Attch 6 - AF Form 66.pdf

PDF 162 KB Posted

Attached to
Repair Aircraft Parking Ramp, Phase II
Solicitation number
FA441824R0001
Issued by

About this file

This is a schedule of submittals (AF Form 66) for the solicitation to repair an aircraft parking ramp at an Air Force base (FA441824R0001). The schedule lists 149 submittal items required from the contractor before, during, and after construction. Pre-construction submittals are due within 45 days of notice to proceed and include safety plans, schedules, qualifications, and a quality control plan. During construction, the contractor must submit shop drawings, product data, samples, and test reports. Closeout submittals required upon project completion comprise operation and maintenance manuals, as-built drawings, and warranty documents. The schedule identifies the type of each submittal, specifications section referenced, number of copies, and required submission date.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER

DKFX 10-93394

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

1 01 11 00, Para 1.6.2, "Outage Requests"; G 5

2 01 11 00, Para 1.6.2, "Road Closure Requests"; G 5

3 01 11 00, Para 1.6, "Work Clearance"; G 5

01 11 00, Para , "Contractor's Proposed Laydown Area Plan"; G

5 01 14 00, Para 1.2.1.1, "List of Contact Personnel"; G 5

6 01 30 00, Para 1.2, "View Location Map"; G 5

01 30 00, Para 1.3, "Progress and Completion Pictures"; G

01 30 00, Para 1.5.2, "Resume for the proposed Superintendent"; G

9 01 32 16.00 20, Para 1.2, "Qualifications"; G 5

10 01 32 16.00 20, Para 1.3, "Project Schedule"; G 5

01 32 16.00 20, Para 1.4.1, "Initial Contract Progress Report (AF IMT 3065)"; G

01 32 16.00 20, Para 1.4.2, "Initial Contract Progress Schedule (AF IMT 3064)"; G

01 32 16.00 20, Para 1.3.3, "Project Schedule Updates";

G

01 32 16.00 20, Para 1.4.1, "Monthly Contract Progress Reports (AF IMT 3065)"; G

01 32 16.00 20, Para 1.4.2, "Monthly Contract Progress Schedules (AF IMT 3064)";

G

16 01 33 00, Para 1.6, "Submittal Register"; G 5

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0

1 P

RE

CO

NS

TR

UC

TI

ON

SU

BM

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

PROJECT TITLE

Repair Aircraft Parking Ramp - PH 2

SOLICITATION/CONTRACT NO.

FA441821C0029

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

AN

CE

DA

TA

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

OT

HE

RS

A

S

SP

EC

IF

IE

D

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

(c) Prior to Use.

(d) As Required.

DKFX 10-93394

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVEDSD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0

1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

PROJECT TITLE

Repair Aircraft Parking Ramp - PH 2

SOLICITATION/CONTRACT NO.

FA441821C0029

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

OT

HE

RS

A

S

SP

EC

IF

IE

D

17 01 35 13, Para 3.1.4, "Heavy Equipment and Vehicle List" 5

18 01 35 13, Para 3.1.3.2, "Existing Conditions Survey" 5

19 01 35 13, Para 3.1.2, "FAA Form 7460-1" 5

20 01 35 13, Para 3.1.2, "FAA Form 7460-2" 5

01 35 13, Para 3.1.3.1, "Construction Operations Plan"

01 35 23, Para 1.3, "Safety Plan Compliance Document

(SPCD)"; G

01 35 26, Para 1.6, "Accident Prevention Plan

(APP)"; G

24 01 35 26, Para 1.7, "Activity Hazard Analysis (AHA)"; G 5

25 01 35 26, Para 1.11, "Notifications and Reports" 5

26 01 35 26, Para 1.11.2, "Accident Reports"; G 5

01 35 26, Para 1.8.1, "Confined Space Entry Permit"

28 01 35 26, Para 1.8.1, "Hot Work Permit" 5

29 01 35 26, Para 1.13, "License Certificates" 5

30 01 45 00, Para 1.6, "QC Plan"; G 5

31 01 50 00, Para 1.3, "Construction Site Plan"; G 5

32 01 50 00, Para 3.4.1, "Traffic Control Plan"; G 5

33 01 50 00, Para 1.4, "Backflow Preventers" 5

34 01 50 00, Para 2.2.4, "Backflow Preventer Tests" 5

35 01 50 00, Para 1.4.1, "Backflow Tester" 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

DKFX 10-93394

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVEDSD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0

1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

PROJECT TITLE

Repair Aircraft Parking Ramp - PH 2

SOLICITATION/CONTRACT NO.

