Bldg_503_As_Builts.pdf
PDF 18 MB Posted
- Attached to
- Replace Existing Variable Refrigerant Flow (VRF) with HVAC at Bldg. 503 Federal contract opportunity
- Solicitation number
- FA449719RA032
About this file
Bldg. 503 As-Built Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA1_Bldg_503_SV_17_July_19.pdf | ||
| QA2_Bldg_503_SV_23_July_19.pdf | ||
| Sol_Amendment_0001_Bldg_503_FA449719RA032.pdf | ||
| Bldg_503_Roof_Warranty.pdf | ||
| Attach_1_SOW_Replace_Existing_Variable_Refrigerant_Flow_(VRF)_B503_V3.pdf | ||
| Attach_2_Rates_of_Wages_Building_DE20190007_06_21_2019.pdf | ||
| Bldg_503_HVAC_Solicitation_-_FA449719RA032.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
As-Built Drawings
REPAIR FLEET SERVICE FACILITY 503
DOVER AFB, DELAWARE
Contract Number: FA8903-06-D-8513 Project Numbers: FJXT 02-1015 Task Order Number: 32
Prepared for:
AIR FORCE CENTER FOR ENGINEERING
AND THE ENVIRONMENT
3300 Sidney Brooks Dr, Building 532 Brooks City Base, TX 78235-5135
General Contractor:
Innovative Technical Solutions, Inc.
2730 Shadelands Drive, Suite 100 Walnut Creek, CA 94598
DRAWING INDEX SHEET
SHEET TITLE
ARCHITECTURAL
A-001 DRAWING INDEX
A-002 GENERAL
A-003 LOCATION MAP & OVERALL SITE PLAN
A-004 ADA DETAILS
AD-101 DEMOLITION PLAN & DEMOLITION KEYNOTES
AD-201 ELEVATIONS - DEMOLITION
A-101 OVERALL FLOOR PLAN AND ENLARGED PARTIAL PLANS
A-121 REFLECTED CEILING PLAN & CEILING TYPE LEGEND
A-141 ROOF PLAN
A-201 BUILDING EXTERIOR ELEVATIONS
A-202 ENLARGED EXTERIOR ELEVATIONS
A-301 BUILDING & WALL SECTIONS
A-302 WALL SECTIONS
A-401 INTERIOR ELEVATIONS
A-521 PARTITION TYPES
A-541 SECTION DETAILS
A-542 ENLARGED STAIR ELEVATION & HANDRAIL DETAILS
A-601 DOOR SCHEDULE, DETAILS & ELEVATIONS
A-602 DOOR DETAILS
A-621 WINDOW SCHEDULE, DETAILS & TYPES
A-631 INTERIOR FINISH PLAN & FINISH LEGEND
A-632 COLOR SCHEDULE - INTERIOR & EXTERIOR
STRUCTURAL
S-001 GENERAL NOTES
S-101 FOUNDATION PLAN
S-102 ROOF FRAMING PLAN
S-401 DETAILS
S-402 DETAILS
S-403 DETAILS
SD-101 STRUCTURAL DEMOLISH PLAN
SK01 RAMP PLAN AND DETAILS
CIVIL
CD-101 SITE DEMOLITION PLAN
CS-101 SITE AND UTILITY PLAN
CS-501 DETAIL SHEET
SC-502 DETAIL SHEET
MECHANICAL
M-100 FIRST FLOOR PLAN – REFRIGERANT PIPING MECHANICAL HVAC
M-101 FIRST FLOOR PLAN – DUCTWORK MECHANICAL HVAC
M-102 ROOF PLAN & SCHEDULES – MECHANICAL HVAC
M-103 SEQUENCE OF OPERATIONS MECHANICAL HVAC
PLUMBING
DP-100 FIRST FLOOR PLAN- DEMOLITION WASTE/VENT PIPING
PL-101 FIRST FLOOR PLAN – SERVICE PIPING
PL-102 FIRST FLOOR PLAN – RISER DIAGRAM WASTE/VENT PIPING
FIRE PROTECTION
FP-1 BUILDING NO. 503 SPRINKLER PLAN & DETAILS
ELECTRICAL
E-100 LIGHTING PLAN & FIXTURE SCHEDULE - ELECTRICAL
E-101 POWER PLAN - ELECTRICAL
E-600 PANEL SCHEDULE - ELECTRICAL
E-601 LEGEND & MECHANICAL SCHEDULE - ELECTRICAL
F-1 FIRE ALARM AND MASS NOTIFICATION SYSTEMS
F-2 TYPICAL WIRING DIAGRAMS - FIRE ALARM AND MASS NOTIFICATION SYSTEMS
JG YL
GENERAL NOTES
S-001
FOUNDATION PLAN
S-101
ROOF FRAMING PLAN
S-102
DETAILS
S-401
S-402
S-403
STRUCTURAL DEMOLITION PLAN
SD-101
SK-1
File details come from the government source that posted it.