16-R-0004-0003_-_SV_Ans_and_Ext.pdf
PDF 32 KB Posted
- Attached to
- Repair/Sustain 19 MXG HVAC Multi Facilities
- Solicitation number
- FA4460-16-R-0004
About this file
Amendment to extend proposal due date to Thursday 30 Jun 16 at 10 00am CST and to incorporate attachments to solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att_21_-_B-368_Interior_Pics.pdf | ||
| Responses_to_Questions_2.docx | DOCX document | |
| Asbestos_data_B364 368.pdf | ||
| B-0368.dwg | DWG drawing | |
| 00e1_Electrical_Design_Standards_for_LRAFB_March_2016.docx | DOCX document | |
| 00M1_LRAFB_Mechanical_Design_Criteria_(November_2015)doc.doc | DOC document | |
| 00A1LRAFB_Architectural_Design_Guide_Supplement.docx | DOCX document | |
| Asbestos_data_b-362_ _364.pdf | ||
| Responses_to_Questions_1.docx | DOCX document | |
| B-368.dwg | DWG drawing | |
| Asbestos_data_B380.pdf | ||
| -0002_Site_Visit_Q A.pdf | ||
| NKAK_10-1040_-_SV_Rstrs.pdf | ||
| FA4460-16-R-0004-0001.pdf | ||
| Att_6_Questionnaire.pdf | ||
| Att_3_Environmental_MOA.pdf | ||
| Att_10_Client_Authorization_Letter.pdf | ||
| Att_5_Mat_Sub_Schedule.pdf | ||
| Att_8_Financial_Institution_Reference_Sheet.pdf | ||
| Attachment_11_-_LRAFB_Information.pdf | ||
| Att_1_SOW.pdf | ||
| Att_2_Drawings.pdf | ||
| FA4460-16-R-0004_26_May_16.pdf | ||
| Att_7_EMIS_Instruction_Guide.pdf | ||
| Att_4_C D_Report.pdf | ||
| Att_9_Wage_Determination_AR160132.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2S3CZ6056A001-0001 NKAK 10-1040
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1.) The purpose of this amendment is to extend the proposal due date to 30 Jun 2016 at 10:00am CST. This additional time is necessary to allow offerors the necessary time to build proposals utilizing the questions and answ ers. This amendment w ill incorporate into the solicitation the follow ing posted to FBO on 22 Jun 2016: LRAFB Architectural Design Guide Supplement; Electrical Design Standards for LRAFB; Mechanical Design Criteria; Asbestos data B-362, B-364, B-368 and B-380; B-368 Draw ings and the Questions and Answ ers posted to FBO on 22 Jun 2016 and 23 Jun 2016. Additionally, this amendment w ill incorporate pictures of the interior of B-368 due to the facility being unavailable during the second site visit. See Summary of Changes for Details.
2.) All other terms and conditions of the solicitation remain unchanged.
3.) The POC for this amendment is SrA Samuel Hevrin w ho may be contacted by phone at 501-987-3448 or by email at samuel.hevrin@us.af.mil.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4460-16-R-0004
X 9B. DATED (SEE ITEM 11)
26-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jun-2016
CODE
19TH CONTRACTING SQUADRON - FA4460
642 THOMAS AVE
LITTLE ROCK AFB AR 72099
FA4460 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4460-16-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Jun-2016 10:00 AM to 30-Jun-2016 10:00 AM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
LIST OF ATTACHMENTS
DOCUMENT
TYPE DESCRIPTION PAGES DATE
Attachment 1 Statement of Work for NKAK 10-1040 147 29-Feb-16
Attachment 2 Drawings for NKAK 10-1040 36 N/A
Attachment 3 Memorandum of Agreement 3 31-Dec-98 between Little Rock Air Force Base (Little Rock AFB) and
Arkansas Department of Pollution Control and Ecology (ADPC&E) or its successors relating to the Compliance of contractors performing work at Little Rock AFB with Environmental Laws and Regulations and Addendum to the MOA dated (05/04/99)
Attachment 4 Contractor Construction and Demolition (C&D) Report 1 N/A
Attachment 5 Schedule of Material Submittals 1 N/A
Attachment 6 Past Performance Questionnaire with Cover Letter* 4 N/A
Attachment 7 EMIS Instructions Guide 3 N/A
Attachment 8 Finacial Institution Reference Sheet* 1 N/A
Attachment 9 Wage Determination AR160132 6 26-Feb-16
Attachment 10 Client Authorization Consent Form* 1 N/A
Attachment 11 LRAFB Information 2 N/A
Attachment 12 Site Visit Questions and Answers Part 1 (Posted to FBO on 22 Jun 2016) 3 22-Jun-16
FA4460-16-R-0004
Attachment 13 LRAFB Architectural Design Guide Supplement (Posted to FBO on 22 Jun 2016) 10 21-Jul-15
Attachment 14 Electrical Design Standards for LRAFB (Posted to FBO on 22 Jun 2016) 10 15-Mar-16
Attachment 15 LRAFB Mechanical Design Criteria (Posted to FBO on 22 Jun 2016) 13 1-Nov-15
Attachment 16 Asbestos Data B-362 and B-364 (Posted to FBO on 22 Jun 2016) 1 N/A
Attachment 17 Asbestos Data B-364 and B-368 (Posted to FBO on 22 Jun 2016) 1 N/A
Attachment 18 Asbestos Data B-380 (Posted to FBO on 22 Jun 2016 1 N/A
Attachment 19 Drawings B-368 (Posted to FBO on 22 Jun 2016) 2 N/A
Attachment 20 Site Visit Questions and Answers Part 2 (Posted to FBO on 23 Jun 2016)
3 23-Jun-16
Attachment 21 B-368 Interior Pictures 36 23-Jun-16
NOTE: Documents marked with an asterisk (*) will not be included in any resultant award.
The following have been deleted:
LIST OF ATTACHMENTS
(End of Summary of Changes)
File details come from the government source that posted it. Updated .