FA4452-14-R-0002_Amendment_0002_to_RFP_15_May_14.doc

DOC document 155 KB Posted

Attached to
GDSS Application Support Federal contract opportunity
Solicitation number
FA4452-14-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

FA4452-14-R-0002 Amendment 0002 to RFP

View the file

Other files for this federal contract opportunity

Other files attached to GDSS Application Support, newest first.
File Type Posted
21_May_14_Solicitation_Q As.docx DOCX document
15_May_14_Solicitation_Q As.docx DOCX document
J-1_CDRLs_Amendment_0002.pdf PDF
J-5_DD254_Amendment_0002.doc DOC document
J-2_PWS_2014_05_14_Amend_0002.docx DOCX document
Amendment_0002_Conformed_Copy.doc DOC document
8_May_14_Solicitation_Q As.docx DOCX document
J-13_Cost-Price_Model_Ament_0001(07_May).xls XLS spreadsheet
FA4452-14-R-0002_Amendment_0001_to_RFP_7_May_14.doc DOC document
J-11_Amend_0001_Workload_Estimates_2014_05_07.docx DOCX document
J-2_PWS_2014_05_07_Amend_0001.docx DOCX document
25_Apr_14_Solicitation_Q As.docx DOCX document
J-2_PWS_2014_04_22.docx DOCX document
J-4_SchdGFP_2013-10-31.pdf PDF
FA4452-14-R-0002_FINAL_RFP_2014_04_22.doc DOC document
J-5_DD254_19Apr14.doc DOC document
J-13_Cost-Price_Model.xls XLS spreadsheet
J-11_and_12.pdf PDF
J-3_GDSS_QASP_2014_04_22.pdf PDF
J-10_PP_Letter.pdf PDF
J-6_thru_9.docx DOCX document
J-1_CDRLs.pdf PDF
Draft_RFP_2014_03_18.doc DOC document
J-5_DD254_2013_Sep_13.doc DOC document
J-3_GDSS_QASP_2014_03_17.docx DOCX document
J-4_SchdGFP_2013-10-31.pdf PDF
J-6_thru_12.docx DOCX document
J-1_PWS_2014_03_12.docx DOCX document
DRAFT_PWS_2013_Nov_19.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

SECTION L

Instructions, Conditions, and Notices to Offerors or Respondents

L-I ‑ INFORMATION TO OFFERORS (ITO) and INSTRUCTIONS FOR PROPOSAL PREPARATION

1.0 General Instructions

(a) The offeror's proposal must include all data and information requested by this ITO and must be submitted in accordance with these instructions. The offer shall be compliant with the requirements as stated in the Performance Work Statement (PWS), Contract Data Requirements List (CDRL), and Request For Proposal (RFP). Non-conformance with the instructions provided in this ITO may result in an unfavorable proposal evaluation.

(b) The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the offeror's proposal.

(c) Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.

(d) The proposal acceptance period is specified in Section A of the solicitation. The offeror shall make a clear statement in Section A of the proposal documentation volume that the proposal is valid through 1 Jan 15 or date of award, whichever is later.

(e) In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.

1.1 General Information

1.1.1. Point of Contact

The Contracting Officer (CO) and Contract Specialists (CS) are the sole points of contact for this acquisition. Address any questions or concerns you may have to the CO and CSs. Written requests for clarification may be sent to the CO and CSs. CSs are Christie Berry at 618-256-9972 / christiana.berry.2@us.af.mil or Jessie Logsdon at 618-256-9961 / jessica.logsdon@us.af.mil. CO is Lisa Gross at 618-256-9965 / lisa.gross@us.af.mil. Written inquiries will be answered in writing and provided to all offerors via FBO. However, time may not permit requests to be answered if received by the above addressees within 10 calendar days of the due date for offers specified in the solicitation.

1.1.2. Debriefings

The CO and CSs will promptly notify offerors of any decision to exclude them from the competitive range; whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a preaward debriefing or they may choose to wait until after the source selection decision to request a postaward debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The CO will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.

1.1.3. Discrepancies

If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the CO and CSs in writing with supporting rationale as well as the remedies the offeror is asking the CO and CSs to consider as related to the omission or error. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion. This reservation includes matters of additional or substitute pages of the initial proposal.

1.1.4. Electronic Reference Documents

All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) website at http://www.fedbizopps.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

1.1.5 Communications

Exchanges of source selection information between Government and offerors will be controlled by the CO and CSs. Email may be used to transmit such information to offerors only if the email can be sent and received encrypted and includes “Source Selection Information – See FAR 2.101 & 3.104” in the Subject line. Otherwise, source selection information will be transmitted via mail i.e., USPS, FedEx, or UPS.

