Att_6_Questionnaire.pdf

PDF 681 KB Posted

Attached to
Repair/Sustain 19 MXG HVAC Multi Facilities
Solicitation number
FA4460-16-R-0004
Issued by

About this file

Att 6 - Questionnaire

View the file

Other files

File Type Posted
16-R-0004-0003_-_SV_Ans_and_Ext.pdf PDF
Att_21_-_B-368_Interior_Pics.pdf PDF
Responses_to_Questions_2.docx DOCX document
Asbestos_data_B364 368.pdf PDF
B-0368.dwg DWG drawing
00e1_Electrical_Design_Standards_for_LRAFB_March_2016.docx DOCX document
00M1_LRAFB_Mechanical_Design_Criteria_(November_2015)doc.doc DOC document
00A1LRAFB_Architectural_Design_Guide_Supplement.docx DOCX document
Asbestos_data_b-362_ _364.pdf PDF
Responses_to_Questions_1.docx DOCX document
B-368.dwg DWG drawing
Asbestos_data_B380.pdf PDF
-0002_Site_Visit_Q A.pdf PDF
NKAK_10-1040_-_SV_Rstrs.pdf PDF
FA4460-16-R-0004-0001.pdf PDF
Att_3_Environmental_MOA.pdf PDF
Att_10_Client_Authorization_Letter.pdf PDF
Att_5_Mat_Sub_Schedule.pdf PDF
Att_8_Financial_Institution_Reference_Sheet.pdf PDF
Attachment_11_-_LRAFB_Information.pdf PDF
Att_1_SOW.pdf PDF
Att_2_Drawings.pdf PDF
FA4460-16-R-0004_26_May_16.pdf PDF
Att_7_EMIS_Instruction_Guide.pdf PDF
Att_4_C D_Report.pdf PDF
Att_9_Wage_Determination_AR160132.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Official Use Only When completed, this document is Source Selection Information IAW FAR 2.101 and 3.104.

Section L Attachment: Past Performance Questionnaire

For Official Use Only Page 1 of 7

The 19th Contracting Squadron of the Air Force Air Mobility Command is in the process of competitively selecting a source for a construction program. This requirement is for the Repair/Sustainment of 19 MXG HVAC, multiple facilities buildings 362, 364, 368, 380 at Little Rock Air Force Base, Arkansas. The Design-Build Firm is required to provide all services necessary for the design and construction of the project. The purpose of this project is to repair by replacement the HVAC systems in all four facilities and to upgrade the fire suppression system in building 380.

One of the considerations in proposal evaluation is the verification of the offerors' past performance on contracts or other work efforts which reflect the offeror's ability to perform on the proposed effort. We depend on information received from organizations such as yours, which have had first-hand experience with the offeror, for the evaluation of the offeror's performance on those contracts or work efforts.

Our areas of interest regarding the offeror are summarized in the enclosed questionnaire. In order to meet the acquisition milestones, we request your written response no later than 10 calendar days after your receipt of this letter. This schedule will allow us sufficient time to analyze the data prior to the start of negotiations.

To assist you in preparing your response and expediting your reply, the questionnaire may be filled out electronically and e-mailed to samuel.hevrin@us.af.mil, john.kenney.2@us.af.mil, and barry.jundt@us.af.mil or by hand and faxed to (501) 987-8119 (Attention: Barry G. Jundt). Please call Samuel Hevrin at (501) 987-3448 prior to fax transmission or if you have any questions. Your completed questionnaire will become a part of the official source selection records.

Your assistance is greatly appreciated and your prompt response will be one of the keys to the successful and timely completion of this Source Selection.

