Q A.pdf
PDF 9 KB Posted
- Attached to
- Operable Partition Walls
- Solicitation number
- FA4484-12-T-0056
About this file
List of questions and answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work - Partition Walls.pdf | ||
| Solicitation - 24 Aug.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for Solicitation FA4484-12-T-0056 Operable Partition Walls
12 Sep 12
Q1: Should the bid include all required ceiling/soffit work for a complete installation?
A: Yes, the contractor will do the entire job, to include building soffits & ceiling restoration.
Q2: Both of the existing manual partitions are bi-stacking, should the new partitions stack all to one side or should they be bi-stacking consistent with the existing stack arrangement?
A: Walls can be either single or bi-stacking. If single stacking, customer prefers partitions stack on the wall away from the entrance doors.
Q3: Will there be one operating control system for each door
A: Yes, user requires each door to have its own operating system.
Q4: Will the white boards go across the entire length of the wall?
A: Yes, the white boards described in the SOW should be the along the entire length of the wall.
Q5: Does the contractor need to provide a dumpster?
A: If a dumpster is necessary, the contractor will need to provide one.