1.1.6 Amendments to Solicitation

If this Request for Proposal (RFP) is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this request by the day and time specified in the amendment(s).

1.1.7 Use of Non-Government Personnel in Source Selection

(a) It is the Government’s intent to utilize non-Government advisors in the conduct of this source selection. Offerors are advised that data, including proprietary data, submitted to the Government in response to this solicitation will be released to non-Government advisors for review and analysis.

(b) The Non-Government advisors whom will be involved in this source selection and the manner in which they will be involved are as follows:

MITRE Corporation: Employees of this firm will serve as non-voting advisors to the Source Selection Evaluation Board (SSEB). These advisors may be required to provide advice regarding proposal strengths and weaknesses but will not determine ratings or rankings of offerors’ proposals. Non-Government advisors will be prohibited from reviewing Past Performance information. All participants have signed nondisclosure agreements.

(c) Submission of offeror’s proposal in response to this request for proposal will constitute acceptance of non-Governmental personnel participation as advisors in the source selection. If the offeror has any objection to Non-Government advisors access to its proposal information, the offeror shall provide grounds and justification for its objections to the CO no later than 10 calendar days before proposals are due. The CO will then make a determination whether the non-Government advisor(s) shall be permitted to participate in the source selection. The CO will inform objecting offeror of the final determination, and, if the use of non-Government advisors has been changed, will inform all offerors of the change.

1.2 Organization/Number of Copies/Page Limits

The offeror shall prepare the proposal as set forth in the Proposal Organization Table (Table 1.2 below). The titles and contents of the volumes shall be as defined in this table, all of which shall be within the required page limits and with the number of copies as specified in Table 1.2. The attachments identified in the table shall be separately bound in three-ring, loose-leaf binders, as necessary. The contents of each proposal volume are described in the ITO paragraph as noted in the table below:

Table 1.2 - Proposal Organization

VOLUME
ITO Paragraph

Number

VOLUME TITLE
TOTAL

PROPOSALS

PAGE LIMIT

I
2.0
Executive Summary
5
5
II
3.0
Technical/Technical Risk
5
90**
III
4.0
Past Performance
4
*
IV
5.0
Cost/Price
4
None
V
6.0
Contract Documentation
4
None

*Limit past performance volume to 4 pages per contract reference submitted and no more than 3 contracts for prime and 2 contracts for each significant subcontractor. Each task order reference submitted will count toward the 3 contracts limit for the prime and 2 contracts limit for each significant subcontractor. Complete a Past Performance Information Sheet (PPIS) located at Section J, Attachment 6 for each contract submitted.

** The Management Plan - CDRL A001 will not be included in the 90 page count for Volume II Technical/Technical Risk.

1.2.1 Page Limitations

Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal and excess paper copies will be returned to the offeror as soon as practicable. Page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors. Each page shall be counted except the following:

Cover pages, tables of contents, tabs, glossaries, and resumes.

1.2.1.1. Page Size and Format

(a) A page is defined as each face of a sheet of paper containing information. When both sides of a sheet display printed material, it shall be counted as two pages. Page size shall be 8.5 x 11 inches, not including foldouts. Pages shall be typed with 1.5 line spacing. Except for the reproduced sections of the solicitation document, the text size shall be no less than 12 point. Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software. Use at least 1 inch margins on the top and bottom and 1 inch side margins. Pages shall be numbered sequentially by volume. These page size and format restrictions shall apply to responses to ENs.

(b) Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 by 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics not for pages of text.

1.2.2 Cost or Pricing Related Data

All cost or pricing information shall be addressed ONLY in the proposal and contract volume identified in this section. Cost trade off information, work hour estimates, and material kinds and quantities may be used in other volumes only as appropriate for presenting rationale for alternatives or design and trade off decisions. Pricing information shall be addressed in Volume V, Contract Documentation, in Section B of the Schedule of the RFP. Contract Line Item Numbers (CLINs) shall be priced. However, supporting documentation for prices shall be included in Volume IV, Cost/Price. Include supporting data to substantiate the reasonableness of the proposed CLIN prices. At a minimum, supporting data for FFP CLIN shall include: allocation of personnel by labor category, hours, and fully burdened hourly rates. At a minimum, supporting data for CPFF CLIN shall include: allocation of personnel by labor category, hours, and fully burdened hourly rates with exception of profit (fee). All significant assumptions, scope limitations, and/or qualifications of the proposal shall be addressed and explained. Your cost/price proposal shall include the three month transition period (if applicable), six month base period, and four twelve-month option periods.