Signature Barry G. Jundt Contracting Officer

1 Atch Past Performance Questionnaire

ATTACHMENT 6 FA4460-16-R-0004

For Official Use Only Page 2 of 7

Section 1: Contract Identification

A. Contractor (Company/Division):

B. Contractor Cage Code:

C. Contract Number:

D. Contract Type (e.g., FFP, FPIF, CPIF, CPFF, etc.):

E. Program Title:

F. Brief Program Description:

G. Program Phase (e.g., Engineering & Manufacturing Development (EMD)):

H. Period of Performance

1. Original Schedule (assuming all options exercised):

Beginning Date _________ through ____________

2. Current Schedule (assuming all options exercised):

Beginning Date _________ through ____________

3. Reason for difference (if applicable):

I. Contract Dollar Value

1. Original maximum contract dollar value (assuming all options exercised): $

2. Current maximum contract dollar value (assuming all options exercised): $

3. Reasons for difference between original and current contract dollar value (if applicable):

J. Description of work performed:

K. Was this a competitively awarded contract? ☐ Yes ☐ No

L. Contractor’s Role: ☐ Prime Contractor ☐ Subcontractor ☐ Key Personnel

Note: If offeror holds or has held other contracts with your agency/organization in the last three (3) years, please complete separate Past Performance Questionnaire forms for those contracts as well.

Section 2: Customer or Agency Identification

A. Customer or agency name:

B. Customer or agency description (if applicable):

For Official Use Only Page 3 of 7

C. Geographic description of work performed under this contract (i.e., local, nationwide, worldwide, other Commands):

Section 3: Respondent Identification

A. Respondent’s name:

B. Respondent’s title:

C. Respondent’s phone/fax number/e-mail address:

D. Length of time (number of years/months) respondent worked on subject contract and description of responsibility/position/role:

E. Other suggested points of contact:

Section 4: Performance Information

In the table below, indicate your rating for the contractor’s performance by placing an “X” in the appropriate block to the right of each question. Provide supporting information for each response in the space provided. Attach additional pages if more space is needed. The performance rating scale is defined as follows:

Code Performance Rating

E EXCEPTIONAL – Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The contractual performance being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

V VERY GOOD – Performance meets contractual requirements and exceeds some requirements to the

Government’s benefit. The contractual performance being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY – Performance meets contractual requirements. The contractual performance being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL – Performance does not meet some contractual requirements. The contractual performance being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

For Official Use Only Page 4 of 7

N/A NOT APPLICABLE – Unable to provide a rating. Contract did not include performance for this aspect, performance was not observed, or information was not available. Do not know.

Note: The following are SAMPLE questions. Past Performance evaluation teams MUST construct a simple and concise Past Performance Questionnaire, tailored to seek out key information tied to the significant aspects of the planned acquisition. Avoid questions that can be answered with a “yes” or “no” but instead include probing and direct questions to draw out the required information desired.

The Contractor: E V S M U N/A

1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

SUPPORTING INFORMATION:

2. Demonstrated the ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.

3. Delegated authority to project managers and supervisors commensurate with contract requirements.

4. Home office participated in solving significant local problems.

5. Followed approved quality control plan.

6. Provided effective quality control and/or inspection procedures to meet contract requirements.

7. Corrected deficiencies in timely manner and pursuant to their quality control procedures.

For Official Use Only Page 5 of 7

8. Provided timely resolution of contract discrepancies.

9. Identified problems as they occurred.

10. Suggested alternative approaches to problems.

11. Displayed initiative to solve problems.

12. Developed realistic progress schedules.

13. Met established project schedules.

14. Provided timely resolution of warranty defects.

15. Was responsive to contract changes.

16. Provided adequate project supervision.

For Official Use Only Page 6 of 7

17. Obtained consent of surety for increases in bonding as work-in-progress increased.

18. Paid subcontractors/suppliers in a timely manner.

19. Provided accurate and complete line item cost proposals including all aspects of work required for each task.

20. Cooperated with Government personnel after award.

21. Met or exceeded small business and small disadvantaged business goals set forth in the approved subcontracting plan.

22. How would you rate the contractor's overall performance on this contract?

23. Was the contractor ever issued a cure or show cause notice under the referenced contract?

If yes, explain.

EXPLANATION:

☐ Yes

☐ No

24. Would you award another contract to this contractor? If not, explain.

EXPLANATION:

☐ Yes

☐ No

For Official Use Only Page 7 of 7

Additional remarks:

[click and pick the date]

Respondent’s Signature Date

Thank you for your prompt response and assistance!

Please return this completed questionnaire to:

Mailing Address:

[Insert here]

FAX to:

E-Mail to:

File details come from the government source that posted it. Updated .