As-Built Drawings

REPAIR FLEET SERVICE FACILITY 503

DOVER AFB, DELAWARE

Contract Number: FA8903-06-D-8513 Project Numbers: FJXT 02-1015 Task Order Number: 32

Prepared for:

AIR FORCE CENTER FOR ENGINEERING

AND THE ENVIRONMENT

3300 Sidney Brooks Dr, Building 532 Brooks City Base, TX 78235-5135

General Contractor:

Innovative Technical Solutions, Inc.

2730 Shadelands Drive, Suite 100 Walnut Creek, CA 94598

DRAWING INDEX SHEET

SHEET TITLE

ARCHITECTURAL

A-001 DRAWING INDEX

A-002 GENERAL

A-003 LOCATION MAP & OVERALL SITE PLAN

A-004 ADA DETAILS

AD-101 DEMOLITION PLAN & DEMOLITION KEYNOTES

AD-201 ELEVATIONS - DEMOLITION

A-101 OVERALL FLOOR PLAN AND ENLARGED PARTIAL PLANS

A-121 REFLECTED CEILING PLAN & CEILING TYPE LEGEND

A-141 ROOF PLAN

A-201 BUILDING EXTERIOR ELEVATIONS

A-202 ENLARGED EXTERIOR ELEVATIONS

A-301 BUILDING & WALL SECTIONS

A-302 WALL SECTIONS

A-401 INTERIOR ELEVATIONS

A-521 PARTITION TYPES

A-541 SECTION DETAILS

A-542 ENLARGED STAIR ELEVATION & HANDRAIL DETAILS

A-601 DOOR SCHEDULE, DETAILS & ELEVATIONS

A-602 DOOR DETAILS

A-621 WINDOW SCHEDULE, DETAILS & TYPES

A-631 INTERIOR FINISH PLAN & FINISH LEGEND

A-632 COLOR SCHEDULE - INTERIOR & EXTERIOR

STRUCTURAL

S-001 GENERAL NOTES

S-101 FOUNDATION PLAN

S-102 ROOF FRAMING PLAN

S-401 DETAILS

S-402 DETAILS

S-403 DETAILS

SD-101 STRUCTURAL DEMOLISH PLAN

SK01 RAMP PLAN AND DETAILS

CIVIL

CD-101 SITE DEMOLITION PLAN

CS-101 SITE AND UTILITY PLAN

CS-501 DETAIL SHEET

SC-502 DETAIL SHEET

MECHANICAL

M-100 FIRST FLOOR PLAN – REFRIGERANT PIPING MECHANICAL HVAC

M-101 FIRST FLOOR PLAN – DUCTWORK MECHANICAL HVAC

M-102 ROOF PLAN & SCHEDULES – MECHANICAL HVAC

M-103 SEQUENCE OF OPERATIONS MECHANICAL HVAC

PLUMBING

DP-100 FIRST FLOOR PLAN- DEMOLITION WASTE/VENT PIPING

PL-101 FIRST FLOOR PLAN – SERVICE PIPING

PL-102 FIRST FLOOR PLAN – RISER DIAGRAM WASTE/VENT PIPING

FIRE PROTECTION

FP-1 BUILDING NO. 503 SPRINKLER PLAN & DETAILS

ELECTRICAL

E-100 LIGHTING PLAN & FIXTURE SCHEDULE - ELECTRICAL

E-101 POWER PLAN - ELECTRICAL

E-600 PANEL SCHEDULE - ELECTRICAL

E-601 LEGEND & MECHANICAL SCHEDULE - ELECTRICAL

F-1 FIRE ALARM AND MASS NOTIFICATION SYSTEMS

F-2 TYPICAL WIRING DIAGRAMS - FIRE ALARM AND MASS NOTIFICATION SYSTEMS

JG YL

GENERAL NOTES

S-001

FOUNDATION PLAN

S-101

ROOF FRAMING PLAN

S-102

DETAILS

S-401

S-402

S-403

STRUCTURAL DEMOLITION PLAN

SD-101

SK-1