1.2.3 Cross-Referencing

To the greatest extent possible, each volume shall be written on a standalone basis so that its contents may be evaluated with a minimum of cross referencing to other volumes of the proposal. Information required for proposal evaluation which is not found in its designated volume will be assumed to have been omitted from the proposal. Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity. However, offerors shall provide a Solicitation Cross Reference Matrix indicating by ITO, PWS, and specification paragraph number, the corresponding proposal paragraph in that section which addresses the referenced item.

1.2.4 Indexing

Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections and will not count against page limitations.

1.2.5 Glossary of Abbreviations and Acronyms

Each volume shall contain a glossary of all abbreviations and acronyms used, and with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.

1.2.6 Tables and Figures

Include an indexed list of Tables and Figures. This index will not count against page limitations.

1.2.7 Binding and Labeling

Each volume of the proposal should be separately bound in a three-ring, loose leaf binder permitting the volume to lie flat when open. Staples shall not be used. A cover sheet should be bound in each book, clearly marked as to volume number, title, copy number, solicitation identification, and the offeror's name. The same identifying data should be placed on the spine of each binder. Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on disclosure and use of data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.

1.3 Offers

Total proposals include one original and number of copies specified in table 1.2 plus electronic submission (via email). Each offeror is required to submit an identical electronic copy of their proposal on a CD with their hard copy submission, no later than the required proposal due date. The CD shall be in addition to the required number of hard copies designated in Table 1.2 above. The content and page size of electronic copies must be identical to the hard copies. For electronic copies, indicate on each CD the volume number and title. Use separate files to permit rapid location of all portions, including subfactors, exhibits, annexes, and attachments, if any. The offeror shall submit all volumes in electronic format, using recordable CDs. Each volume shall be in a different directory on a CD. The electronic copies of the proposal shall be submitted in a format readable by Microsoft (MS) Office 2007 suite of applications. In the event that hard copies and electronic copies of a proposal are submitted and there are discrepancies between the hard copies and the electronic copies of the proposal, the electronic copies take precedence over hard copies.

1.4 Proposal Submission Requirements

Offers are to be submitted by the due date specified in the RFP (Block 9 of the SF33). Offerors are to submit one electronic copy of their proposal via email to Christie Berry at christiana.berry.2@us.af.mil and Jessie Logsdon at jessica.logsdon@us.af.mil and all hard copies (including CDs) should be mailed or hand carried to the following address:

763 SCONS

Attn.: Solicitation FA4552-14-R-0002

Attn.: Lisa Gross / Christie Berry / Jessica Logsdon 507 Symington Drive, Room W202

Scott AFB IL 62225-5022

Both email proposals and hard copy proposals (including CDs) must be received by the proposal due date.

Hard copy submissions shall identify the "original" proposal.

Access to Scott AFB for Delivery of Hand Carried Proposals: Offerors are cautioned that when hand-carrying proposals individuals not affiliated with this installation must obtain visitors’ passes prior to entrance. The Shiloh gate has been designated as the “Visitor’s Control Center”. Some delays can be anticipated for visitors to process through the “Visitor’s Control Center” and offerors should allow sufficient time to obtain visitors’ passes. Each visitor must have an onsite sponsor to obtain a visitor’s pass, please contact either Christie Berry at 618-256-9972 / christiana.berry.2@us.af.mil or Jessie Logsdon at 618-256-9961 / jessica.logsdon@us.af.mil for more information. Late proposals will be processed in accordance with the procedures identified in FAR 52.215-1(c) Submission, Modification, Revision, and Withdrawal of Proposals.`

2.0 Volume I ‑ Executive Summary

In the executive summary volume, the offeror shall provide the following information:

2.1 Narrative Summary

The narrative summary of the entire proposal should be concise, to include addressing the significant risks, and highlighting any key or unique features, excluding cost/price. The salient features should tie in with Section M evaluation factors/subfactors. Any summary material presented here shall not be considered as meeting the requirements for any portions of other volumes of the proposal.

2.2 Table of Contents

Include a master table of contents of the entire proposal.

3.0 Volume II - Technical Volume

3.1 General

The Technical Volume should be specific and complete. Legibility, clarity, and coherence are very important. Your responses will be evaluated against the Technical subfactors defined in Section M, Evaluation Factors for Award. Using the instructions provided below, provide as specifically as possible the actual methodology you would use for accomplishing/satisfying these subfactors. All the requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. It is not necessary or desirable for you to tell us so in your proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.

3.2 Format and Specific Content

3.2.1 Technical

In the technical volume, address your technical solution for meeting or exceeding the Government’s minimum performance or capability requirements of each technical subfactor as stated in Section M.