FA441821C0029

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

OT

HE

RS

A

S

SP

EC

IF

IE

D

36 01 50 00, Para 1.4, "Backflow Preventers" 5

01 54 00.00 31, Para 1.5.2.1, "Affirmative Procurement Reporting Form"; G

38 01 57 19.00 31, Para 1.7.1, "Preconstruction Survey"; G 5

39 01 57 19.00 31, Para 1.8.3, "Regulatory Notifications"; G 5

01 57 19.00 31, Para 1.5, "Environmental Protection Plan"; G

01 57 19.00 31, Para 1.6, "Dirt and Dust Control Plan";

G

42 01 57 19.00 31, Para 3.8.2, "Disposal Requirements" 5

01 57 19.00 31, Para 1.8.4, "Solid Waste Disposal Report"; G

01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR employee training records";

G

01 57 19.00 31, Para 1.8, "Waste Determination Documentation"

01 57 19.00 31, Para 3.6.2, "Waste Determination Documentation"

01 57 19.00 31, Para 1.8.1, "Disposal Documentation for Hazardous and Regulated Waste"

01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR Employee Training Records"

01 57 19.00 31, Para 1.7.2, "Solid Waste Disposal Permit"

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

DKFX 10-93394

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVEDSD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0

1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

PROJECT TITLE

Repair Aircraft Parking Ramp - PH 2

SOLICITATION/CONTRACT NO.

FA441821C0029

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

OT

HE

RS

A

S

SP

EC

IF

IE

D

01 57 19.00 31, Para 1.8.4, "Solid Waste Disposal Report"

01 57 19.00 31, Para 3.6.2, "Hazardous Waste/Debris Management"

52 01 57 19.00 31, Para 1.8.3, "Regulatory Notifications" 5

01 57 20.00 31, Para , "Material Safety Data Sheets

(MSDS)"

54 01 57 20.00 31, Para 1.8, "Green Procurement" 5

55 01 57 20.00 31, Para 1.8, "Green Procurement" 5

56 01 57 20.00 31, Para 1.3, "Recycling Report" 5

57 01 57 20.00 31, Para 1.3, "Recycling Report" 5

01 74 19.00 31, Para 1.3.3, "Construction Waste Management Plan"; G

01 78 00, Para 1.5.1, "Warranty Management Plan"

60 01 78 00, Para 1.5.4, "Warranty Tags" 5

61 01 78 00, Para 1.4, "Spare Parts Data" 5

62 01 78 00, Para 3.8, "Preventative Maintenance" 5

63 01 78 00, Para 3.8, "Condition Monitoring" 5

64 01 78 00, Para 3.8, "Inspection" 5

65 01 78 00, Para 1.5.1, "Instructions" 5

01 78 00, Para 3.6, "Operation and Maintenance Manuals"; G

67 01 78 00, Para 3.1, "As-Built Drawings"; G 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

DKFX 10-93394

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVEDSD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0

1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

PROJECT TITLE

Repair Aircraft Parking Ramp - PH 2

SOLICITATION/CONTRACT NO.

FA441821C0029

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

OT

HE

RS

A

S

SP

EC

IF

IE

D

68 01 78 00, Para 3.3, "Record Drawings"; G 5

01 78 00, Para 3.5, "As-Built Record of Equipment and Materials"

70 01 78 00, Para 3.4, "Final Approved Shop Drawings" 5

71 01 78 00, Para 3.9, "Interim

DD FORM 1354"; G 5

01 78 00, Para 3.9, "Checklist for DD FORM 1354"; G

73 02 41 00, Para 1.2.2, "Demolition Plan"; G 5

74 02 41 00, Para 1.1, "Existing Conditions" 5

75 03 30 53, Para 1.4, "Installation Drawings"; G 5

76 03 30 53, Para 2.2.3.1, "Air- Entraining Admixture" 5

03 30 53, Para 2.2.3.2, "Water-Reducing or Retarding Admixture"

78 03 30 53, Para 2.2.5, "Curing Materials" 5

03 30 53, Para 3.2, "Conveying and Placing Concrete"

80 03 30 53, Para 2.3, "Mix Design Data"; G 5

81 03 30 53, Para 2.3, "Ready- Mix Concrete" 5

82 03 30 53, Para 2.4.1, "Curing Compound" 5

83 03 30 53, Para 2.2.2, "Aggregates" 5

03 30 53, Para 2.1.3, "Concrete Mixture Proportions"; G

03 30 53, Para 3.8.3, "Compressive Strength Testing"; G

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

DKFX 10-93394

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVEDSD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0

1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

PROJECT TITLE

Repair Aircraft Parking Ramp - PH 2

SOLICITATION/CONTRACT NO.

FA441821C0029

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

OT

HE

RS

A

S

SP

EC

IF

IE

D

86 03 30 53, Para 3.8.3, "Slump"; G 5

87 03 30 53, Para 3.8.3, "Air Content" 5

88 03 30 53, Para 2.2.4, "Water" 5

89 03 30 53, Para 2.2.1, "Cementitious Materials" 5

90 03 30 53, Para 2.2.1.2, "Pozzolan" 5

91 03 30 53, Para 2.2.2, "Aggregates" 5

92 03 30 53, Para 2.3, "Delivery Tickets" 5

93 03 30 53, Para 2.4.1, "Curing Compound" 5

94 32 01 11.51, Para 1.2, "Schedule of work"; G 5

95 32 01 11.51, Para 3.1, "Paint Removal Process Plan"; G 5

96 32 01 11.51, Para 3.4, "Waste Collection

32 01 11.51, Para 1.4, "Mechanical paint removal equipment"

98 32 01 11.51, Para 1.5, "Test Section Results" 5

99 32 01 19.61, Para 2.1, "Sealants" 5

32 01 19.61, Para 3.5.2, "Manufacturer's Recommendations"

101 32 01 19.61, Para 2.1, "Sealants" 2

32 01 19.61, Para 2.3.1, "Blocking Media/Backup Materials"

103 32 01 19.61, Para 3.3.4.1, "Backer Rod" 2

104 32 01 19.61, Para 2.3.2, "Bond Breaking Tapes" 2

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

DKFX 10-93394

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVEDSD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0

1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

PROJECT TITLE

Repair Aircraft Parking Ramp - PH 2

SOLICITATION/CONTRACT NO.

FA441821C0029

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

OT

HE

RS

A

S

SP

EC

IF

IE

D

105 32 01 19.61, Para 2.1, "Sealants" 5

106 32 01 19.61, Para 3.1, "Equipment List" 5

107 32 01 19.61, Para 2.1, "Sealants" 5

32 01 29.61, Para 2.1.6, "Rigid Proprietary Repair Products"; G

32 01 29.61, Para 2.1.1.1, "Pigmented Liquid Membrane-Forming Compound"; G

32 01 29.61, Para 2.1.1.1, "Pigmented Liquid Membrane-Forming Compound"; G

111 32 01 29.61, Para 2.1.6.6, "Aggregate Service Record" 5

32 01 29.61, Para 3.5.1, "Absorbent Curing Material";

G

113 32 01 29.61, Para 2.1.4, "Joint Filler"; G 2

114 32 01 29.61, Para 2.1.3, "Joint Sealant"; G 2

115 32 01 29.61, Para , "Test Results" 5

116 32 01 29.61, Para 2.1.6.1, "Compressive Strength" 5

117 32 01 29.61, Para 2.1.6.2, "Bond Strength" 5

118 32 01 29.61, Para 3.5.1, "Absorbent curing material" 5

32 01 29.61, Para 2.1.1.1, "Pigmented Liquid Membrane-Forming Compound"

32 01 29.61, Para 2.1.1.1, "Pigmented Liquid Membrane-Forming Compound"

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

DKFX 10-93394

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVEDSD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0

1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

PROJECT TITLE

Repair Aircraft Parking Ramp - PH 2

SOLICITATION/CONTRACT NO.

FA441821C0029

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

OT

HE

RS

A

S

SP

EC

IF

IE

D

121 32 01 29.61, Para 2.1.4, "Joint Filler" 5

122 32 01 29.61, Para 2.1.3, "Joint Sealant" 5

123 32 12 13, Para 3.7, "Sampling and Testing" 5

124 32 12 15.13, Para 2.1, "Placement Plan"; G 5

125 32 12 15.13, Para 2.1.6, "Diamond Grinding Plan"; G 5

126 32 12 15.13, Para 2.4, "Mix Design"; G 5

32 12 15.13, Para 3.1, "Contractor Quality Control";

G

128 32 12 15.13, Para 2.2, "Aggregates" 2

129 32 12 15.13, Para 2.3, "Asphalt Binder" 2

130 32 12 15.13, Para 2.2, "Aggregates"; G 5

131 32 12 15.13, Para 3.1.3.10, "QC Monitoring" 5

132 32 12 15.13, Para 2.3, "Asphalt Binder"; G 5

133 32 12 15.13, Para 3.1.2, "Testing Laboratory" 5

32 12 15.13, Para 1.5, "Airfield Asphalt Pavement QC Manager"

32 12 15.13, Para 1.5, "Airfield Asphalt Pavement Inspector"

32 12 15.13, Para 1.5, "Airfield Asphalt Pavement Technician"

32 17 23, Para 2.1.1.2, "Surface Preparation Equipment List"; G

32 17 23, Para 2.1.2, "Application Equipment List";

G

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

DKFX 10-93394

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVEDSD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0

1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

PROJECT TITLE

Repair Aircraft Parking Ramp - PH 2

SOLICITATION/CONTRACT NO.

FA441821C0029

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

OT

HE

RS

A

S

SP

EC

IF

IE

D

139 32 17 23, Para 3.2, "Exterior Surface Preparation" 5

140 32 17 23, Para 1.3.1, "Safety Data Sheets"; G 5

32 17 23, Para 2.2.2.1, "Reflective media for airfields"; G

142 32 17 23, Para 2.2.1, "Waterborne Paint"; G 5

32 17 23, Para 2.2.2.1, "Reflective Media for Airfields"; G

144 32 17 23, Para 2.2.1, "Waterborne Paint"; G 5

145 32 17 23, Para 1.3.2, "Qualifications"; G 5

32 17 23, Para 2.2.2.1, "Reflective Media for Airfields"

147 32 17 23, Para 2.2.1, "Waterborne Paint" 5

32 17 23, Para 1.3.1, "Volatile Organic Compound"; G

149 32 17 23, Para 2.2.1, "Waterborne Paint"; G 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

AF Form 66

File details come from the government source that posted it. Updated .