Responses_to_Questions_2.docx
DOCX document 15 KB Posted
- Attached to
- Repair/Sustain 19 MXG HVAC Multi Facilities
- Solicitation number
- FA4460-16-R-0004
About this file
Responses to Questions 2 (Final)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16-R-0004-0003_-_SV_Ans_and_Ext.pdf | ||
| Att_21_-_B-368_Interior_Pics.pdf | ||
| Asbestos_data_B364 368.pdf | ||
| B-0368.dwg | DWG drawing | |
| 00e1_Electrical_Design_Standards_for_LRAFB_March_2016.docx | DOCX document | |
| 00M1_LRAFB_Mechanical_Design_Criteria_(November_2015)doc.doc | DOC document | |
| 00A1LRAFB_Architectural_Design_Guide_Supplement.docx | DOCX document | |
| Asbestos_data_b-362_ _364.pdf | ||
| Responses_to_Questions_1.docx | DOCX document | |
| B-368.dwg | DWG drawing | |
| Asbestos_data_B380.pdf | ||
| -0002_Site_Visit_Q A.pdf | ||
| NKAK_10-1040_-_SV_Rstrs.pdf | ||
| FA4460-16-R-0004-0001.pdf | ||
| Att_6_Questionnaire.pdf | ||
| Att_3_Environmental_MOA.pdf | ||
| Att_10_Client_Authorization_Letter.pdf | ||
| Att_5_Mat_Sub_Schedule.pdf | ||
| Att_8_Financial_Institution_Reference_Sheet.pdf | ||
| Attachment_11_-_LRAFB_Information.pdf | ||
| Att_1_SOW.pdf | ||
| Att_2_Drawings.pdf | ||
| FA4460-16-R-0004_26_May_16.pdf | ||
| Att_7_EMIS_Instruction_Guide.pdf | ||
| Att_4_C D_Report.pdf | ||
| Att_9_Wage_Determination_AR160132.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RPR (SUS) 19 MXG HVAC, Multi Facilities BLDGs 362, 364, 368, 380 Questions 6-15-16 Bldg 362
1. In the Avionics Area the light fixtures are supported from the structure thru the lay in ceiling, not attached to, are these light fixtures to be replaced?
a. Yes, replacement is required.
2. In the Avionics Area there are multiple Buss ducts hanging below the ceiling, is there to be any work associated with these?
a. The Government is not requesting work be accomplished with these buss ducts, however the contractor may or may not find removal/re-installation may ease construction of the entirety of the scope defined in the SOW. The Government is indifferent so long as the final product does not damage the buss duct. If it works today, it has to work at the end of the project.
3. Is there to be any Fire Alarm work other than remove/reinstall ceiling devices as required for ceiling replacement?
a. New HVAC systems will require a new duct detector. Otherwise, no.
4. Is the existing Fire Alarm Panel adequate?
a. Per 19 CES alarm shop, yes.
5. Is a Fire Alarm Panel upgrade required?
a. No.
6. If a Fire Alarm Panel upgrade is required, will a complete building Fire Alarm System upgrade be required?
a. N/A
7. If a Fire Alarm Panel upgrade is required, will above ceiling heat detectors be required?
a. N/A
8. If a Fire Alarm Panel upgrade is required, is the existing Monaco Transmitter adequate?
a. N/A
9. Is Mass Notification required?
a. Project size does not invoke MNS requirements.
10. Are new light fixtures required to be LED?
a. Yes. Dimming capability required per applicable UFC’s.
11. Are Occupancy Sensors required for new lighting?
a. Yes Bldg 364
1. Is there to be any Fire Alarm work other than remove/reinstall ceiling devices as required for ceiling replacement?
a. New HVAC systems will require a new duct detector. Otherwise, no.
2. Is the existing Fire Alarm Panel adequate?
a. Per 19 CES alarm shop, yes.
3. Is a Fire Alarm Panel upgrade required?
a. No.
4. If a Fire Alarm Panel upgrade is required, will a complete building Fire Alarm System upgrade be required?
a. N/A
5. If a Fire Alarm Panel upgrade is required, will above ceiling heat detectors be required?
a. N/A
6. If a Fire Alarm Panel upgrade is required, is the existing Monaco Transmitter adequate?
a. N/A
7. Is Mass Notification required?
a. Project size does not invoke MNS requirements.
8. Are new light fixtures required to be LED?
a. Yes. Dimming capability required per applicable UFC’s.
9. Are Occupancy Sensors required for new lighting?
a. Yes Bldg 368
1. Is there to be any Fire Alarm work other than remove/reinstall ceiling devices as required for ceiling replacement?
a. New HVAC systems will require a new duct detector. Otherwise, no.
2. Is the existing Fire Alarm Panel adequate?
a. Per 19 CES alarm shop, yes.
3. Is a Fire Alarm Panel upgrade required?
a. No.
4. If a Fire Alarm Panel upgrade is required, will a complete building Fire Alarm System upgrade be required?
a. N/A
5. If a Fire Alarm Panel upgrade is required, will above ceiling heat detectors be required?
a. N/A
6. If a Fire Alarm Panel upgrade is required, is the existing Monaco Transmitter adequate?
a. N/A
7. Is Mass Notification required?
a. Project size does not invoke MNS requirements.
8. If the drywall ceilings are only partially removed/replaced for duct work, will new light fixtures be required?
a. Yes.
9. Are new light fixtures required to be LED?
a. Yes. Dimming controls required per applicable UFC’s.
10. Can the specialty (red beacons) light fixtures be removed/reinstalled?
a. The red beacon lights may be cleaned and re-installed.
11. Are Occupancy Sensors required for new lighting?
a. Yes.
Bldg 380
1. How many light fixtures are in the secure area?
a. 24
2. Are there any specialty type light fixtures in the secure area?
a. No
3. How many doors have Intrusion Detection and Access Control?
a. Unknown.
4. Will Advantor be contracted by the facility user?
a. No.
5. Is the existing Monaco Transmitter adequate for the new Fire Alarm/Mass Notification Systems?
a. Yes.
6. Are new light fixtures required to be LED?
a. Yes. Dimming controls required per applicable UFC’s.
7. Are Occupancy Sensors required for new lighting?
a. Yes