3.2.1.1 Technical Risk

Address Technical Risk associated with those aspects of your proposed technical solution (for each subfactor) you consider to have the potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. Classify each risk in accordance with DoD Source Selection Procedures Table 3, Technical Risk Rating. Provide the rationale for each risk and its rating, including quantitative estimates of the impact on cost, schedule, and performance. Describe the impact of each identified risk in terms of its potential to interfere with or prevent the successful accomplishment of other contract requirements, whether or not those requirements are identified as subfactors. Propose a realistic "work‑around" or risk mitigators for identified risks that will eliminate or reduce risk to an acceptable level. Identify and classify any new risks introduced by such risk mitigation.

3.2.2 Volume Organization

The Technical volume shall be organized according to the following general outline:

(1) Table of Contents

(2) List of Table and Figures

(3) Glossary of Abbreviations and Acronyms

(4) Cross Reference Matrix

(5) Technical Approach (Subfactor One)

(6) Staffing Approach (Subfactor Two)

(7) Risk Matrix

3.2.3 Subfactor One – Technical Approach

Each offeror shall provide a detailed and complete technical approach demonstrating their capabilities, knowledge, and expertise. The technical plan shall represent the offeror’s approach to meeting overall PWS requirements. Identify any best practices/innovations proposed. Requirements for Subfactor 1 – Technical Approach are described in Section M, provision M002b(1), Subfactor 1: Technical Approach.

3.2.4 Subfactor Two – Staffing Approach

Each offeror shall provide a detailed and effective staffing plan. The staffing plan should represent the offeror’s approach to perform PWS tasks by identifying necessary personnel resources. A subcontractor management plan shall be included in the offeror’s staffing approach. Additional requirements for Subfactor 2 – Staffing Approach are described in Section M, provision M002b(1), Subfactor 2: Staffing Approach.

Section M describes the measures of merit for each Technical subfactor.

4.0 Volume III - Past Performance

4.1 General

Each offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in Section J, Attachment 6. This information is required on the offeror and significant subcontractors, teaming partners, and/or joint venture partners who are proposed to perform aspects of the effort the offeror considers critical to overall successful performance. Offerors are cautioned that the Government will use data provided by each offeror in this volume and data obtained from other sources in the evaluation of past performance.

Along with the information required in this paragraph, the offeror shall submit a consent letter (Section J, Attachment 7) executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a client authorization letter (Section J, Attachment 8), authorizing release to the Government of requested information on the offeror's performance.

4.2 Past Performance Information

Each offeror shall submit the information shown in Section J, Attachment 6, for each relevant contract with their proposal.

As soon as practicable, offerors shall complete Section 1 of the attached Past Performance Questionnaire (PPQ) (Section J, Attachment 9) and email it and the Past Performance Questionnaire Cover Letter (Section J, Attachment 10) to points of contact (POCs) the offeror has listed in the PPIS (Section J, Attachment 6). The POCs listed in the PPIS’s should represent the individuals most knowledgeable about the offeror’s performance on the identified contract or program, such as the following: (1) Contracting Officer’s Representative; (2) Program/Project Manager; (3) Contracting Officer. The POCs will complete the questionnaires and forward them by email directly to both Contract Specialists, Christie Berry at christiana.berry.2@us.af.mil and Jessie Logsdon at jessica.logsdon@us.af.mil. RESPONDENTS TO THE QUESTIONNAIRES SHALL NOT SEND THE COMPLETED INFORMATION SHEETS BACK TO THE OFFEROR. The Source Selection Evaluation Board (SSEB) will conduct follow-up with any POC as necessary. PPQs should be received by the Contract Specialists via email NLT the date set for receipt of proposals.

4.3 Relevant Contracts

Submit information in accordance with Section J, Attachment 6, on no more than 3 recent contracts that you consider most relevant in demonstrating your ability to perform the proposed effort. Also include information on no more than 2 recent contracts performed by each of your significant subcontractors that you consider most relevant in demonstrating their ability to perform the proposed effort. Task orders submitted will count toward the 3 contracts limit for the prime offeror and 2 contracts limit for each significant subcontractor. Include rationale supporting your assertion of relevance. For a description of the characteristics or aspects the Government will consider in determining recency and relevance, see Section M, provision M002 - Evaluation Factors, paragraph M002c - Past Performance Factor. Each PPIS shall not exceed 4 pages. Any additional information or contracts over the maximums (3 contracts limit for the prime offeror and 2 contracts limit for each significant subcontractor) will not be considered for evaluation. Page limitations will also be followed in accordance with paragraph 1.2 above.

