Statement of Work - Partition Walls.pdf
PDF 34 KB Posted
- Attached to
- Operable Partition Walls
- Solicitation number
- FA4484-12-T-0056
About this file
Statement of Work for Operable Partition Walls
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A.pdf | ||
| Solicitation - 24 Aug.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
BUILDING 2215 ACCORDION STYLE PARTITIONS
JB MDL, NJ
1.0. DESCRIPTION OF SERVICES: Work shall include the delivery, assembly and installation of two (2) electrically operated partition walls in the auditorium of building 2216, Joint Base McGuire- Dix-Lakehurst, NJ (JB MDL).
2.0. REQUIREMENTS
2.1. The contractor shall remove the two (2) existing manually operated partition walls and then install two (2) electrically operated partition walls in same location as the original panel style partitions (see figure 1). The dimensions for the new partitions are approx. 15’ high by 48’ wide.
2.2. Product shall be all steel construction with panels welded to the frame. Partition shall have an STC of 45 or greater. The finishing surface shall be heavy vinyl or equivalent (washable) on both sides.
2.3. Product shall be continuously hinged, and electrically operated.
2.4. Partitions shall include single passage doors near the center of each wall, washable surfaces, and classroom sized whiteboards (~3-4 ft) incorporated into one side of the front partition and both sides of the rear partition (see figure 1.).
2.5. The wall color shall be selected by the government at the time of award. The winning contractor shall provide available colors for selection.
Figure 1 – Partition Locations
2.6. The wall panels/track/roller system must be of sturdy construction (steel or equivalent).
2.7. The contractor shall install finish trim (if required) after the partition walls are installed.
STAGE
White board on rear section of front partition.
White boards on both sides of rear partition.
2.8. The contractor shall be responsible for the repair or replacement of any items that were damaged during the shipment or items or facilities damaged by anyone in the contractor’s employment.
2.9. The contractor shall remove all packing materials and work related debris from the facility at the end of each work day and shall remove all work related debris from the base at the completion of the project.
2.10. All tools (including any height lifts and/or ladders ), labor and/or material handling equipment required to perform the work identified in this SOW shall be provided by the contractor.
Government furnished property will not be provided.
2.11. The contractor shall be responsible for connecting the electrical component(s) of the partition walls to an electrical supply point. The government shall ensure all the required work orders are approved by JB MDL Civil Engineering prior to the contractor starting any electrical work.
3.0. SPECIAL REQUIREMENTS: The work site shall remain clean and clutter free since this area is an active employment site. All dumpsters or other containers for trash and debris shall be located in areas designated by the building manager and shall be subject to removal and /or relocation at the building manager’s request. The contractor shall be required to work Monday through Friday from 0730-1630 hours, excluding federal holidays.
4.0. POINTS OF CONTACT: The government will have a point of contact (POC) available during the performance of work to coordinate the placement of all items. In addition, the government may provide lists and drawings indicating the items to be installed and the placement of those items. At the time the work begins, the contractor shall designate a responsible employee to supervise work and to coordinate with the POC. The contractor's supervisor shall be on site during the time any work is being performed by the contractor's employees.
5.0. BASE ENTRY: The contractor shall obtain the necessary passes and /or identification for entry into JB MDL for all employees prior to commencement of work. The government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the government. The contractor shall be required to provide the security forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s) to obtain a pass for entry onto the base. The pass and registration building is located inside the twenty-four (24) hour gate right off of Wrightstown / Cookstown Rd.
6.0. SECURITY FORCE AND FIRE PROTECTION: The base security police telephone number is 609-754-2001 and the base fire department telephone number is 911 for reporting a fire. General information telephone number is 609-754-3326.
7.0. PERFORMANCE PERIOD: All work shall be completed within a thirty (30) calendar day period, excluding holidays.
8.0. INSPECTION / ACCEPTANCE OF PROJECT COMPLETION: Upon completion, the government will conduct an inspection of all items and attachments installed. Contact the quality assurance evaluator two (2) days prior to completion for an inspection.
9.0 SITE VISIT: A site visit is schedule for THURSDAY, 6 Sep 2012 @ 2:00 PM. The site visit is encouraged but not mandatory. If you are interested in attending, please email Mike Petty at michael.petty.5@us.af.mil for information on or before FRIDAY, 31 August 2012 @ 2:00 PM.
7.0. PERFORMANCE PERIOD: All work shall be completed within a thirty (30) calendar day period, excluding holidays.
File details come from the government source that posted it. Updated .