B248 Question and Answer 09SEP22.pdf
PDF 100 KB Posted
- Attached to
- B248 Alert Facility Repair HVAC System Federal contract opportunity
- Solicitation number
- FA441822R0017
About this file
This document provides questions and answers related to solicitation number FA4418-22-R-0017 for repairs to the HVAC system at Alert Facilities Building B248 at Joint Base Charleston. The solicitation requires repair and replacement of the HVAC system including demolition of an existing dormer and construction of a new attic mechanical room, replacement of chilled water lines, cleaning of existing ductwork, and repair of damaged finishes to match existing. Proposals are due by September 21, 2022. The work includes demolition, construction, mechanical, and electrical work.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JB Charleston Offeror Question and Answer Form
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or
Note Reference, i.e. M- 101, Detail 2)
Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
NA
NA
Section 01 35 26 1.5.1
Section 01 45 00, para 3.2.5.1
Section 01 30 00
Section 01 91 00.15 10, Paragraph 1.1
Section 01 32 00 / 3.3.4
Solicitation Number Project Name:
Answer
Per the requirements the SSHO may be the QC for this project. However, it does not specifically address if the SSHO by also be the superintendent. Is a "triple hat" allowed" or is the Government requirement for two separate individuals to maintain a full-time presence at the jobsite?
Question
Question
Answer
With year-end pressure there are multiple projects with 2022 funds needing attention. Since this award is scheduled for 1st quarter 2023 funds can the proposal submission date be extended by two weeks?
FA4418-22-R-0017
Repair HVAC System, B248
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
5 Answer
This question appears to ask if an Economic Price Adjustment clause is anticipated to be included in the contract, and it is not. Proper inclusion of the clause requires negotiations and the Government intends to award without discussions (negotiations).
In accordance with Specification 01 45 00, paragraph 3.2.5.1 - The QC Manager may not perform the duties of the Project Superintendent. At least two dedicated individuals are required. The Superintendent and a separate QC/SSHO. "Triple Hatting" is not allowable.
In accordance with Specification 01 91 00.15 10, Paragraph 1.1, the Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor and must be financially and corporately independent of all other subcontractors. The commissioning firm must employe a lead commissioning specialist that coordinates all aspects of the commissioning process. Yes, the commissioning agent is required to be a third party.
Answer
Question
Per the specificiations section 1.5.1 a commissioning agent is required to be a separate agent contracted directly by the prime contractor. Please confirm enhanced commissioning is required and a 3rd party agent is necessary.
Answer
Question
Please confirm that per the specifications full buidling commissioning is required and a separate commissioning agent shall be required to provide functional performance testing for the entire building or just for the new areas?
Yes, the solicitation has been extended for 2 weeks with proposals due to JBC 21 Sep 2022 at 12:00 PM (EST).
Question
In response to the guidance issued by the DoD on 25 May 2022 (which relates to price increases for firm fixed price contracts) will FAR 16.203-2 be incorporated into the contract documents for this procurement effort if awarded? The Government directive is explicitly for Firm Fixed Priced Contracts and should be included in all FFP awards per the directive on 25 May 2022
JB Charleston Offeror Question and Answer Form
Specification Reference (Section & Paragraph
Reference, i.e. 23 00 00, para 1.3)
Drawing Reference (Sheet and Detail or
Note Reference, i.e. M- 101, Detail 2)
Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e.
Section M, Paragraph 2.3)
Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
Solicitation Number Project Name:
FA4418-22-R-0017
Repair HVAC System, B248
NOTICE TO OFFERORS
Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.
Section 01 91 00.15 10, Paragraph 1.1
Section 07 27 36
M-201, Detail 1
01 45 00 Quality Control
01 45 00, Paragraph 3.2.4.b
E001
E201, Keynote 4
The government requires a continuous air barrier for new modifications. Reference Drawing Sheet A-110 & A-111 for the locations of the new R-19 Spray Closed Cell Foam Insulation (with ignition barrier).
Spray foam air barriers and referenced and building commissioning reports show as a requirement. Please confirm that with the ASHRAE standards for continuous air barrier if the Government is requiring a continuous air barrier for the entire building, new modifications or if a continuous air barrier to meet ASHRAE is not required.
Answer
In accordance with Specification 01 91 00.15 10, Paragraph 1.2. Heating, Ventilating, Air Conditioning, and Refrigerant Systems (HVAC) and the Building Automation System (BAS) are required to be commissioned. Per Specification 01 91
00.15 10, Paragraph 1.5.1.b Performance Verification Tests of the controls system must be completed prior to starting Functional Performance Tests of Mechanical Systems.
Question
Can we get any info that will indiciate what is the exisitng 6" underground (specifically) CW pipe and what materials is the new 4" CW pipe needs to be as they could not find a spec on the underground CW pipe.
Answer
Reference Drawing Sheet M-201, Detail 1 - the "Existing 6" CHWS" & "Existing 6" CHWR" is assumed to be a pre-insulated Bonded Foam System with Schedule 40 PVC Carrier Pipe & Plastic Jacket. Reference Drawing Sheet M-201, Detail 1 & Sheet Note 2 - the "New 4" CHWS" & "New 4" CHWR" shall be pre-insulated PVC piping such as Thermacor's Chill-Therm pre-insulated piping material or approved equal.
Question
Can you please identify or define the term "License holder" which occurs (3) times in this document? (Pages 3 & 11). What license is it referring to? i.e. Business License? Driver's License, Fishing License?... Or State Contractor's License (which is not required on federal jobs)?
Answer
License holder means a subcontractor employee (or the prime contractor's employee) holding a State trade-specific contractor's license for an individual trade within Specification 01 45 00, paragraph 3.2.4.b including Air Conditioning/Heating, Electrical, and Fire Protection. The prime contractor is not required to hold a commercial construction license.
Question
Sheet E001 includes a Lighting Schedule, for type LS, We see no new light fixtures to be installed?
Please provide a lighting page or note describing quantity and locations of these fixtures.
Answer
Reference Drawing Sheet E201 - Light Fixture Type "LS" is to be installed in this location. Reference Keynote 4 - to be connected to the existing lighting circuit/controls serving this area.
Question
Answer