4.3.1 Specific Content

Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a limited or no confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a higher confidence candidate. For example, submittal of quality performance indicators or other management indicators that clearly support that an offeror has overcome past problems is required. Categorize the relevant information into the specific Technical subfactors and Cost/Price factor used to evaluate the proposal.

4.3.2 Organizational Structure Change History

Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.

5.0 Volume IV - Cost/Price

5.1 General Instructions

5.1.1 Cost/Price Reasonableness and Realism

This section is to assist you in submitting data other than certified cost or pricing data that is required to evaluate the reasonableness of your proposed cost/price. Compliance with these requirements is mandatory and failure to comply may result in rejection of your proposal. In the event that price analysis techniques at FAR 15.404 are insufficient to establish a fair and reasonable price determination, other proposal analysis techniques may be used. Specifically, the Government reserves the right to evaluate the realism of each offeror’s proposed costs. This will include an evaluation of the extent to which proposed costs are sufficient for the work to be performed, reflective of a clear understanding of the requirements, and consistent with the unique methods of performance and materials described in the offeror’s technical proposal (FAR 15.404-1(d)(1) and 2.101). Note that unrealistically low or high proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does not understand the requirement or has submitted an unrealistic proposal. When the Government evaluates an offer as unrealistically low compared to the anticipated costs of performance and offeror fails to explain these underestimated costs, the Government will consider, under the Technical risk rating, the offerors lack of understanding of the technical requirements of the applicable Technical subfactor. Additionally, unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject an offeror’s proposal. Offers should be sufficiently detailed to demonstrate their reasonableness and realism. The burden of proof for credibility of proposed costs/prices rests with the offeror.

5.1.2 Cost/Price Data

Data beyond that required by this instruction shall not be submitted, unless you consider it essential to document or support your cost/price position. All data relating to the proposed price, including all required supporting documentation, must be included in the section of the proposal designated as the Cost/Price Volume. Under no circumstances shall this data and documentation be included elsewhere in the proposal.

5.1.3 Cost or Pricing Data Requirements

In accordance with FAR 15.403-1(b) and 15.403-3(a), data other than certified cost or pricing data will be required to support a determination of price reasonableness. Info shall be provided IAW FAR 15.403-5. If, after receipt of proposals, the CO determines that there is insufficient data available to determine price reasonableness and none of the exceptions in FAR 15.403-1 apply, the offeror shall be required to submit additional data other than certified cost or pricing data.

5.1.4 Rounding

All fully burdened labor rates shall be rounded to the nearest penny.

5.2 Volume Organization

The Cost/Price Volume shall consist of the following sections:

SECTION 1 – Table of Contents; summary descriptions of estimating, purchasing, accounting systems, and Cost Accounting Standards (CAS) Disclosure Statement; changes to estimating, purchasing, accounting practices, and/or CAS Disclosure Statement.

SECTION 2 – Data other than certified cost or pricing data, to include estimating methodology. Ensure the cost/price proposal includes detailed cost/price amounts of all resources required to accomplish the task, (i.e. labor categories, labor hours, number of employees for each labor category, rates, travel, incidental equipment, etc.). These hourly requirements are to include (but separately identify) subcontractor(s) and inter-divisional transfer(s) hours. Labor and overhead rates should include sufficient detail to sustain a DCAA audit (e.g. Direct Labor Rates, Overhead, Fringe Benefits, G&A, and Fee, etc.). Offerors are to include copies of DCMA/DCAA approved indirect and direct rates and recent DCMA/DCAA reports, as applicable. The estimated hours provided in Section J, Attachment 11 are provided as a general guide to the scope of the effort required. Offerors are cautioned to propose the most efficient organization consisting of the optimum utilization of management, labor categories, labor hours, and costs per task that realistically portray the support required to provide the services described in the PWS to the level described in the services summary. Your proposal shall include travel estimated IAW Section J, Attachment 12, and identified as not-to-exceed (NTE) Government estimated travel. Your proposal shall also include estimated ODCs IAW Section J, Attachment 12, and identified as NTE Government estimated ODCs. All contractor proposed Material Handling Fees (MHF) for ODC expenses shall be clearly provided as a percentage in this section of your cost/price proposal. Cost/price evaluations will take into consideration the proposed MHF. If you propose a MHF, charges for MHF shall not be included in the fully burdened labor rates required above. Any additional Travel or ODCs you deem necessary may be provided separately and identified as contractor proposed travel and ODCs. All additional travel must show the specific detail, if known (i.e. Number of days, locations, number of personnel, etc.). All ODCs shall annotate the specific detail (qty, part number, manufacturer, etc.) to include supporting documentation to justify the cost (i.e. vendor quotes, price history, etc.) If a subcontractor relationship exists, the subcontractor must break out their costs, in accordance with the above requirements. If needed, the subcontractor may submit their unsanitized cost breakout and supporting information directly to the CO. If applicable, travel shall be authorized by the Contracting Officer’s Representative (COR), in writing, prior to performance and will be paid IAW FAR 31.205-46. The contractor will be authorized to invoice monthly for all approved travel costs incurred and approved by the COR. Your cost/price proposal shall include the three month transition period (if required), six month base period, and four twelve month option periods.

