching to integrate elements of Work, uncover ill-timed, defective, and non-conforming work, provide openings for penetrations of existing surfaces and provide samples for testing. Seal penetrations through floors, walls, and ceilings.
1.6 CONTRACTOR'S WORK HOURS: Working hours for the Contractor will normally be between the hours of 7:30 a.m. and 4:00 p.m., excluding Saturdays, Sundays, and federal holidays. If the Contractor desires to work during periods other than above, additional Government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates will be charged to the Contractor. These adjustments to the Contract price may be made periodically as directed by the Contracting Officer.
1.7 FIELD ENGINEERING:
1.7.1 Provide field engineering services; establish grades, lines, and levels, by use of recognized engineering survey practices.
1.7.2 Control datum for survey is that shown on Drawings.
1.8 REFERENCE STANDARDS:
1.8.1 For products specified by association or trade standards, comply with requirements of the standard.
1.8.2 The date of the standard is that in effect as of the Bid date.
1.9 SUBMITTALS:
1.9.1 Notify housing occupants in writing a minimum of two days prior to work start.
1.9.2 Submit copy of letter to Contracting Officer according to Section 01300.
1.10 RESTRICTED AREAS:
1.10.1 The work site is in a restricted area; therefore, the
Contractor shall conform to all requirements of MAFBI 31-101.
1.10.2 The Contractor shall anticipate some delays at the start and end of each day's operation.
1.10.3 Access to and from the site shall be controlled by the Base Security Police.
1.10.4 The names of all individuals requiring access to the area shall be submitted in writing to the 5 SPS/SPO, Minot AFB ND, a minimum of 24 hours in advance of the requested time of entry.
01005 - 2
1.10.5 Individuals without adequate identification will not be allowed entry.
1.11 SAFETY:
1.11.1 Contractor to comply with all OSHA/NEC Regulations.
1.11.2 Contractor to comply with MAFBI 32-2001, Responsibilities of Base Personnel to Eliminate or Control Fire Hazards.
1.12 WELDING:
1.12.1 When any welding, cutting, brazing or use of any open flame device is to be used, an AF Form 592 permit must be obtained from the Base Fire Department, 320 Flightline Drive, prior to beginning such work.
1.12.2 During such work, a fully charged and operable fire
extinguisher, appropriate for the task, shall be provided by the Contractor.
1.13 HAZARDOUS WASTE: Any hazardous waste/material used or generated by the Contractor shall become the property of the Contractor. The use, generation and disposal of all hazardous waste/material will be the responsibility of the Contractor and shall be handled in accordance with all federal and state hazardous waste and toxic substances control regulations.
1.14 HAZARDOUS MATERIALS: Contractor shall submit prior to contract award Material Safety Data Sheet (MSDS’s) expected to be used during contract performance. Hazardous material shall be defined in the latest version of Federal Standard No. 313.
1.15 PERMITS AND WORK CLEARANCES:
1.15.1 Clearance Work Request:
1.15.1.1 Contractor shall coordinate with appropriate utility locating agencies, including base communications cable maintenance (Item 1 through 15) of AF Form 103, Base Civil Engineering Work Clearance Request. AF Form 103 will be given to the Contractor during the pre-construction meeting.
Contractor shall complete and follow all instructions on AF Form 103 before start of work on base. A copy of AF Form 103 instructions will be available to the Contractor during the pre-construction meeting.
1.15.1.2 Before any excavation, alteration, or other construction work is begun, the Contractor shall obtain and fully process an AF Form 103, Base Civil Engineering Work Clearance Request. The form requires extensive coordination with several base agencies, including furnishing all locations, detailed information, and sketches regarding any proposed excavation(s).
Processing a separate request for each planned excavation is required; each phase of processing the form and its attachments shall be completed prior to commencing work involving that phase. The AF Form 103 shall be prominently displayed on the job site at all times for review by the Contracting Officer and/or his or her designated representative. A copy of the signed form shall be submitted to the Contracting Officer and a copy to the project inspector.
Completion of the AF Form 103 includes certifying
01005 - 3 compliance with institutional controls indicated by CEV, coordination in getting the form coordinated, and returning the form to the Environmental office when the project has been completed.
1.15.1.3 Contractor shall schedule a meeting time to meet with each utility agency at the work site to locate affected utilities.
1.15.1.4 Contractor shall maintain all marked utilities in the field once they are initially marked by each utility agency. If markings are damaged, Contractor shall request new locates and shall give the locating agency 48 hours to perform the new locates. Expenses for time and materials to perform repeat locates shall be borne by the Contractor, unless otherwise approved by the Approving Officer. Cost to do the repeat locates will be deducted from the final invoice. Cost will be calculated using the average shop rate of each agency. In cases where utilities were marked late in the year and operations had to be shut down for winter, marked utilities would still have to be maintained by the Contractor by placing stakes or transcribing the marks on a drawing. When construction resumes, Contractor shall re-mark the site and may request verification of utility locations at no additional cost to him. Off-base utility locates agencies might request additional cost for repeat locates.
1.15.1.5 Clearance request is not valid until signed by the
Approving Officer, block 17 of the AF Form 103. Approving Officer will not sign until all locates are marked and all utility locating agencies signatures are on the form. Excavation work shall commence within 30 days after the Approving Officer's signature; otherwise, clearance request is invalid and a new request is required. Notify Contracting Officer immediately if new utilities were installed by others and not marked after all initial locates are made.
1.15.1.6 Protection of Existing Utilities: The Contractor shall safeguard and protect from damage all utilities encountered or uncovered during digging, excavation, and backfilling.
1.15.2 AF Form 592: When any welding, cutting, brazing or use of any open flame device is to be used, an AF Form 592 permit must be obtained from the Base Fire Department (Building 896, 320 Flightline Drive) prior to beginning such work. During such work, a fully charged and operable fire extinguisher, appropriate for the task, shall be provided by the Contractor.
1.16 RECYCLING/REUSE OF EXCESS MATERIALS AND CONSTRUCTION AND DEMOLITION
(C&D) DEBRIS: The Contractor shall reuse/recycle excess materials and Construction and Demolition (C&D) debris to the maximum extent possible.
C&D debris are those excess/residue materials resulting from construction or demolition activity that would normally be discarded to a landfill.
C&D debris includes, but is no limited to soil, rock, vegetation, concrete, asphalt, and building materials such as windows, wood, metal, and roofing materials. The Contractor shall recycle C&D debris and excess materials, if determined to be economical. All C&D debris resulting from demolition shall become the property of the Contractor unless specified otherwise or as determined by the Contracting Officer.
01005 - 4
01005 - 5
1.16.1 Materials not to be returned to the Government and all Contractor-generated rubbish, if not recycled, shall be disposed of by the Contractor off-base at his own expense, and in compliance with applicable environmental codes and regulations of governing authorities.
1.16.2 Reporting Tonnage of C&D Debris: Contractor shall track and report the tonnage of C&D debris in two categories:
1.16.2.1 Tons of C&D that is or will be recycled or reused.
1.16.2.2 Tons of C&D that is disposed in a landfill.
The C&D recycled/disposed tonnage report shall consist of a written memo with the tonnage of each category (recycled and disposed tonnage) submitted to 5 CES/CEVP through the Contracting Officer. Submit C&D recycled and disposed tonnage report when the project is completed.
1.17 OUTAGES:
1.17.1 Any outages (to include parking, electricity, water, sewer, heating, telephones and computer networks) requested by Contractor shall be submitted in writing no less than fifteen (15) working days prior to the proposed outage. Gas, heat, or electric outages shall not be scheduled from October 15 to April 1. A minimum of one portable toilet for 15 building occupants shall be provided during any water/sewer outage. A sanitary station for hand washing shall be provided for every two portable toilets. A minimum of 3 portable toilets and one sanitary station shall be provided for Bud Ebert park.
1.17.2 The Government reserves the right to reschedule the
Contractor's proposed outage if deemed necessary.
1.17.3 In the event utility outages cannot be performed on any facility due to critical operation impact, the utility outages, and any related work shall be performed on non-duty hours.
1.17.4 The Contractor shall notify the Base Fire Department prior to shutdown of emergency utilities to a facility.
1.18 AS-BUILT DRAWINGS: The Contractor shall maintain a set of red-lined full-size, as-built construction drawings marked-up to fully indicate as-built conditions. These drawings shall be maintained in a current condition at all times until completion of the work and shall be available for review by Government personnel at all times. The location as dimensioned from permanent features, general description, type of material, and approximate depth below finished grade of all new and existing exterior underground utilities encountered shall be indicated. All variations from the contract drawings for the required coordination between trades shall be indicated. These variations shall be shown in the same general detail utilized in the initial contract drawings. As-built construction drawings shall be furnished to the Contracting Officer for use during the final inspection. The as-built drawings shall be submitted to the Contracting Officer in accordance with Section 01300: SUBMITTALS.
2. PRODUCTS: Not Used.
3. EXECUTION: Not Used
END OF SECTION
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01300
SUBMITTALS
1.1 PROCEDURES:
1.1.1 The Contractor shall be required to submit items listed in the Submittal Schedule at the end of this section.
1.1.2 Transmit each item under AF 3000, Material Approval Submittal form. Identify contract number, project number, and Contractor. Identify section and paragraph reference for each item submitted with the AF 3000.
Submit five (5) copies unless otherwise required elsewhere in the specification.
1.1.3 Unless specifically stated otherwise elsewhere in this
specification, each submittal shall be approved by the Contracting Officer prior to incorporation of materials into the work.
1.1.4 Approvals of submittals which do not conform to the Contract shall not be construed as a change to the contract.
1.1.5 The Contractor shall fill in the "Required Submission Date" on the AF Form 66s with the date he plans on submitting the submittals to the Government. A copy of the AF Form 66s with the required submission date filled in shall be submitted to the Contracting Officer for use by the contract administrator. Submit in accordance with Section 01300.
1.2 MANUFACTURER'S DATA AND SAMPLES: For the following types of submittals when a specific product of a specific manufacturer is identified (by catalog or product number, pattern, or style) and the Contractor does not desire to propose an alternate product as an equal, where an equal is allowed, a detailed submittal will not be required. The Contractor shall submit on an AF Form 3000 a list of submittals for which the specified products will be used. Submit in accordance with procedures identified in 1.1 above.
1.2.1 Product Data: Submit complete manufacturer's literature which describes all salient characteristics identified as requirements in the specification. Literature which is not specific to the proposed product shall be marked to indicate clearly which item is being proposed for use in this contract.
1.2.2 Manufacturer's Certification: Submit a statement from the product manufacturer that proposed products meet the specified standards and other salient characteristics identified as requirements in the specification.
1.2.3 Installation Instructions: Submit manufacturer's printed instructions for delivery, storage, assembly, installation, start-up (if applicable) and adjustments. Information shall include temperature restrictions and any other environmental limitations as well as substrate preparation requirements if any exist.
1.2.4 Samples:
01300 - 1
MIN 08-1005
01300 - 2
1.2.4.1 Submit full range of manufacturer's standard colors, textures and patterns for specified items for selection by the Contracting Officer.
1.2.4.2 Submit samples to illustrate performance and
functional characteristics of the product. Samples shall include integral parts, attachment devices and specified accessories. Provide full identification information on each sample.
1.3 SHOP DRAWINGS: Drawings shall illustrate how the specified materials are integrated into the work as a whole. Adjacent materials which affect the complete installation of the specified products shall be shown and identified.
Deviations from Contract drawings shall be clearly identified and reason for deviation clearly explained.
1.4 TEST DATA: Test results shall be dated and signed by the agency performing the test.
1.5 WARRANTY: Submit detailed warranty information which identifies specifically items covered as well as exclusions from the warranty and the warranty period. All copies shall be dated and signed by an authorized officer of the company. The officer's name and title shall be typed on the warranty adjacent to the signature.
1.6 OPERATION/MAINTENANCE INSTRUCTIONS: Submit manufacturer's published instructions.
1.7 MISCELLANEOUS SUBMITTALS: Submittals which are none of the above types shall meet the specific requirements identified in the referenced paragraph of the Specification Section identified in the schedule.
1.8 SUBMITTAL SCHEDULE: The following is a list of required submittals for this Contract.
SC
H
ED
U
LE
O F
M
AT
ER
IA
LS
S
U B
M
IT
TA
LS
Pr oj ec t N um be r Pr oj ec t T itl e:
So lic ita tio n/ C on tra ct N um be r Q
JV
F
-1
C on st ru ct L ift S ta tio ns
T
O B
E C
O M
PL
ET
ED
B
Y
PR
O
JE
C T
EN
G
IN
EE
R
B E
C O
M
PL
ET
ED
B Y
C O
N
TR
AC
TO
R A
D M
IN
IS
TR
AT
N um be r o f C op ie s R eq ui re d
LINE NUMBER
IT
EM
O R
D
ES
C R
IP
TI
O N
O F
IT
EM
C
O N
TR
A
C T
R
EF
ER
EN
C E, T
YP
E O
F
SU
B M
IT
TA
L
CERTIFICATION OF
COMPLIANCE
SHOP DRAWINGS
SAMPLES
COLOR SELECTION
MANUFACTURER'S
RECOMMENDATIONS
MANUFACTURER'S
WARRANTY
CATALOG DATA
OPERATING
INSTRUCTIONS
TESTS
OTHER
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE
SUBMITTAL NUMBERS
D A
TE
C
O N
TR
A
C
TO
R N
O
TI
FI
ED
CONTRACTOR
RESUBMITTAL
FINAL APPROVAL
R
EM
A R
K S
A
PP
R O
VE
D
D
IS
A
PP
R
O
VE
D
S
E C
TI
O
N
/1 .9
.1
S
O P
D R
A W
IN
G
S
E C
TI
O
N
/1 .9
.2
FO
M N
D G
-0
S
E C
TI
O
N
/1 .7
U
TA
G E
S
S
E C
TI
O
N
/1
E
V
IR
O N
M E
N
TA
L C
O N
TR
O
LS
S
E C
TI
O
N
/3 .4
(N P
D E
S ) R
E Q
U
IR
E M
E N
TS
S
E C
TI
O
N
/1 .3
C
R
TI
FI
C
A
TI
O N
O F
01300-3
C O
M P
LE
TI
O N
S
E C
TI
O
N
/1 .5
M
R K
IN
G
T A
P E
S
E C
TI
O
N
.4
B M
IT
TA
LS
S
E C
TI
O
N
/2
M
P
LI
N G
A N
D T
E S
TI
N
G
S
E C
TI
O
N
IP
E
F
IT
TI
N
G S
S
E C
TI
O
N
/1
N H
O
LE
, P U
M P
S , V
A
LV
LE
C
TR
IC
A
L
S
E C
TI
O
N
/1
V
U
LT
P
U M
P S
H
D
A W
IN
G
S
S
E C
TI
O
N
/1
R
TI
FI
C
A
TE
S
AF
F or m
ED
U
LE
O F
M
AT
ER
IA
LS
S
U B
M
IT
TA
LS
Pr oj ec t N um be r Pr oj ec t T ita tio n/ C on tra ct N um be r Q
JV
F
-1
C on st ru ct L ift S ta
B
E C
O M
PL
ET
ED
B
Y
PR
O
JE
C T
EN
G
IN
B E
C O
M
PL
ET
ED
B Y
C O
N
TR
AC
TO
R A
D M
IN
IS
TR
AT
be r o f C op ie s R eq ui re d
LINE NUMBER
IT
EM
O R
D
ES
C R
IP
TI
O N
O F
IT
EM
C
O N
TR
A
C T
R
EF
ER
EN
C E, T
YP
E O
F
SU
B M
IT
TA
L
CERTIFICATION OF
COMPLIANCE
SHOP DRAWINGS
SAMPLES
COLOR SELECTION
MANUFACTURER'S
RECOMMENDATIONS
MANUFACTURER'S
WARRANTY
CATALOG DATA
OPERATING
INSTRUCTIONS
TESTS
OTHER
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE
SUBMITTAL NUMBERS
D A
TE
C
O N
TR
A
C
TO
R N
O
TI
FI
ED
CONTRACTOR
RESUBMITTAL
FINAL APPROVAL
R
EM
A R
K S
A
PP
R O
VE
D
D
R
O
VE
D
S
E C
TI
O
N
/1
M M
A N
U A
LS
S
E C
TI
O
N
/1
N U
FA
C
TU
R
E
'S
IN
TR
U
C
TI
O N
S
S
E C
TI
O
N
/1
.6
TE
TS
S
E C
TI
O
N
/1
W
R R
A N
TY
S
E C
TI
O
N
/1
IN
T
S A
M P
LE
S
S
E C
TI
O
N
/1
01300-4
S
U B
M
IT
TA
LS
S
E C
TI
O
N
/2
N U
FA
C
TU
R
E
'S
R
TI
FI
C
A
TE
S
E C
TI
O
N
B
M
IT
TA
LS
S
E C
TI
O
N
O P
D R
A W
IN
G
S
S
E C
TI
O
N
/1
B
M
IT
TA
LS
S
E C
TI
O
N
/1
M M
A N
U A
LS
S
E C
TI
O
N
/1
O D
U C
T D
A
TA
S
E C
TI
O
N
/1
O D
U C
T D
TA
E C
TI
O
N
/3
TS
AF
F or m
ED
U
LE
O F
M
AT
ER
IA
LS
S
U B
M
IT
TA
LS
Pr oj ec t N um be r Pr oj ec t T ita tio n/ C on tra ct N um be r Q
JV
F
-1
C on st ru ct L ift S ta
B
E C
O M
PL
ET
ED
B
Y
PR
O
JE
C T
EN
G
IN
B E
C O
M
PL
ET
ED
B Y
C O
N
TR
AC
TO
R A
D M
IN
IS
TR
AT
be r o f C op ie s R eq ui re d
LINE NUMBER
IT
EM
O R
D
ES
C R
IP
TI
O N
O F
IT
EM
C
O N
TR
A
C T
R
EF
ER
EN
C E, T
YP
E O
F
SU
B M
IT
TA
L
CERTIFICATION OF
COMPLIANCE
SHOP DRAWINGS
SAMPLES
COLOR SELECTION
MANUFACTURER'S
RECOMMENDATIONS
MANUFACTURER'S
WARRANTY
CATALOG DATA
OPERATING
INSTRUCTIONS
TESTS
OTHER
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE
SUBMITTAL NUMBERS
D A
TE
C
O N
TR
A
C
TO
R N
O
TI
FI
ED
CONTRACTOR
RESUBMITTAL
FINAL APPROVAL
R
EM
A R
K S
A
PP
R O
VE
D
D
R
O
VE
D
S
E C
TI
O
N
/1
O D
U C
T D
A
TA
S
E C
TI
O
N
/1
O D
U C
T D
A
TA
S
E C
TI
O
N
T R
E S
U
LT
S
S
E C
TI
O
N
/1
O D
U C
T D
A
TA
S
E C
TI
O
N
TS
END
TE
S
TS
S
E C
TI
O
N
/1
O P
D R
A W
IN
G
S
S
E C
TI
O
N
TS
S
E C
TI
O
N
/1
O P
D R
A W
IN
G
D OF SECTION
01300-5 AF
F or m
SECTION 01400
QUALITY CONTROL
1.1 REQUIREMENTS INCLUDED:
1.1.1 General Quality Control.
1.1.2 Workmanship.
1.1.3 Manufacturers' Instructions.
1.1.4 Manufacturers' Certificates.
1.1.5 Manufacturers' Field Services.
1.1.6 Testing Laboratory Services.
1.2 RELATED REQUIREMENTS:
1.2.1 Section 01300 - Submittals: Submittal of Manufacturers' Instructions.
1.2.3 Section 03005 - Concrete: Tests required for concrete.
1.3 QUALITY CONTROL: Maintain quality control over suppliers, manufac-turers, products, services, site conditions, and workmanship, to produce work of specified quality.
1.4 WORKMANSHIP:
1.4.1 Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship.
1.4.2 Perform work by persons qualified to produce workmanship of specified quality.
1.4.3 Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking.
1.5 MANUFACTURERS' INSTRUCTIONS: Comply with instructions in full detail, including each step in sequence. Should instructions conflict with Contract Documents, request clarification from Architect/Engineer before proceeding.
1.6 MANUFACTURERS' CERTIFICATES: When required by individual
Specifications Section, submit manufacturer's certificate (five copies) that products meet or exceed specified requirements.
1.8 MANUFACTURERS' FIELD SERVICES:
01400 - 1
01400 - 2
1.8.1 When specified in respective Specification Sections, require supplier to provide qualified personnel to observe field conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance of equipment as applicable, and to make appropriate recommendations.
1.8.2 Representative shall submit written report to Architect/ Engineer listing observations and recommendations.
1.9 TESTING LABORATORY SERVICES:
1.9.1 Contractor shall employ and (pay) for services of an
Independent Testing Laboratory to perform inspections, tests, and other services required by individual Specification Sections.
1.9.2 Services will be performed in accordance with requirements of governing authorities and with specified standards.
1.9.3 Reports will be submitted to Architect/Engineer in duplicate giving observations and results of tests, indicating compliance or non-compliance with specified standards and with Contract Documents.
1.9.4 Contractor shall cooperate with Testing Laboratory personnel;
furnish tools, samples of materials, design mix, equipment, storage and assistance as requested.
1.9.4.1 Notify Architect/Engineer and Testing Laboratory
24Öhours prior to expected time for operations requiring testing services.
1.9.4.2 Make arrangements with Testing Laboratory and pay for additional samples and tests for Contractor's convenience.
SECTION 01430
ENVIRONMENTAL PROTECTION
1.1 The Contractor shall perform all work in such manner as to minimize the polluting of air, water, or land, and shall, within reasonable limits, control noise and the disposal of solid waste materials, as well as other pollutants. The Contractor shall be responsible for implementing the terms and requirements of NPDES PERMIT REQUIREMENTS FOR STORM WATER DISCHARGES FROM
CONSTRUCTION SITES.
1.2 IMPLEMENTATION: Within 20 calendar days after Notice to Proceed and prior to commencement of the work at the site, the Contractor shall:
1.2.1 Detail his proposal for implementing the requirements for environmental pollution control specified herein.
1.2.2 Meeting: Meet with representatives of the Contracting Officer to review and alter his proposal as needed for compliance with the environmental pollution control program,
3. EXECUTION:
3.1 PRECONSTRUCTION SURVEY: Prior to start of any on-site construction activities, the Contractor and the Contracting Officer shall make a joint condition survey after which the Contractor shall prepare a brief report indicating on a layout plan the condition of trees, shrubs and grassed areas immediately adjacent to the site of the work and adjacent to his assigned storage area and access route as applicable. This report will be signed by both the Contracting Officer and Contractor upon mutual agreement as to its accuracy and completeness.
3.2 PROTECTION OF LAND AREAS: Except for work areas, storage areas, or access routes specifically assigned for the use of the Contractor under this contract, the land areas outside the limits of permanent work performed under this contract shall be preserved in their present condition. The Contractor shall confine his construction activities to areas defined for work on the plans or specifically assigned for his use. Storage and related areas and access routes required temporarily by the Contractor in the performance of the work will be assigned by the Contracting Officer.
3.3 PROTECTION OF TREES AND SHRUBS: Except for trees or shrubs marked on the plans to be removed, the Contractor shall not deface, injure or destroy trees or shrubs, nor remove or cut them without special authority. No ropes, cables, or guys shall be fastened to or attached to any existing nearby trees for anchorage.
3.3.1 Tree Protective Structures: Where, in the opinion of the Contracting Officer, trees may possibly be defaced, bruised, injured, or otherwise damaged by the Contractor's equipment or by his other operations, he may direct the Contractor to provide temporary protection of such trees by placing boards, planks, or poles around them.
3.3.2 Restoration of Damaged Trees: Any tree scarred or damaged by the Contractor's equipment or operations shall be restored as nearly as possible to its original condition at the Contractor's expense. All scars
01430 - 1 made on trees not designated on the plans to be removed by construction operations shall be coated as soon as possible with an approved tree wound dressing. Trees that are to remain, either within or outside established clearing limits, that are damaged by the Contractor so as to be beyond saving in the opinion of the Contracting Officer shall be immediately removed, if so directed, and replaced with a nursery-grown tree of the same species and size.
3.4. PROTECTION OF WATER RESOURCES: The Contractor shall control the disposal of fuels, oils, bitumens, calcium chloride, acids or harmful materials, both on and off the Government premises and shall comply with applicable Federal, State, County and Municipal laws concerning pollution of rivers, streams, and wetlands while performing work under this contract.
Special measures shall be taken to prevent chemicals, fuels, oils, greases, bituminous materials, herbicides, and insecticides from entering public waters. Water used in on-site material processing, concrete curing, foundation and concrete cleanup, and other waste waters shall not be allowed to reenter a stream if an increase in the turbidity of the stream could result therefrom.
3.4.1 Disposal of Water generated during construction dewatering.
3.4.1.1 Dewatering of Groundwater: For temporary dewatering
of groundwater encountered during construction, the Contractor shall land apply all water generated at the locations indicated on drawings in accordance with Paragraph: LAND APPLICATION or surface discharge all generated water in accordance with Paragraph: SURFACE DISCHARGE.
3.4.2 Criteria For Disposal: Prior to dewatering, hydrostatic testing, disinfecting or flushing of lines, the Contractor shall submit a disposal plan detailing the method of disposal for approval. The disposal plan for Land Application shall include a sketch showing the construction site and the proposed location of the disposal of generated water. The disposal plan for Land Application shall also include a description of the equipment which will be used for the removal of water and a description of filtration methods to be implemented as needed. In addition, the date the discharge will begin, then of duration of discharge, and the rate of discharge shall be provided. If the method of disposal is Surface Discharge requiring a state issued permit, the documentation required for the application and issued permit will suffice as the disposal plan. For Sanitary Sewer discharge the disposal plan shall include the rate and location of discharge into the sewer.
3.4.2.1 Land Application: Land Application shall follow
State requirements, however no permit will be necessary. "Land application" implies that the Contractor shall discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, defined drainage areas, or discharge into the "waters of the State" shall occur. The Contractor shall contact the State of North Dakota, Division of Water Quality, Water Quality and Permit Program to discuss the water quality parameters for chemical contaminants (such as chlorine), oil, grease and total suspended solids and shall ensure that all water intended for land application will meet the State requirements.
3.4.2.2 Surface Discharge: Surface discharge shall be in
accordance with North Dakota's National Pollutant Discharge Elimination System (NPDES) General Permit for Construction Dewatering and/or Hydrostatic Testing #NDG-070000. "Surface discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, creeks, or "waters of the State" and require a discharge permit. The State of North Dakota requires a minimum of 30 days to process the permit application. Prior to
01430 - 2 dewatering, the Contractor shall submit a copy of the completed application form, a copy of the North Dakota NPDES General Permit for Construction Dewatering and /or Hydrostatic Testing #NDG-070000 issued by the State of North Dakota for this contract any subsequent reports and/or information required by the permit or State.
3.5 WASTE DISPOSAL: As part of his proposed implementation under paragraph 1.2, and prior to on-site construction, the Contractor shall submit a description of his scheme for handling and disposing of all waste resulting from the work under this contract. If any waste is dumped in unauthorized areas, the Contractor shall remove the waste and restore the area to the condition of the adjacent undisturbed areas. Where directed, soil which is contaminated by the Contractor shall be excavated, disposed of as approved by the Contracting Officer, and replaced with suitable fill material, all at the expense of the Contractor.
3.6 BURNING: Burning shall be prohibited on the Government premises.
3.7 DUST CONTROL: The Contractor shall maintain all excavations, embankments, stockpiles, access roads, plant sites, waste areas, borrow areas, and all other work areas free from excess dust to such reasonable degree as to avoid causing a hazard or nuisance. Temporary methods consisting of sprinkling, chemical treatment, light bituminous treatment or similar methods will be permitted to control dust. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs.
3.8 EROSION AND SEDIMENT CONTROL: The Contractor shall be responsible for providing erosion and sediment control measures in accordance with local, state, and federal regulations. The erosion and sediment controls selected and maintained by the Contractor shall be such that local, state, and federal water quality standards are not violated as a result of the Contractor's construction activities. The area of bare soil exposed at any one time by construction operations should be held to a minimum. For areas subject to erosion including, but not limited to, steep slopes, soils spreading areas, and stockpile areas, the Contractor shall disturb as little vegetation as possible, minimize the period of time that the soil is exposed, prevent surface water runoff from flowing across disturbed areas, stabilize disturbed soils as soon as possible, and provide adequate drainage for the increased runoff. Sedimentation/erosion control features may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. Runoff management practices should be employed in areas where the potential for storm water contamination exists that can not be addressed by a prevention or source reduction measure. Runoff management procedures may include vegetative swales, reuse of collected storm water, infiltration devices, and detention/sedimentation basins. Any erosion and sediment control measures which are damaged or found to be ineffective shall be remedied by the Contractor at no additional cost to the Government. Any areas damaged by erosion shall be repaired by the Contractor at no additional cost to the Government.
3.9 CORRECTIVE ACTION: The Contractor shall, upon receipt of a notice in writing of any noncompliance with the foregoing provisions, take immediate corrective action. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs of damages by the Contractor unless it was latter determined that the Contractor was in compliance.
01430 - 3
3.10 POST-CONSTRUCTION CLEANUP OR OBLITERATION: The Contractor shall, unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work. The disturbed areas shall be graded and filled and the entire area seeded.
3.11 SPILL PREVENTION AND RESPONSE PLAN: The Contractor shall include a Spill Prevention and Response Plan in the Implementation Proposal. The plan shall describe the Contractor's procedures for preventing and responding to spills of hazardous materials.
3.12 ARCHEOLOGICAL PRESERVATION: Should the Contractor uncover any skeletons, artifacts or other archeological remains during the course of excavation, the work shall be stopped and the Contracting Officer notified immediately.
3.13 NPDES PERMIT REQUIREMENTS FOR STORM WATER DISCHARGES FROM
CONSTRUCTION SITES:
3.13.1 Notice of Intent: The Contractor shall complete and submit a Notice of Intent (NOI) in accordance with the NDPDES general permit. A copy of the submitted Notice of Intent and Notice of Acceptance (NOA) shall be furnished to the Contracting Officer at least 2 days prior to the commencement of construction activities.
3.13.2 Storm Water Pollution Prevention Plan: The Contractor shall prepare, submit and implement a Storm Water Pollution Prevention Plan in accordance with the NDPDES general permit. Any temporary or permanent erosion and sedimentation control measures shown on the drawings shall be incorporated into the Contractor's Storm Water Pollution Prevention Plan. A copy of the Storm Water Pollution Prevention Plan shall be submitted to the Contracting Officer at least 2 days prior to the commencement of construction activities.
3.13.3 Inspections and Reporting: The Contractor shall be
responsible for all inspections and reporting required under the NDPDES general permit. Copies of each Inspection Report Form shall be furnished to the Contracting Officer.
3.13.4 Retention of Records: The Contractor shall retain copies of the storm water pollution prevention plan and all reports in accordance with the NDPDES general permit.
3.13.5 Notice of Termination: The Contractor shall complete and submit a Notice of Termination (NOT) in accordance with the NDPDES general permit. A copy of the submitted Notice of Termination shall be furnished to the Contracting Officer.
01430 - 4
01430 - 5
3.13.6 Renotification: If the current NDPDES general permit
expires prior to completion of construction, the Contractor shall request to retain coverage under a renewal of the permit in writing to the State at least 15 days prior to the expiration date of the permit. Upon request by the State, a new NOI shall be submitted. The Contractor shall provide certification to the State that the SWPP plan is accurate. The certification shall be submitted within 90 days after the coverage under the permit begins.
A copy of all submissions to the State shall be furnished to the Contracting Officer.
SECTION 01500
CONSTRUCTION FACILITIES & TEMPORARY CONTROLS
1.1.1 Electricity, Lighting.
1.1.2 Heat, Ventilation.
1.1.3 Telephone Service.
1.1.4 Water.
1.1.5 Sanitary Facilities.
1.1.6 Barriers.
1.1.7 Enclosures.
1.1.8 Protection of Installed Work.
1.1.9 Security.
1.1.10 Water Control.
1.1.11 Cleaning During Construction.
1.1.12 Project Identification.
1.1.13 Field Offices and Sheds.
1.2 RELATED REQUIREMENTS:
1.2.1 Outages.
1.2.1.1 Outages shall include:
1.2.1.1.1 Blocking of Roadway.
1.2.1.1.2 Blocking of Parking Lots.
1.2.1.1.3 Power Outages.
1.2.1.1.4 High Temperature Hot Water Lines.
1.2.1.2 Notification
1.2.1.2.1 The Contractor shall notify the inspector, in writing, seven days in advance of the intended outage.
1.2.1.2.2 The Contractor shall notify the Fire
Department of an intended roadway blockage.
01500 - 1
1.3 REGULATIONS: The Contractor shall comply with the prevention practice contained in NFPA Standard #241, Standard for Safeguarding Building Construction and Demolition Operations.
1.4 ELECTRICITY:
1.4.1 All reasonable quantities of utilities will be made available to the Contractor at no charge.
1.4.2 Provide service required for construction operations, with branch wiring and distribution boxes located to allow service and lighting by means of Construction-type power cords.
1.4.3 Provide lighting for construction operations.
1.4.4 Existing and permanent lighting may be used during
construction. Maintain lighting and make routine repairs.
1.4.5 Refer to Section 16010 - Electrical General Provisions for electrical outage requirements.
1.5 HEAT, VENTILATION:
1.5.1 Provide as required to maintain specified conditions for construction operations, to protect materials and finishes from damage due to temperature or humidity.
1.5.2 Coordinate use of existing facilities with Using Agency;
extend and supplement with temporary units as required to maintain specified conditions for construction operations, to protect materials and finishes from damage due to temperature or humidity. The Government will furnish all Contractor energy.
1.5.3 Prior to operation of permanent facilities for temporary purposes, verify that installation is approved for operation, and that filters are in place. Provide for operation and maintenance.
1.5.4 Provide ventilation of enclosed areas to cure materials, to disperse humidity, and to prevent accumulations of dust, fumes, vapors, or gases.
1.6 TELEPHONE SERVICE:
1.6.1 Provide telephone service to field office.
1.6.2 Contractor shall pay all telephone related expenses including installation and disconnection.
1.7 WATER:
1.7.1 Provide service required for construction operations. Extend branch piping with outlets located so that water is available by use of hoses.
1.8 SANITARY FACILITIES:
1.8.2 Designated existing facilities may be used during construction operations; maintain in sanitary condition.
01500 - 2
1.8.4 Sanitary facilities in occupied housing units shall not be used.
1.9 BARRIERS:
1.9.1 Provide as required to prevent public entry to construction areas and to protect existing facilities and adjacent properties from damage from construction operations.
1.9.3 Provide barricades as required by governing authorities for public right-of-way and for public access to existing building.
1.9.4 Provide barriers around trees and plants designated to remain.
Protect against vehicular traffic, stored materials, dumping, chemically injurious materials, and puddling or continuous running water.
1.10 ENCLOSURES:
1.10.1 Provide temporary weather-tight closures of openings in exterior surfaces to provide acceptable working conditions and protection for materials, to allow for temporary heating, and to prevent entry of unauthorized persons. Provide doors with self-closing hardware and locks.
1.10.2 Provide temporary partitions and ceilings as required to separate work areas from Using Agency occupied areas, to prevent penetration of dust and moisture into occupied areas, to prevent damage to existing areas and equipment. Construction: Framing and sheet materials with closed joints and sealed edges at intersections with existing surfaces.
1.11 PROTECTION OF INSTALLED WORK:
1.11.1 Provide temporary protection for installed products.
Control traffic in immediate area to minimize damage.
1.11.2 Provide protective coverings at walls, projections, jambs, sills, and soffits of openings. Protect finished floors and stairs from traffic, movement of heavy objects, and storage.
1.11.3 Prohibit traffic and storage on waterproofed and roofed surfaces, on lawn and landscaped areas.
1.12 SECURITY:
1.12.1 Provide security program and Using Agency's facilities to protect work, (existing facilities,) and Using Agency's operations from unauthorized entry, vandalism, and theft. Coordinate with Contracting Officer and Security Police.
1.13 WATER CONTROL:
1.13.1 Grade site to drain. Maintain excavations free of water.
Provide and operate pumping equipment as required.
1.14 CLEANING DURING CONSTRUCTION:
1.14.1 Control accumulation of waste materials and rubbish;
periodically dispose of off-site daily.
01500 - 3
01500 - 4
1.14.2 Clean interior areas prior to start of finish work, maintain areas free of dust and other contaminants during finishing operations.
1.15 FIELD OFFICES AND SHEDS:
1.15.1 Office: Weather-tight, with lighting, electrical outlets, heating, and ventilating equipment.
1.15.2 Storage Sheds for Tools, Materials, and Equipment: Weather-tight with heat and ventilation for products requiring controlled conditions, with adequate space for organized storage and access, and lighting for inspec-tion of stored materials.
1.16 REMOVAL:
1.16.1 Remove temporary materials, equipment, services, and
construction prior to substantial completion inspection.
1.16.2 Clean and repair damage caused by installation or use of temporary facilities and services; restore existing facilities used during construction to specified, or to original condition.
1.16.3 The Contractor shall daily maintain the site in a clean and orderly manner in accordance with Corp of Engineers Manual EM 385-1-1.
1.16.4 Asbestos.
1.16.4.1 Transportation of asbestos materials shall be in
accordance with North Dakota Century Code, Section 33-15-13-02.
1.16.4.2 Disposal of asbestos material shall be in
accordance with Environmental Protection Agency "Standards for Owners and Operators of Hazardous Waste Treatment, Storage and Disposal Facilities," as published in Vol. 45, No. 98 of the Federal Register, Monday, May 19, 1980, (40 CFR Parts 264 and 265, FRL 1446-8).
1.16.4.3 Submit a notarized statement from the Disposer that
said disposal met all requirements of this regulation and any applicable state regulations.
3. EXECUTION: Not Used.
SECTION 01700
CONTRACT CLOSE-OUT
1.1.1 Closet Procedures.
1.1.2 Final Cleaning.
1.1.3 Project Record Documents.
1.1.4 Operation and Maintenance Data.
1.1.5 Warranties and Bonds.
1.1.6 Spare Parts and Maintenance Materials.
1.2 RELATED REQUIREMENTS:
1.2.1 Section 01005 - Administrative Provisions,
1.2.2 Section 01500 - Construction Facilities and Temporary
Controls: Cleaning during construction.
1.3 CLOSE-OUT PROCEDURES:
1.3.1 Using Agency will occupy designated portion of project for the purpose of conduct of business), under provision stated in Certificate of Substantial Completion.
1.3.2 When Contractor considers Work has reached final completion, submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for final inspection.
1.4 FINAL CLEANING:
1.4.1 Execute prior to final inspection.
1.4.2 Clean interior and exterior surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces. Clean equipment and fixtures to a sanitary condition, clean or replace filters of mechanical equipment. Clean roofs, gutters, downspouts, and drainage systems.
01700 - 1
MIN 98-3002
SECTION 01710
FINAL CLEANING
1.1.1 Final cleaning of project.
1.2 RELATED REQUIREMENTS:
1.2.1 Individual Specifications Sections: Specific cleaning for product or work.
1.3 DESCRIPTION:
1.3.1 Execute cleaning prior to inspection for Final Completion of the work.
1.3.2 Execute exterior and site cleaning.
2. PRODUCTS:
2.1 CLEANING MATERIALS:
2.1.1 Use materials which will not create hazards to health or property, and which will not damage surfaces.
2.1.2 Use only materials and methods recommended by manufacturer of material being cleaned.
3. EXECUTION:
3.1 CLEANING:
3.1.1 In addition to removal of debris and cleaning specified in other sections, clean interior and exterior exposed-to-view surfaces.
3.1.2 Remove temporary protection and labels not required to remain.
3.1.3 Clean finishes free of dust, stains, films and other foreign substances.
3.1.4 Clean transparent and glossy materials to a polished
condition; remove foreign substances. Polish reflective surfaces to a clear shine.
3.1.5 Vacuum clean carpeted and similar soft surfaces.
3.1.6 Clean, damp mop and wax & polish, all resilient and hard surface floors as specified.
3.1.7 Clean surfaces of equipment; remove excess lubrication.
3.1.9 Clean permanent filters of ventilating equipment and replace disposable filters when units have been operated during construction; in
01710 - 1
01710 - 2 addition, clean ducts, blowers, and coils when units have been operated without filters during construction.
3.1.10 Clean light fixtures and lamps.
3.1.11 Maintain cleaning until substantial completion, completion, or occupancy by Using Agency.
3.1.12 Remove waste, foreign matter, and debris from roofs, gutters, area ways, and drainage systems.
3.1.13 Remove waste, debris, and surplus materials from site. Clean ground; remove stains, spills and foreign substances from paved areas and sweep clean.
DIVISION 2 - SITEWORK
SECTION 02005
SITEWORK
1.1 PROTECTION:
1.1.1 Protect trees, shrubs, lawns, walks, and other features remaining as portion of final landscaping.
1.1.2 Protect bench marks, existing structures, paving and curbs.
1.1.3 Protect above-and below-grade utilities which are to remain.
1.1.4 Repair damage.
1.1.5 Protect excavations as required to prevent cave-in or loose soil from falling into excavations.
1.1.6 Notify Contracting Officer of unexpected subsurface conditions and discontinue work in affected areas until notified to resume work.
1.1.7 Grade excavation perimeter to prevent surface water run-off from entering into excavation.
1.2 PERMITS:
1.2.1 AF Form 103: The Contractor shall obtain from Construction Management, 5 Summit Drive, an approved AF Form 103, "Base Civil Engineer Work Clearance Request," prior to proceeding with an actual excavation.
1.3 REFERENCES:
1.3.1 ASTM C 136: Sieve analysis of fine and course aggregates.
1.3.2 ASTM D 698: Tests for moisture - Density Relations of Soils and Soil-Aggregate Mixtures using…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .