Answers to Questions received at Site Visit (17 July 2019).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA2_Bldg_503_SV_23_July_19.pdf | ||
| Sol_Amendment_0001_Bldg_503_FA449719RA032.pdf | ||
| Bldg_503_Roof_Warranty.pdf | ||
| Bldg_503_As_Builts.pdf | ||
| Attach_1_SOW_Replace_Existing_Variable_Refrigerant_Flow_(VRF)_B503_V3.pdf | ||
| Attach_2_Rates_of_Wages_Building_DE20190007_06_21_2019.pdf | ||
| Bldg_503_HVAC_Solicitation_-_FA449719RA032.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Questions & Answers
18 April 2019 Page 1 of 218 April 2019 Page 1 of 2
Program Title: Replace VRF at Bldg 503
Contracting Office: 436 CONS/PKA
Solicitation #: FA449719RA032
Subject: Project/TRIRIGA No. 1076659
Summary of Site Visit (if applicable) Two site visits were conducted for this project: one on 17 July 2019 at 1300 and one on 23 July 2019 at 1300.
Question Answer
Please provide as-built drawings for B503. Added. Attached with solicitation attachments.
Scope calls for single zone VAV, please confirm you do not want a dedicated mini-split for the IT room to provide independent temperature control for this space. The single-zone VAV will only have one temperature sensor, and this space will not be controlled as indicated in the SOW.
This is correct, single zone VAV as specified in SOW. Minimal comm equipment in room currently. Ductwork should be sized appropriately for room size and slight equipment load.
SOW states to keep the building at slight positive pressure.
There are existing EFs and other air devices. Please provide information on these EFs so we can size the unit accordingly.
o We also need to confirm the existing ERV is sized properly.
o Should the control system monitor and control the space pressure?
Refer to attached as-builts for fan schedule.
The current E-Stop is not the base standard, should it be changed to the base standard? Yes.
The building controller is an old model and not the base standard. This is going to have to be updated as well. Please confirm this is the intent.
This is the intent to match base standard.
Should existing EFs be integrated into the emergency shutdown sequence as part of this project? This is an ATFP requirement.
Yes
Should all remaining HVAC equipment be tied into the new BAS System, or can the existing space heaters in the warehouse area remain stand-alone?
Leave the warehouse section as stand alone.
The warehouse area has electric unit heaters. We did not observe any control monitoring devices during the site visit.
Does DAFB want this space monitored?
This space does not need to be monitored.
The SOW states that the bathroom in the warehouse is to maintain positive pressure. Is this correct?
This requirement will be waived as mini-splits do not have a feasible option to provide positive pressure without makeup.
Also, we need to know the CFMs for the warehouse bathroom exhaust fan. Confirm that the intent is to guarantee positive pressure in the Warehouse bathroom without the use of terminal VAV equipment (single-zone VAV).
Refer to fan schedule on Mechanical section of as-builts.
18 April 2019 Page 2 of 2
Question Answer
There will be parking spaces lost if we install the exterior equipment in the location provided in the SOW. Will striping be required closing these spots off?
o Will bollards be required be required around this unit?
o The DAFB Design Guide requires 12” clear around equipment for ALL exterior pads. This pad may extend beyond the parking spaces when all is said and done. Please confirm this is acceptable.
1. Striping will be required IF adjusting parking spot locations.
2. This is acceptable. Include desired drawings through design phase.
Per ATFP, do we need to construct a fenced in enclosure with a roof around the exterior equipment? No, Waived
Please confirm full commissioning is required for this project. We need the controls commissioned by control installer and
Will this building be occupied during construction? Yes
Please confirm if rebalancing of this building is required beyond the new equipment.
If any modifications are made to the ERV system, then system should be balance. Beyond that, none additional.
Is temporary conditioning required as part of this contract? Yes, individual office/portable A/Cs are acceptable for this requirement. Condenser ducted into ceiling tile or out of window
Is a full time superintendent required for this project? A full time superintendent is required for this project
Is a dedicated full time QC Manager required for this project? A QC must be appointed as designated in DAFB Design Guide
Should ceiling tile be replaced with the tile specified in the DAFB Design Guide? Yes
Should new ceilings be installed throughout the building?
Large sections will need to be removed for installation of new duct work.
Replace with existing
Are we required to provide airflow monitoring to the ERV per the UFC? No, Waived
Date
30 July 2019
JOSEPH P. GANNON, TSgt, USAF Project Manager
436 CES/CENMP
Signature
Date
02 Aug 2019
ANDRE JACKSON, Civ
436 CONS/PKA
677-4671
Signature
18 April 2019 Page of Summary of Site Visit (if applicable) Question Answer 9.0.0.2.20120627.2.874785
| Security_Markings: |
| CurrentPage: |
| PageCount: |
| Program-Title: Replace VRF at Bldg 503 |
| Contracting-Office: 436 CONS/PKA |
| Contracting-Office: FA449719RA032 |
| Basic_Quantity: Project/TRIRIGA No. 1076659 |
| TextField1: Two site visits were conducted for this project: one on 17 July 2019 at 1300 and one on 23 July 2019 at 1300. |
| Add: |
| Cell1: Please provide as-built drawings for B503. |
| Cell1: Scope calls for single zone VAV, please confirm you do not want a dedicated mini-split for the IT room to provide independent temperature control for this space. The single-zone VAV will only have one temperature sensor, and this space will not be controlled as indicated in the SOW. |
| Cell1: SOW states to keep the building at slight positive pressure. There are existing EFs and other air devices. Please provide information on these EFs so we can size the unit accordingly. |
o We also need to confirm the existing ERV is sized properly.
o Should the control system monitor and control the space pressure?
| Cell1: The current E-Stop is not the base standard, should it be changed to the base standard? |
| Cell1: The building controller is an old model and not the base standard. This is going to have to be updated as well. Please confirm this is the intent. |
| Cell1: Should existing EFs be integrated into the emergency shutdown sequence as part of this project? This is an ATFP requirement. |
| Cell1: Should all remaining HVAC equipment be tied into the new BAS System, or can the existing space heaters in the warehouse area remain stand-alone? |
| Cell1: The warehouse area has electric unit heaters. We did not observe any control monitoring devices during the site visit. Does DAFB want this space monitored? |
| Cell1: The SOW states that the bathroom in the warehouse is to maintain positive pressure. Is this correct? |
| Cell1: Also, we need to know the CFMs for the warehouse bathroom exhaust fan. Confirm that the intent is to guarantee positive pressure in the Warehouse bathroom without the use of terminal VAV equipment (single-zone VAV). |
| Cell1: There will be parking spaces lost if we install the exterior equipment in the location provided in the SOW. Will striping be required closing these spots off? |
o Will bollards be required be required around this unit?
o The DAFB Design Guide requires 12” clear around equipment for ALL exterior pads. This pad may extend beyond the parking spaces when all is said and done. Please confirm this is acceptable.
| Cell1: Per ATFP, do we need to construct a fenced in enclosure with a roof around the exterior equipment? |
| Cell1: Please confirm full commissioning is required for this project. |
| Cell1: Will this building be occupied during construction? |
| Cell1: Please confirm if rebalancing of this building is required beyond the new equipment. |
| Cell1: Is temporary conditioning required as part of this contract? |
| Cell1: Is a full time superintendent required for this project? |
| Cell1: Is a dedicated full time QC Manager required for this project? |
| Cell1: Should ceiling tile be replaced with the tile specified in the DAFB Design Guide? |
| Cell1: Should new ceilings be installed throughout the building? Large sections will need to be removed for installation of new duct work. |
| Cell1: Are we required to provide airflow monitoring to the ERV per the UFC? |
| Cell3: Added. Attached with solicitation attachments. |
| Cell3: This is correct, single zone VAV as specified in SOW. Minimal comm equipment in room currently. Ductwork should be sized appropriately for room size and slight equipment load. |
| Cell3: Refer to attached as-builts for fan schedule. |
| Cell3: Yes. |
| Cell3: This is the intent to match base standard. |
| Cell3: Yes |
| Cell3: Leave the warehouse section as stand alone. |
| Cell3: This space does not need to be monitored. |
| Cell3: This requirement will be waived as mini-splits do not have a feasible option to provide positive pressure without makeup. |
| Cell3: Refer to fan schedule on Mechanical section of as-builts. |
| Cell3: 1. Striping will be required IF adjusting parking spot locations. |
2. This is acceptable. Include desired drawings through design phase.
| Cell3: No, Waived |
| Cell3: We need the controls commissioned by control installer and |
| Cell3: Yes |
| Cell3: If any modifications are made to the ERV system, then system should be balance. Beyond that, none additional. |
| Cell3: Yes, individual office/portable A/Cs are acceptable for this requirement. Condenser ducted into ceiling tile or out of window |
| Cell3: A full time superintendent is required for this project |
| Cell3: A QC must be appointed as designated in DAFB Design Guide |
| Cell3: Yes |
| Cell3: Replace with existing |
| Cell3: No, Waived |
| Date: 30 July 2019 |
| Date: 02 Aug 2019 |
| Name: |
| Signature: |
| TextFieldStyle1: |
| TextFieldStyle2: |
| TextFieldStyle3: |
| TextFieldStyle4: |
| TextFieldStyle5: |
| TextFieldStyle6: |
| TextFieldStyle7: |
| TextFieldStyle8: |
| TextFieldStyle9: |
| TextFieldStyle10: |
| TextFieldStyle11: |
| TextFieldStyle12: |
| TextFieldStyle13: |
| TextFieldStyle14: |
| TextFieldStyle15: |
| TextFieldStyle16: |
| TextFieldStyle17: |
| TextFieldStyle18: |
| TextFieldStyle19: |
| TextFieldStyle20: |
| TextFieldStyle21: |
| TextFieldStyle22: |
| TextFieldStyle23: |
| TextFieldStyle24: |
| TextFieldStyle25: |
| TextFieldStyle26: |
| TextFieldStyle27: |
| TextFieldStyle28: |
| TextFieldStyle29: |
| TextFieldStyle30: |
File details come from the government source that posted it.