SECTION 3 – Provide your firm's rationale for how the cost/price data presented in Section 2 reflects the complexity and magnitude of the services to be provided for each task. Also explain how your subcontracting team addresses the complexity of the magnitude of the services to be provided. Provide a discussion of the financial and human resource risks involved in being able to provide satisfactory level resources needed considering the op tempo (often resulting in unpredictable schedule changes) and complexity of the services being provided; and how your firm's resource planning reflected in the labor breakout and cost/price proposal addresses those risks.

6.0 Volume V ‑ Contract Documentation

6.1 RFP/Representations and Certifications

The purpose of this volume is to provide information to the Government for preparing the contract document and supporting file. The offeror's proposal shall include a signed copy of the RFP, and Sections A through K.

6.1.1 Section A - Solicitation/Contract Form

Completion of blocks 12, 13, 14, 15a, 15b, 16 (15c if applicable) and signature and date for blocks 17 and 18 of the SF33. Signature by the offeror on the SF33 constitutes an offer, which the Government may accept. The "original" copy should be clearly marked under separate cover and should be provided without any punched holes.

6.1.2 Section B - Supplies or Services and Costs/Prices

Completed pricing information in Section B of the RFP. The offeror shall insert its proposed price for each CLIN in the spaces provided. Cost/price shall reflect all costs/prices associated with providing GDSS tasks. Total AMOUNT prices shall be divisible by the unit quantity.

6.1.3 Section J - List of Attachments

Each offeror is required to complete sections 6a, 6b, 6c, 7a, 7b, and 7c of the DD Form 254 found at Section J, Attachment 5. The DD254 shall be submitted in Volume V, Contract Documentation.

6.1.4 Section K - Representations, Certifications, and other Statements of Offerors

Completed representations, certifications, acknowledgments and statements. These shall be submitted as a separate attachment to the Contract Documentation Volume. In addition, compliance with the clause at DFARS 252.209-7999, Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law, is mandatory. Complete the appropriate fill-in portions of subparagraphs (b)(1) and (b)(2).

6.1.5 Exceptions to Solicitation Requirements

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. This information shall be provided in the format and content of Table 6.1.5.

Table 6.1.5 - Solicitation Exceptions

Solicitation Document Page/ Paragraph Requirement/ Portion Rationale

PWS,CDRL, RFP, ITO, etc.
Applicable

Page and Paragraph

Numbers

Identify the requirement or portion to which exception is taken
Describe

why the requirement can/will not be met

6.2 Other Information Required

6.2.1 Authorized Offeror Personnel

Provide the name, title, and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.

6.2.2 Government Offices

Provide the mailing address, telephone and fax numbers and facility codes for the cognizant Contract Administration Office, DCAA, and Government Paying Office. Also, provide the name, email, telephone and fax number for the Administrative Contracting Officer (ACO).

6.2.3 Company/Division Address, Identifying Codes, and Applicable Designations

Provide company/division's street address, county and facility code; CAGE code; DUNS code; TIN; size of business (large or small); and labor surplus area designation. This same information must be provided if the work for this contract will be performed at any other location(s). List all locations where work is to be performed and indicate whether such facility is a division, affiliate, or subcontractor, and the percentage of work to be performed at each location.

6.2.4 Attachments to the RFP

The offeror shall provide the following as attachments to the solicitation:

6.2.4.1 Subcontracting Plan - Participation of Small Businesses (SB), Historically Black Colleges and Universities, or Minority Institutions (HBCU/MI) If the offeror is other than a small business, the offeror shall submit a Small Business Subcontracting Plan in accordance with FAR 52.219-8, Utilization of Small Business Concerns; FAR 52.219-9 Alternate II, Small Business Subcontracting Plan; and DFARS 252.219-7003, Small Business Subcontracting Plan (DoD Contracts) that also identifies and specifies the extent of offeror's commitment to the participation of small businesses (SB), historically black colleges or universities (HBCU) and minority institutions (MI), whether as joint venture members, teaming arrangement partners, or subcontractors. If applicable, submit a copy of your approved Master Plan. In the event the offeror has negotiated a comprehensive subcontracting plan pursuant to DFARS 219.702, the offeror must submit the information that identifies and specifies the extent of its commitment to the participation of SB, HBCU and MI. The plan must demonstrate an overall goal of at least 30% of the total contract value committed towards small businesses. However, the distribution of planned dollars allotted to individual types of small businesses (i.e. VOSB, SDVOSB, WOSB, HUBZone, etc.) is at the offeror’s discretion. Ensure the subcontracting plan includes all requirements under FAR 19.704, DFARS 219.704, and AFFARS 5319.704, to include positive percentage goals for each small business subcategory. If a category does not contain a positive goal, provide reasoning as to why one cannot be reached and what steps may be taken in the future to provide a positive goal. This subcontracting plan will be evaluated on a pass/fail basis when determining the awardee and/or the competitive range (if discussions are held). Failure to submit such a plan will render the offeror ineligible for further consideration in this source selection. If an offeror’s small business subcontracting plan does not meet the aforementioned requirements, the offeror’s proposal may be disqualified from further consideration.

6.2.4.2 Earned Value Management System (EVMS) plan

The offeror shall submit evidence that the offeror’s EVMS plan is compliant with the guidelines in the American National Standards Institute/Electronic Industries Alliance Standard 748, Earned Value Management Systems (ANSI/EIA-748). The contractor shall maintain compliance with the provision at DFARS 252.234-7001, Notice of Earned Value Management System and the clause at DFARS 252.234-7002, Earned Value Management System. In the event an offeror does not comply with the terms and conditions of the aforementioned provision and clause, the offeror will be found not in compliance with solicitation terms and conditions, rated technically unacceptable and may be removed from the competition.

6.2.4.3 GFE and/or Base Support Requirements

The Government plans to provide the items listed in Section J, Attachment 4 of the solicitation as GFE. If the offeror requires the use of Government furnished items other than those specified, the offeror shall provide a listing including quantity, federal stock number, nomenclature, date needed and duration of availability, rental value per FAR 45.1 and 45.2, reason for need, and cross reference to cost/price volume paragraphs which pertain to GFE and/or base support. The offeror shall also provide the written authorization from the cognizant CO, as applicable. The offeror shall supply this information in the format shown in Table 6.2.4.3. If the offeror requires the use of Government furnished items other than those specified, the offeror shall provide their totals per period within the RFP, Section B, CLINs X006, Task 8 Hardware/ODCs in addition to the Government provided amount. At the time of award, if the contractor does not require the use of Government furnished items other than those specified in Section J, Attachment 4, the language for this will be removed from CLINs X006 in the resultant contract.

Table 6.2.4.3 - Required Information for Using GFP/Base Support (EXAMPLE)

Quantity
Federal

Stock #

Nomen-clature
Duration

of Need Rental

Value Reason for Need Cross Ref. to Cost Prop

2 EA
FS156-09-234
ACG-1372 Time Counter
1 Oct 03 - 30 Dec 04
$1,000
Needed to calibrate our 5 MHz/1pps SATCOM simulator offset
Volume IV, pages 23 – 27, paragraphs A-C

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

EVALUATION FACTORS FOR AWARD

SECTION M

Evaluation Factors for Award

M001 SOURCE SELECTION

a. Basis for Contract Award

This is a best value source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil. The Government will select the best overall offer, based upon an integrated assessment of Technical/Technical Risk, Past Performance, and Cost/Price. Small Business Participation will be evaluated on a pass/fail basis but not part of the integrated assessment. A contract may be awarded to the offeror who is deemed responsible in accordance with the FAR, as supplemented, whose proposal conforms to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and is judged, based on the evaluation factors and subfactors to represent the best value to the Government. The Government seeks to award to the offeror who gives the Air Force the greatest confidence that it will best meet, or exceed, the requirements. This may result in an award to a higher rated, higher priced offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the technical and/or overall business approach and/or past performance of the higher price offeror outweighs the cost difference. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below). While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective; and therefore, professional judgment is implicit throughout the entire process.

b. Number of Contracts to be Awarded

The Government intends to award one contract for the GDSS Program. However, the Government reserves the right to make no award at all.

c. Rejection of Unrealistic Offers

The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, contract terms and conditions, or unrealistically high or low in cost when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.

d. Competitive Advantage from Use of GFE The Government will eliminate any competitive advantage resulting from an offeror's proposed use of Government-furnished equipment (GFE).

M002 EVALUATION FACTORS

a. Evaluation Factors and Subfactors

(1) The following evaluation factors and subfactors will be used to evaluate each proposal: Award will be made to the offeror proposing the combination most advantageous to the Government based upon an integrated assessment of the evaluation factors and subfactors described below.

Factor 1: Technical/Technical Risk

Subfactor 1: Technical Approach

Subfactor 2: Staffing Approach

Factor 2: Past Performance

Factor 3: Cost/Price

(2) Relative Importance of Factors and Subfactors. The relative importance of each factor and subfactor is as follows: Technical/Technical Risk and Past Performance are of equal importance. Within the Technical Factor, the subfactors are of equal importance. In accordance with FAR 15.304(e), all evaluation factors other than Cost/Price, when combined, are approximately equal to Cost/Price.

(3) Small Business Participation: If other than a small business, the offeror is required to submit a small business subcontracting plan in accordance with FAR 52.219-8, Utilization of Small Business Concerns; FAR 52.219-9 Alternate II, Small Business Subcontracting Plan; and DFARS 252.219-7003, Small Business Subcontracting Plan (DoD Contracts). The plan must demonstrate an overall goal of at least 30% of the total contract value committed towards small businesses. This plan will be evaluated on a pass/fail basis when determining the awardee and/or the competitive range (if discussions are held). Refer to requirement in Section L, paragraph 6.2.4.1 for inclusion of subcontracting plan. Failure to submit such a plan will render the offeror ineligible for further consideration in this source selection. If an offeror’s small business subcontracting plan does not meet the aforementioned requirements, the offeror’s proposal may be disqualified from further consideration.

b. Technical Factor

The Technical evaluation provides for two distinct but related assessments: the Technical Rating and the Technical Risk Rating. These two ratings have equal impact for the rating of each Technical subfactor.

(1) Technical Rating. The technical rating provides an assessment of the quality of the offeror’s solution for meeting the Government’s requirement. Each Technical subfactor will receive one of the color ratings described in DoD Source Selection Procedures, Table 2 – Technical Ratings, excerpted below. They focus on the strengths and deficiencies of the offeror's proposal. The color rating depicts how well the offeror’s proposal meets the Technical subfactor requirements. Subfactor ratings shall not be rolled up into an overall color rating for the Technical factor.

TABLE 2 - TECHNICAL RATINGS

Color
Rating
Description
Blue
Outstanding
Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. The proposal contains multiple strengths and no deficiencies.
Purple
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains at least one strength and no deficiencies.
Green
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Proposal has no strengths or deficiencies.
Yellow
Marginal
Proposal does not clearly meet requirements, and has not demonstrated an adequate approach and understanding of the requirements.
Red
Unacceptable
Proposal does not meet requirements and contains one or more deficiencies and is not awardable.

Subfactor 1: Technical Approach – Under this subfactor, the Government will evaluate the offeror’s proposed technical approach based on the following measures of merit:

Provides a detailed and effective plan that demonstrates the capability, knowledge, and expertise for:

(i) The agile software development process to include requirements analysis, hardware, software, testing cycles, and milestones for customer involvement in the software design, development, and fielding process planning (PWS Task 4, Subtask 7).

(ii) Managing multiple System configuration baselines and potential fielding strategies supporting worldwide deployments as described in Task 4, Subtask 1.

(iii) Developing, maintaining, and executing Quality Control processes to systematically provide for early identification of non-conforming supplies or services, metrics to track performance trends, and the corrective actions required to insure timely and acceptable delivery/performance in accordance with the PWS.

Subfactor 2: Staffing Approach – Under this subfactor, the Government will evaluate the offeror’s proposed staffing approach based on the following measures of merit:

Provides a detailed and effective staffing plan containing a personnel matrix which identifies the personnel resources to perform the PWS tasks. The plan shall provide a logical approach that ensures timely support and shall specifically address the following requirements:

(i) The identification of key positions and position descriptions which identify the educational and experience level and requisite security clearances of any individuals who will perform in a key position and other qualifications showing the key individual’s ability to comply with the minimum requirements of the PWS.

(ii) The subcontracting management plan to manage subcontractors that are part of the proposed solution to meet government subcontracting requirements. Include in the plan the functional correlation matrix that links the requirements of the PWS to the subcontractor(s) performing that function and how the small business utilization plan will be managed, implemented, and integrated appropriately so as to ensure successful performance of contract requirements.

In arriving at a best value decision, the Government reserves the right to give positive consideration, i.e., assign a strength, for performance in excess of objective requirements.

(2) Technical Risk Rating. Assessment of Technical Risk, which is manifested by the identification of weakness(es), considers potential for disruption of schedule, increased costs, or degradation of performance, the need for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .